19103 Plans 2.pdf

PDF 4 MB Posted

Attached to
751/19103. BDW Sleepy Hollow SP - Electrical Improvements
Solicitation number
RFQ 171 200000000098 2
Issued by
Shiawassee County, L'anse Village, Michigan

About this file

This is a civil engineering plan document for the State of Michigan's Department of Technology, Management and Budget, specifically for Sleepy Hollow State Park Electrical Improvements project. The document, prepared by NF Engineers (Civil Engineers, Land Surveyors, Land Planners located in Pontiac, Michigan), presents comprehensive site plans for the North Campground improvement project designated as project number 25350. The project is divided into three distinct areas and includes construction of ADA-compliant camper pads with electrical pedestals, drainage improvements, and associated site work. The plans indicate design phases completed at 50% on April 24, 2019, and 90% on November 18, 2019, with bid documents issued on January 10, 2020. The scope encompasses installation of approximately 100 individual electric pedestals serving campsites, concrete pad construction (6 inches reinforced with wire mesh), asphalt and gravel pathway repairs, culvert installation and removal, tree removal and clearing, and coordination with existing utility infrastructure including water mains, sanitary sewer lines, and Consumers Energy electrical conduit.

The project requires coordination of multiple site systems including drainage swales, ditches, and culvert work to establish positive drainage throughout the campground. Specific construction details establish ADA accessibility standards with concrete surface slopes between 1% and 1.6%, operational parts positioned between 15 and 48 inches from ground level, and camper pad dimensions of 30 feet by 32 feet with 16-foot extensions. The electrical infrastructure utilizes varying conductor sizes (#3/0, #2/0, #1/0, #2, and #1 designations) based on individual pedestal locations. The plans note that utilities shown are based on partial survey data and historical information, with contractors required to employ utility location services to identify potential conflicts. A deductive alternate for asphalt placement is included, with provisions to eliminate HMA layers upon owner selection, substituting 21AA aggregate base as the top of pavement surface.

View the file

Other files

File Type Posted
19103 Plans 4.pdf PDF
19103 Specifications.pdf PDF
19103 Plans 1.pdf PDF
Advertisement 19103.pdf PDF
19103 Plans 3.pdf PDF
Addendum No. 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J C

E

N G

B

Y

P R

O J E

T

O

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

I L

E

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

J C

E

P R

O J E

I N

D E

X

P C

A

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

R e v i e w

D A

T E

C I V

G

I N

E E

R

P

L

U

R I

B U

E

S

U

N

U

M

C

I

R

C

U M

S

P

I

C

E

S

I

Q

U

E R

E I

S P

E N

I N

S U

L A

M

A M

O E

N

A

M

D

EP

A

RT

M

EN

T O

F

TE

CH

N

O

LO

G Y

, M A

N A

G

EM

EN

T

A N

D B

U D

G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A

CI

LI

TI

ES

A

D M

IN

IS

TR

A

TI

O

N D

ES

IG

N A

N D

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

P R

O J E

D

S

C R

I P

T I O

N

S L

E E

P

H

L

L O

W

S

T A

P

A R

K

E L

E C

T R

I C

M

P R

O V

E M

E N

T S

S

S

U T

T O

N

P h a s e

P h a s e

B i d

D o c u m e n t s

N

N O

R T

H

C

A M

P G

R O

U N

D

I M

P R

O V

E M

E N

T

P

L A

N

A R

LEGEND

TYPICAL ADA CAMPER PAD

SCALE: NTS

32'

16'

16'

V A

R I E

S

EX. EDGE

OF ROAD

PROPOSED ELECTRIC

PEDESTAL

ALL CONCRETE SURFACE

SLOPES TO BE BETWEEN 1% -

1.6% FOR ADA ACCESSIBILTY

ALL OPERABLE PARTS

MUST BE BETWEEN 15"

AND 48" FROM THE

GROUND.

2' BITUMINOUS BUTT JOINT.

5' MINIMUM

(MAY BE LONGER TO FIT

INSTALLED PEDESTAL)

5' MINIMUM

VARIES (SEE CIVIL

PLANS FOR LIMITS

6" MAXIMUM OFFSET

FROM FACE OF

PEDESTAL TO EDGE OF

CONCRETE. MAKE

ADJUSTMENTS IN

CONCRETE PAD LENGTH

AS MAY BE NECESSARY

TO FIT PEDESTAL.

