This is Addendum No. 1 to a Request for Proposal issued by the San Bernardino County Flood Control District for geotechnical services on the Magnolia Storm Drain Project (Work Order F02861), located within the Cities of Chino and Ontario, California. The addendum addresses 15 questions submitted by proposers and provides clarifications on project specifications and requirements. Key technical details include confirmation that as-built plans and 35% preliminary plans are available; the proposed storm drain depth varies with a maximum of 25 feet; reinforced concrete box (RCB) sizing includes options of 12'x7', 10'x8', 10'x9', and 10'x10'; and boring locations can be relocated within approximately 20 feet of indicated positions to minimize traffic impacts and utility conflicts, provided a geotechnical engineer provides justification. The proposal deadline remains March 13, 2026 at 12:00 p.m., submitted via the ePro system. An additional scope requirement was added mandating that proposers provide existing pavement sections and recommendations for pavement replacement, with costs included in the fee proposal.
The addendum clarifies that all permit fees are the responsibility of the proposer and must be included in fee proposals, except for no-fee permits from the San Bernardino County Flood Control District. Permits from both the City of Chino and City of Ontario will be required for boring locations within city limits. The San Bernardino County Flood Control District contract language cannot be modified, and proposers' requests to alter indemnification, errors and omissions, additional insured, proof of coverage, umbrella liability insurance, and time-of-essence clauses for insurance purposes were denied. Utility location services and drilling services are classified as subconsultants requiring separate fee proposal sheets. Proposers must acknowledge receipt of Addendum No. 1 with a signed bidder's certification from the same authorized signatory as the proposal; proposals lacking this certification will not be accepted. Attachment A contains as-built drawings and Attachment B contains preliminary plans showing profile views with 100-year storm event flow parameters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1 Page 1 of 3 RFP for Proposal No. PWG126-ADMIN-6298 March 4, 2026
ADDENDUM NO. 1
MAGNOLIA STORM DRAIN PROJECT
WORK ORDER: F02861
AREA: WITHIN CITY OF CHINO AND CITY OF ONTARIO
DEADLINE FOR PROPOSAL: 12:00 PM, MARCH 13, 2026
By Email via ePro System
Questions on EPRO:
1. Can you please provide the as-built plans for the existing storm drain?
Yes, for your reference, see attached as-builts drawings.
2. Can you please provide the proposed depth and size of the new RCP/RCB?
The proposed depth varies, with a maximum depth of 25’. The proposed RCB sizing varies and includes 12’x7’, 10’x8’, 10’x9’ and 10’x10’ RCB. See attached Preliminary Plans.
3. What is the invert of the proposed storm drain? What is the diameter/size of the proposed RCP/RCB?
The proposed depth varies, with a maximum depth of 25’. The proposed RCB sizing varies and includes 12’x7’, 10’x8’, 10’x9’ and 10’x10’ RCB. See attached Preliminary Plans.
4. Are the boring locations provided exact or can they be moved transversely within the roadway.
The boring locations can be moved as recommended by a geotechnical engineer. Please provide an explanation or reasoning for the proposed locations.
5. What is the typical depth of the proposed invert? And if varies, what is the maximum depth?
The proposed depth varies, with a maximum depth of 25’. See attached Preliminary Plans.
6. What is the fee for the SBC Flood Control District Permit?
The proposed boring locations are located within the City of Chino and City of Ontario. A permit from both Cities will be required. All permit fees will be the responsibility of the Proposer; please include them in your fee proposal. If a boring location is needed within the San Bernardino County Flood Control District’s right-of-way, a no-fee permit will be issued.
7. What is the turnaround time for the SBC Flood Control District permit review?
It takes about two weeks for review and four weeks to obtain a permit from the San Bernardino County Flood Control District.
8. What is the anticipated depth of the proposed storm drain pipeline?
The proposed depth varies, with a maximum depth of 25’. See attached Preliminary Plans.
9. Are there any preliminary plans showing the proposed storm drain alignment?
See attached 35% Preliminary Plans.
ADDENDUM NO. 1 Page 2 of 3
10. The provided Boring Location Maps indicate that the majority of the proposed borings are located in the center of the existing streets. Can these borings be relocated within an approximate 20-feet radius of the indicated location to minimize impacts to traffic control and potential conflicts with existing subsurface utilities?
Yes, the boring locations can be moved to minimize impacts due to temporary traffic control and potential conflicts with subsurface utilities.
11. We have been informed that the following sections of the contract language are uninsurable, and ask that the following changes so that the contract can be covered by insurance.
Page 22 Section 42. Errors, Omissions and/or Conflicts – We kindly request that the words “Consultant negligent acts, “be added to this sentence immediately before the word “errors”. We also kindly seek the deletion of the words “an/or conflicts” from the sentence.
