This Addendum No. 1 is issued by the State of Michigan Department of Technology, Management and Budget on behalf of the Department of Natural Resources for the Sleepy Hollow State Park Campground Electrical Improvements project. The project encompasses upgrading the electrical system within the modern campground's north loop, including installation of new pedestals, wiring, distribution cabinets, and miscellaneous electrical infrastructure, along with campsite upgrades for ADA access involving grading, drainage, and concrete paving improvements. The bid opening date is January 29, 2020, at 2:00 pm local time, with bids to be submitted electronically through the SIGMA VSS website. The contract duration is 90 calendar days from the Notice to Proceed. A pre-bid meeting was held prior to the addendum issuance, and site examination inquiries should be directed to Dave Zmikly at Sleepy Hollow State Park.
The addendum clarifies four key items: correcting the bid due date to Wednesday, January 29, 2020; establishing a secondary submittal procedure via email to Bruce Watkins and Linda Feldpausch for bidders experiencing technical difficulties with SIGMA; specifying paving section requirements including 4-inch MDOT 21AA with 2-inch limestone fines topping for gravel pathways, or 6-inch MDOT 21AA for HMA pads if alternates are not accepted; and requiring 75 feet of silt fence installation and removal costs per improved campsite. Two signed copies of the addendum must be returned with the bid proposal. A performance bond and payment bond are required for all bids exceeding $50,000, and each bid must include a five percent bid guarantee. Bidders must acknowledge receipt of all addenda on the bid summary form, and no substitutions or "or equal" proposals are permitted after bid opening except as provided in the General Conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19103 Plans 4.pdf | ||
| 19103 Specifications.pdf | ||
| 19103 Plans 1.pdf | ||
| Advertisement 19103.pdf | ||
| 19103 Plans 3.pdf | ||
| 19103 Plans 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 3/11)
STATE OF MICHIGAN Date Issued: January 24, 2020 Department of Technology, Management and Budget Index No(s): 5813 Facilities and Business Services Administration File No: 751/19103.BDW 3111 W. St. Joseph Street Department: DNR
Lansing, MI 48917 Project Name: Sleepy Hollow State Park Campground Electrical Improvements
Subject: Addendum #1 Bid Opening Date: January 29, 2020 Professional: Nowak & Fraus Engineers
ADDENDUM #1
TO: All bidders
SUBJECT: Revision to Bidding Documents
INTENT: This Addendum is issued to
Item 1 –Clarify bid due date / Pre-Bid Attendance
The documents incorrectly noted bid due date. The correct due date is Wednesday, January 29, 2020. An amended bid summary form has been provided for use, noting the correct date. The attendance sheet from the pre-bid meeting is included for bidder reference.
Item 2 –Secondary Bid Submittal
As noted at the pre-bid meeting, should bidders have technical problems uploading bids to the
SIGMA, please email bid documents to the Bruce Watkins (WatkinsB1@michigan.gov>) and Linda Feldpausch (FeldpauschL1@michigan.gov) prior to the bid deadline. The bid should only be reflected in the pdf attachment and not in the body of the email. The body of the email should explain why SIGMA did not work and include any notices from SIGMA if there are any.
Item 3 –Paving Section Clarifications
As noted at the pre-bid meeting, the gravel pathway noted on sheet C-2 should be installed with a 4” layer of MDOT 21AA, and topped with 2” layer of limestone fines. The use areas adjacent to proposed HMA pads are simply restored with grass. No gravel surface is required. If HMA pads are not used, due to alternate acceptance, the pads shall be installed with 6” layer of MDOT 21AA
(CIP).
Item 4 –Silt Fence Placement
Contractor shall include costs for 75’ of silt fence installation and removal for each campsite to be improved with concrete or HMA. Silt fence will be placed based upon engineer / DTMB field rep direction, based upon existing site conditions.
ACKNOWLEDGEMENT: Two copies of this Addendum, properly signed in the space provided below, must be acknowledged and returned with the bidder's proposal for submission of a valid proposal. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
Bidder's Signature Date
Bruce Watkins, P.E.
Project Director
Bidding and Contract Document Project Name: Sleepy Hollow SP – Campground Electrical File No. 751/19103.BDW
DTMB-0401D (R 05/19)
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
751/19103.BDW
FUNDING CODE
DEPARTMENT/AGENCY
Department of Natural Resources
CONTRACT TIME(S)
90 Calendar Days From NTP
PROJECT NAME
Sleepy Hollow State Park Campground Electrical
LOCATION
Sleepy Hollow State Park Modern Campground
BID OPENING DATE
January 29, 2020 at 2:00 pm Local Time
FOR AN EXAMINATION OF THE SITE CONTACT:
Dave Zmikly Sleepy Hollow State Park
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
FEDERAL I.D. NUMBER (LAST 4 ONLY)
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate2: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Builders Risk Insurance is NOT provided by the State of Michigan.
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE
ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Upgrade campground electrical system within the modern campground (north loop), including new pedestals, wiring, distribution cabinets and other misc. electrical infrastructure. In addition, installation of campsite upgrades for ADA access, including grading, drainage and concrete paving improvements.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":false}
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":false}
File details come from the government source that posted it. Updated .