DWR - Electric Vehicle Supply Equipment - Chrisman Pumping Plant
Solicitation number
51st Street Roadway Improvements
Issued by
Kern County, California

About this file

This is Addendum No. 1 to the construction drawings issued by the State of California Department of General Services, Executive Office of Sustainability for the DWR Electric Vehicle Supply Equipment project at Chrisman Pumping Plant in Kern County, California (Project No. 000000000013639). The addendum modifies responsibility for the provision, installation, and commissioning of electrical vehicle charging stations (EVCS) from the state vendor to the awarded construction contractor. The contractor shall install LEVEL 2 non-networked dual port pedestal chargers with a minimum 18-foot cable length and cord management system, compliant with UL 2594, UL 223, UL 50E, NFPA 70, and FCC EMI standards (Class A or B). Chargers must feature SAE J1772-compliant connectors, operate within a 208-240 voltage range with maximum output of 7.2 KW, be compatible with 40AMP circuit breakers, and be anchored using Hilti KB-TZ2 stainless steel anchor bolts or approved equivalents. The contractor is responsible for all final terminations and splicing. The bid due date is July 28, 2026, and the addendum was issued June 10, 2026.

The project scope includes labor, materials, and services for complete EVSE infrastructure installation with all required wiring, testing, saw cutting, trenching, backfilling, and site restoration. The contractor must provide ADA-accessible charging ports and install bollards if required. No pricing terms, funding sources, set-asides, or contract values are specified in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

RESDMSTR: 12/23/202 00 91 13 - 1 of 2

000000000013639

STATE OF CALIFORNIA, DEPARTMENT OF GENERAL SERVICES

EXECUTIVE OFFICE

OFFICE OF SUSTAINABILITY

Date: June 10, 2026 DOCUMENT 00 91 13

ADDENDUM No. 1 TO THE CONSTRUCTION DRAWINGS

Bid Due Date – July 28, 2026

DWR – ELECTRIC VEHICLE SUPPLY EQUIPMENT – CHRISMAN PUMPING PLANT

KERN COUNTY, CALIFORNIA

PROJECT NO. 000000000013639

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON BID FORM AND

REVISE THE CONTRACT DOCUMENTS AS FOLLOWS:

CONSTRUCTION DRAWINGS

CONSTRUCTION DRAWINGS (DATED 12/15/2025)

1. SHEET T0.01

A. DELETE EVSE NOTE

EVCS NOTE:

ELECTRICAL VEHICLE CHARGING STATION (EVCS) SHALL BE PROVIDED BY THE

STATE (DEPARTMENT OF GENERAL SERVICES) AND INSTALLED BY THE CURRENT

ELECTRIC VEHICLE CHARGING STATION STATE VENDOR. ALL FINAL TERMINATIONS

AND/OR SPLICING FOR THE EVCS SHALL BE THE RESPONSIBILITY AND PERFORMED

BY THE STATE VENDOR.

2. SHEET E2.00

A. DELETE GENERAL NOTE 3

GENERAL NOTE 3:

SEE EVCS NOTE ON SHEET T0.01.

3. SHEET T0.01

A. ADD EVSE NOTE

EVCS NOTE:

ELECTRICAL VEHICLE CHARGING STATIONS (EVCS) SHALL BE PROVIDED,

INSTALLED AND COMMISSIONED BY THE AWARDED CONSTRUCTION CONTRACTOR

(CONTRACTOR). EVCS UNITS SHALL BE COMMERCIAL GRADE, SUITABLE FOR LONG

TERM OUTDOOR USE AND COMPLIANT WITH UL 2594, UL 223, UL 50E, NFPA 70 AND

EMI (FCC PART 15 CLASS A OR B).

ADDENDUM NO. 1

RESDMSTR: 12/23/202 00 91 13 - 2 of 2

000000000013639

EVCS SHALL BE LEVEL 2 NON-NETWORKED DUAL PORT PEDESTAL CHARGERS WITH

MINIMUM CABLE LENGTH OF 18 FEET AND HAVE A CORD MANAGEMENT SYSTEM.

CHARGERS SHALL HAVE A SAE J1772 COMPLIANT CONNECTOR. CHARGERS TO BE

ANCHORED WITH HILTI 'KB-TZ2' STAINLESS STEEL ANCHOR BOLTS OR APPROVED

EQUAL. CHARGERS SHALL BE COMPATIBLE WITH 208-240 VOLTAGE RANGE WITH A

MAXIMUM CHARGER OUTPUT OF 7.2 KW. CHARGERS SHALL BE COMPATIBLE WITH

THE 40AMP CHARGER CIRCUIT BREAKERS AND THE ELECTRICAL CONDUCTOR

SIZES ON THE CONSTUCTION DRAWINGS. ALL FINAL TERMINATIONS AND/OR

SPLICING FOR THE EVCS SHALL BE THE RESPONSIBILTY AND PERFORMED BY THE

CONTRACTOR.