Addendum No. 1 Final.pdf

PDF 420 KB Posted

Attached to
591/25064. ABG; MDOT Engadine Garage Roof Replacement
Solicitation number
RFQ-171-250000000313-2
Issued by
Luce County, Michigan

About this file

This document is Addendum No. 1 for the MDOT - Engadine Garage Roof Replacement project, issued by U.P. Engineers & Architects, Inc. on April 10, 2025. The addendum modifies the original bid specifications for a roof replacement project at the Engadine Garage in Engadine, Michigan. Key changes include extending the bid due date to April 30, 2025 at 2:00 P.M. Eastern Time, adding acceptable membrane substitutions (Duro-Tuff 80 membrane and IB PVC Single Ply 80 Mil membrane), and providing demolition details such as removing two top courses of CMU and existing roof membrane. The addendum also requires contractors to attend a mandatory pre-bid walkthrough, register for state-funded projects, and include State Project Registry (SPR) documentation with their bid proposal.

The addendum includes specific technical modifications, such as replacing the DC specification book, detailing roof drain replacement at six locations, and requiring contractors to taper the roof to all roof drains. Additional requirements include reviewing an attached asbestos report and connecting new roof drains to existing 6" drain pipes. Contractors must verify existing pipe sizes and follow the attached roof drain detail. The project involves removing existing roof membrane, insulation, and drains, with existing roof thickness ranging from 5" to 7" depending on the roof section. Bidders must acknowledge receipt of the addendum on the bid form and include it with their proposal package.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

707 Ashmun Street Sault Ste. Marie, MI 49783

906-635-0511 • 800-867-0511 • Fax: 906-635-0612

Offices also in:

Houghton

Iron Mountain Ishpeming Marinette

U.P. Engineers & Architects, Inc. www.UPEA.com

[M12-05200]

ADDENDUM NO. 1

TO THE

MDOT – Engadine Garage Roof Replacement Engadine, MI

ADDENDUM NO. 1 is issued April 10, 2025, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.

File No. 591/25064.ABG MDOT – Engadine Garage Roof Replacement

Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.

GENERAL

1. See attached mandatory pre-bid walkthrough sign-in sheet.

2. Contractors to register for working on state-funded projects at the link below:

https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

3. See attached asbestos report.

4. Contractor to include documentation of their State Project Registry (SPR) with their bid proposal. If the SPR documentation is not included the bid will be deemed non-responsive.

SPECIFICATIONS

5. REPLACE the DC specification book provided in its entirety with the attached.

6. Specification Section 07 53 03 –

ADD Duro-Tuff 80 membrane as acceptable substitution for specified

EPDM.

ADD IB PVC Single Ply 80 Mil membrane as an acceptable substitution for specified EPDM

7. Extend bid due date one week. Due April 30, 2025 at 2:00 P.M. Eastern Time.

PLANS

8. AD101 –

A5 – DEMO SECTION – DEMO EXISTING TWO (2) TOP COURSES OF

CMU.

DEMO KEYNOTES –

3 – DEMO EXISTING ROOF MEMBRANE AND INSULATION TO

ROOF DECK. EXISTING ROOF THICKNESS RANGES FROM

6” TO 7” ON THE LOWER ROOF AND 5” ON THE UPPER

ROOF.

5 – REMOVE EXISTING ROOF DRAINS AND DISPOSE.

INSTALL NEW ROOF DRAINS AT NEW LOCATION. (TYP. AT

(6) LOCATIONS). SEE ATTACHED ROOF DRAIN DETAIL.

9. A101 – B1 - ROOF PLAN – Contractor to taper roof to all roof drains.

10. A101 – A4 – PARAPET DETAIL W/ROOF DRAIN

PROPOSED NEW ROOF DRAIN. CONNECT TO EXISTING 6” DRAIN

PIPE (CONTRACTOR TO VERIFY EXISTING PIPE SIZE). SEE

ATTACHED NEW ROOF DRAIN DETAIL.

END OF ADDENDUM NO. 1

Prepared by:

U.P. Engineers & Architects, Inc

FLASHING

CLAMP AND

GRAVEL STOP

REMOVABLE DOME

METAL DECK

BEAM CLAMP

HANGER

CLEAN OUT

DECK PLATE

RIGID INSULATION

JOB No:DATE: DRAWING:DRAWN:

Houghton Iron Mountain Ishpeming

Sault Ste. Marie Marinette

U.P. ENGINEERS &

ARCHITECTS, INC.

M12-05200

DTMB

ENGADINE GARAGE ROOF

4/9/2025SP SKP501

NOT TO SCALE1

ROOF DRAIN DETAIL

Insert from: "M12-05200 DTMB-MDOT Engadine Garage Roof_Roof Drain Detail.pdf"
Sheets
SKP501 - Unnamed