PROPOSED 6" REINFORCED

CONCRETE CAMPER PAD

EX. UTILITY LINES

TREE INFORMATION

PAVEMENT REPAIRS

4" ASPHALT PAVEMENT REPAIR

ADA PAD DIMENSIONS

PAVING LEGEND

ADA CAMPSITE IMPROVEMENTS

6" CONCRETE SECTION

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

AREA 2

AREA 1

AREA 3

NORTH CAMPGROUND

RADIUS ALONG INSIDE

OR OUTSIDE OF PAD

PER PAD LAYOUT.

+/-10'

TYPICAL EYE-BROW CAMPER PAD

SCALE: NTS

REMOVAL LEGEND

TREE REMOVALS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#3/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#2/0

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#1

AutoCAD SHX Text 3-#2

AutoCAD SHX Text 3-#1/0

AutoCAD SHX Text 3-#2

AutoCAD SHX Text

ELECTRIC PEDESTAL -17/15

AutoCAD SHX Text

ELECTRIC PEDESTAL -13/11

AutoCAD SHX Text

ELECTRIC PEDESTAL -9/7

AutoCAD SHX Text

ELECTRIC PEDESTAL -5/3

AutoCAD SHX Text

ELECTRIC PEDESTAL-1

AutoCAD SHX Text

ELECTRIC PEDESTAL -2/54/4/52

AutoCAD SHX Text

ELECTRIC PEDESTAL -6/50/8/48

AutoCAD SHX Text

ELECTRIC PEDESTAL -10/46/12/44

AutoCAD SHX Text

ELECTRIC PEDESTAL -14/42/16/41

AutoCAD SHX Text

ELECTRIC PEDESTAL -18/40/19/38

AutoCAD SHX Text

ELECTRIC PEDESTAL -20/36/21/34

AutoCAD SHX Text

ELECTRIC PEDESTAL -22/32/26/30

AutoCAD SHX Text

ELECTRIC PEDESTAL -23/24

AutoCAD SHX Text

ELECTRIC PEDESTAL -25/27

AutoCAD SHX Text

ELECTRIC PEDESTAL -28/29

AutoCAD SHX Text

ELECTRIC PEDESTAL -33/75/31/76

AutoCAD SHX Text

ELECTRIC PEDESTAL -37/71/35/73

AutoCAD SHX Text

ELECTRIC PEDESTAL -67/39/69

AutoCAD SHX Text

ELECTRIC PEDESTAL -49/59/47/61

AutoCAD SHX Text

ELECTRIC PEDESTAL -53/55/51/57

AutoCAD SHX Text

ELECTRIC PEDESTAL -56/100/58/99

AutoCAD SHX Text

ELECTRIC PEDESTAL -60/98/62/96

AutoCAD SHX Text

ELECTRIC PEDESTAL -64/94/66/92

AutoCAD SHX Text

ELECTRIC PEDESTAL -68/90/70/88

AutoCAD SHX Text

ELECTRIC PEDESTAL -72/86

AutoCAD SHX Text

ELECTRIC PEDESTAL -74/84/78/82

AutoCAD SHX Text

ELECTRIC PEDESTAL -77/79

AutoCAD SHX Text

ELECTRIC PEDESTAL -80/81

AutoCAD SHX Text

ELECTRIC PEDESTAL -83/85

AutoCAD SHX Text

ELECTRIC PEDESTAL -87/89

AutoCAD SHX Text

ELECTRIC PEDESTAL -91/93

AutoCAD SHX Text

ELECTRIC PEDESTAL -95/97

AutoCAD SHX Text

CLEARING (OLD PLAYGROUND)

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

NORTH BATHROOM

AutoCAD SHX Text

ELECTRIC PEDESTAL -45/63/43/65

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

EX. JUG FILLER

AutoCAD SHX Text

EX. JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

JUG FILLER

AutoCAD SHX Text

PROPANE TANK

AutoCAD SHX Text

EX. JUG FILLER

AutoCAD SHX Text

WOOD BRIDGE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

4X4 POST

AutoCAD SHX Text

6" N12 PIPE

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

FIREPIT

AutoCAD SHX Text

TREE LINE (TYP.)

AutoCAD SHX Text

CLEARED PATHWAY

AutoCAD SHX Text

CLEARED PATHWAY

AutoCAD SHX Text

ELECTRIC CABINET

AutoCAD SHX Text

TREE LINE (TYP.)