Page 23 Section B. Paragraph 1. Indemnification – We kindly request that this paragraph be replaced with the following paragraph:
“Consultant shall defend and indemnify District for claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant. In no instance shall Consultant’s duty to indemnify exceed Consultant’s share of proportional negligence. This indemnification expressly excludes the duty of Consultant to defend the District as respects professional liability claims. However, the absence of the duty to defend shall not preclude the District from seeking its reasonable attorneys’ fees as part of its damages where and to the extent such fees are caused by Consultant’s negligence.
This Agreement incorporates by reference the provisions of Civil Code section 2782.8, including, but not limited to, the provisions that concern the duty and cost to defend the District.”
The San Bernardino County Flood Control District contract language cannot be changed.
12. We have been informed that the following sections of the contract language are uninsurable, and ask that the following changes so that the contract can be covered by insurance.
Page 23 Section B Additional insured – We kindly request that the words “arising out of the” in the third line of the first sentence of this paragraph be replaced with the words, “to the extent arising out of the Consultant’s…”. We also request the ISO number at the end of the paragraph be replaced with following numbers’ “CG 2020 04 13 & CG 2037 04 13”.4.
Page 24 Section B Proof of Coverage: We kindly request that the words “complete certified” as well as the words “policies and” be deleted from the last line of the paragraph.
Page 25 Section B Umbrella Liability Insurance: We kindly ask that the words “…and shall include a “dropdown” provision providing primary coverage for any liability not covered by the primary policy” be deleted from the second sentence of this paragraph.
Page 20 Section 35 Time is of the Essence: We kindly request to replace “time is of the essence” with “time is an important element” to avoid coverage issues under our professional liability policy.
The San Bernardino County Flood Control District contract language cannot be changed.
13. Page 9 of the RFP states”2, Table of Contents – All pages of the Proposal, including the enclosures, must be clearly and consecutively numbered and correspond to the Table of Contents.” Does this mean that we need to list numbers 6 and 9 which are reserved but not requiring any information on the TOC and within our submission? Or can we just omit those sections while responding to the rest of the criteria? For example the TOC will have “5, License, Permits, and/or Certifications then 7. Project Team Organizational Chart then 8. Proposal Description then 10. Certification Regarding Debarment or Suspension” Or do we need to include the sections?
The proposal shall list numbers 6 and 9 as reserved and respond to the other sections in accordance with the RFP.
ADDENDUM NO. 1 Page 3 of 3
14. Are we allowed to include a cover letter to this submission? If so, does it matter where in the submission order it is placed as long as it is listed in the Table of Contents?
Yes, a cover letter can be added with the Cover Page (or Attachment A). Also, refer to Section VI (B) of RFP for proposal format.
15. Are utility location services and drilling services considered a subconsultant or a subcontractor under this RFP?
Per Section I of the RFP, Proposers shall also include a separate Fee Proposal Sheet(s) for each subconsultant, if any. Also, see Section IV (S), (T), (U), and Section X (21) for additional provisions related to subconsultants.
Additional Scope of Work:
Provide existing pavement sections and recommendations for pavement replacement. Include cost in the fee proposal.
ATTACHMENTS:
Attachment A: Magnolia Storm Drain As-Builts Attachment B: Magnolia Storm Drain Preliminary Plans
The addition of these requirements shall be considered in concert with existing documents in preparation of bids. THE BIDDER’S CERTIFICATION FOR THIS ADDENDUM NO. 1 SHALL BE SIGNED BY THE SAME
PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY
proposal not accompanied by a signed BIDDER’S CERTIFICATION (below) acknowledging receipt of this Addendum No. 1 will NOT be accepted.
Noel Castillo, Director Department of Public Works
By:
Lawrence G. White, P.E., Chief
Flood Design Division
LW:MR
BIDDER'S CERTIFICATION:
By my signature hereunder, I acknowledge receipt of Addendum No. 1 and I fully understand the intent and detail of Addendum No. 1, which I have considered in my preparation of the attached proposal.
Bidder's Signature Date Note: The page containing the executed BIDDER’S CERTIFICATION (just this page), must be included with the proposal.
Attachment A:
Magnolia Storm Drain As-Builts
Attachment B:
Magnolia Storm Drain
Preliminary Plans
PROFILE VIEW
Q100 = XXX (CFS)
V100 = XXX (FPS)
PC
: 1
0+
.4
8+
.0
EP
: 3
+7 2.
NOT FOR CONSTRUCTION
V100 = XXX (FPS)
V100 = XXX (FPS)
V100 = XXX (FPS)
V100 = XXX (FPS)
Q100 = XXX (CFS)
V100 = XXX (FPS)