AutoCAD SHX Text

WATER SPOUT

AutoCAD SHX Text

12" CMP PIPE

AutoCAD SHX Text

12" CMP PIPE

AutoCAD SHX Text

12" CMP PIPE

AutoCAD SHX Text

6" N12 PIPE

AutoCAD SHX Text

END SECTION INV 811.63

AutoCAD SHX Text

END SECTION INV 811.74

AutoCAD SHX Text

CONSUMERS ENERGY PRIMARY ELEC CONDUIT (APPROX. LOCATION)

AutoCAD SHX Text

6" SAN. SEWER

AutoCAD SHX Text

6" SAN. SEWER

AutoCAD SHX Text

SAN. MH

AutoCAD SHX Text

6" SAN. SEWER

AutoCAD SHX Text

SAN. MH

AutoCAD SHX Text

SAN. MH

AutoCAD SHX Text

2" WATER MAIN (PER RECORDS)

AutoCAD SHX Text

1 " WATER MAIN12" WATER MAIN

AutoCAD SHX Text

1 " WATER MAIN12" WATER MAIN

AutoCAD SHX Text

1 " WATER MAIN12" WATER MAIN

AutoCAD SHX Text

1 " 12" WATER MAIN

AutoCAD SHX Text

1 " WATER MAIN12" WATER MAIN

AutoCAD SHX Text

1 " WATER MAIN12" WATER MAIN

AutoCAD SHX Text

1 " 12" WATER MAIN

AutoCAD SHX Text

1 " 12" WATER MAIN

AutoCAD SHX Text

PROPOSED USABLE AREA

AutoCAD SHX Text

PROPOSED USABLE AREA

AutoCAD SHX Text

PROPOSED USABLE AREA

AutoCAD SHX Text

SAWCUT AND REMOVE EDGE OF PAVEMENT TO PROVIDE 2 FT. BUTT JOINT (TYP.)

AutoCAD SHX Text TYPICAL ADA CAMPSITE IMPROVEMENT (SEE NOTES ON C2) CONTRACTOR SHALL COORDINATE PEDESTAL PLACEMENT PER DETAIL.

AutoCAD SHX Text SEE ELECTRICAL PLANS FOR THE REQUIRED DEMOLITION OF ALL EXISTING ELECTRICAL INFRASTRUCTURE.

AutoCAD SHX Text REMOVE TREES/BRUSH AND REGRADE AS NEEDED TO MATCH PROPOSED CAMPER PAD/USABLE AREA AND EXISTING GRADES AND PROVIDE POSITIVE DRAINAGE (TYP.)

AutoCAD SHX Text

REMOVE CULVERT

AutoCAD SHX Text

REMOVE CULVERT

AutoCAD SHX Text REMOVE BRUSH AND SMALL TREES, RE-GRADE AND EXCAVATE EXISTING AND NEW DITCHES/SWALES FROM EXISTING CULVERT #1 (OULET) AT DOWN STREAM TO 12" CMP CULVERT AT UPSTREAM END, CULVERT #4. RE-GRADE SITES AS NEEDED TO PROVIDE POSITIVE DRAINAGE TO SWALES AND DITCHES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXCAVATION/GRADING LIMITS AND CLEARING/GRUBBING FOR DRAINAGE IMPROVEMENTS

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text

INSTALL 12" CMP CULVERT WITH STD. END SECTIONS

AutoCAD SHX Text

INSTALL 12" CMP CULVERT WITH STD. END SECTIONS

AutoCAD SHX Text

REMOVE CULVERT

AutoCAD SHX Text

INSTALL 12" CMP CULVERT WITH STD. END SECTIONS

AutoCAD SHX Text

INSTALL GRAVEL/LIMESTONE FINES PATHWAY

AutoCAD SHX Text

SAWCUT, REMOVE AND REPLACE ASPHALT PAVEMENT

AutoCAD SHX Text

SAWCUT, REMOVE AND REPLACE ASPHALT PAVEMENT

AutoCAD SHX Text

INSTALL 6" N-12 CULVERT

AutoCAD SHX Text

REMOVE CULVERT

AutoCAD SHX Text

INSTALL 12" CMP CULVERT WITH STD. END SECTIONS

AutoCAD SHX Text

SAWCUT, REMOVE AND REPLACE ASPHALT PAVEMENT

AutoCAD SHX Text

EXCAVATION/GRADING AND CLEARING/GRUBBING LIMITS FOR DRAINAGE IMPROVEMENT

AutoCAD SHX Text

REMOVE EX. CAMPER PAD (TYP) FOR SITES WITH PROPOSED HMA INSTALLATION

AutoCAD SHX Text PLACEMENT OF HMA LAYERS WILL BE ELIMINATED UPON OWNER SELECTION OF THE DEDUCTIVE ALTERNATE. IF HMA IS ELIMINATED, PROPOSED TOP OF PAVEMENT GRADE SHALL EQUAL TOP OF 21AA.

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P1

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text P2

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text

ENGINEERS

AutoCAD SHX Text Civil Engineers Land Surveyors Land Planners

AutoCAD SHX Text 46777 Woodward Avenue Pontiac, MI 48342-5032 Tel. (248) 332-7931 Fax. (248) 332-8257

AutoCAD SHX Text

NF

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text

EXISTING BURIED CABLES

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

OVERHEAD LINES

AutoCAD SHX Text

EXISTING STORM SEWER

AutoCAD SHX Text

EX. R.Y. CATCH BASIN

AutoCAD SHX Text

EXISTING GAS MAIN

AutoCAD SHX Text

EXISTING SAN. CLEAN OUT

AutoCAD SHX Text

GUY POLE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

EXISTING SANITARY SEWER

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text S

AutoCAD SHX Text

EXISTING WATER MAIN

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

SCALE 1" = 40'

AutoCAD SHX Text 0'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text UTILITIES HAVE BEEN SHOWN BASED UPON PARTIAL SURVEY DATA AND HISTORICAL INFORMATION PROVIDED BY THE OWNER. NFE CANNOT GUARANTEE THE EXACT OF BELOW GRADE UTILITIES (STORM, SANITARY WATER MAIN OR ELECTRICAL LINES). THE CONTRACTOR SHALL EMPLOY, AS NEEDED, A UTILITY LOCATION SERVICE TO PROVIDE THE LOCATION OF ANY UTILITIES THEY FELL WILL CONFLICT WITH THE PROPOSED INSTALLATIONS.

AutoCAD SHX Text A TREE SURVEY WAS NOT COMPLETED FOR THIS PROJECT. THE CONTRACTOR SHALL REVIEW THE SITE, IN AREAS OF PROPOSED IMPROVEMENTS, TO DETERMINE THE AMOUNT OF CLEARING REQUIRED FOR INSTALLATIONS.

AutoCAD SHX Text ALL PAVEMENT CUTS OF EXISTING HMA AS A PART OF ELECTRICAL INFRASTRUCTURE INSTALLATION SHALL BE REPAIRED ACCORDING TO THE HMA REPAIR DETAIL, UNLESS OTHERWISE APPROVED BY THE ENGINEER..

AutoCAD SHX Text 6"

AutoCAD SHX Text 2"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text M.D.O.T. No. 5E1, 20AA

AutoCAD SHX Text

6" AGGREGATE BASE, 21AA

AutoCAD SHX Text M.D.O.T. No. 4E1, 20AA

AutoCAD SHX Text

BOND COAT - SS IH 0.10 GAL/SQ.YD.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text PROVIDED DIMENSIONS ARE SHOWN TO DELINEATE REQUIRED MINIMUM AREAS AND THE RELATIONSHIP TO THE ELECTRICAL CONNECTION. CONTRACTOR SHALL INSTALL PROPOSED CONCRETE AS OUTLINED ON EACH INDIVIDUAL CAMPSITE.

AutoCAD SHX Text

PROPOSED CONCRETE PAVEMENT

AutoCAD SHX Text

PROPOSED ASPHALT PAVEMENT

AutoCAD SHX Text TYPICAL WORK SHALL INCLUDE CLEARING/GRUBBING, GRADING AND EARTHWORK NECESSARY TO INSTALL THE PROPOSED CONCRETE CAMP PAD AND USE AREA; INSTALLATION OF THE 6" REINFORCED CONCRETE PAD / USE AREA AND RESTORATION.

AutoCAD SHX Text

PROOF-ROLLED SUB BASE

AutoCAD SHX Text

M.D.O.T. 21AA

AutoCAD SHX Text

WIDTH AS CALLED FOR ON PLANS

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"x6" #10/#10 WWF EPOXY COATED

AutoCAD SHX Text

WIRE MESH REINFORCEMENT

AutoCAD SHX Text

CRUSHED CONCRETE

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

KEY MAP N.T.S.

AutoCAD SHX Text

NF

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

PROPOSED 4" ASPHALT PAVEMENT

AutoCAD SHX Text

PROPOSED 2' BITUMINOUS BUTT JOINT

AutoCAD SHX Text 3'

AutoCAD SHX Text 8'

AutoCAD SHX Text

PROPOSED 6" GRAVEL PAD COORDINATED WITH LOCATION OF PEDESTAL

AutoCAD SHX Text

ELECTRIC PEDESTAL

AutoCAD SHX Text

EDGE OF ROAD

AutoCAD SHX Text

REMOVE PAVEMENT

AutoCAD SHX Text ALL TREES WITHIN 3' OF ALL PROPOSED AGGREGATE PLACEMENT FOR CAMPSITES AND ALL USABLE AREAS SHALL BE REMOVED AS PART OF THE BASE BID CONTRACT..

Sheets and Views
C2

File details come from the government source that posted it. Updated .