This document is Addendum No. 1 for a Request for Information (RFI) issued by the Florida Department of Environmental Protection (DEP) for the "Chief Tomokie Restoration at Tomoka State Park" project. The addendum provides responses to nine specific questions from potential vendors about the restoration project. Key details include that all restoration work is to be performed on-site, with secondary elements of the statue to be removed and stored off-site. The Department clarified that the Chief Tomokie figure should only be repaired, not replaced, and no modifications such as adding a water feature are desired.
The addendum indicates that historic photos of the structure exist and are available through Florida Memory for reference. The park is open to the public, and the statue can be viewed from ground level only. No additional equipment is permitted within the park for viewing the statue. The purpose of this RFI is to gather information about available products and services, and if DEP decides to proceed with a formal solicitation, an official site visit will be coordinated to allow all vendors to participate. The document provides a link to lower-quality historic images and emphasizes that this is an informational request only at this stage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 2026003 Chief Tomokie Restoration final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP Solicitation No. 2026003 Addendum No. 1 Page 1 of 2
ADDENDUM No. 1
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
DEP Procurement Section
3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida 32399-3000
October 20, 2025
Addendum To: DEP RFI No. 2026003, entitled “Chief Tomokie Restoration at Tomoka State Park”
The Department hereby answers questions posed by interested entities. This addendum does not need to be returned with the response. The Department hereby answers the following questions:
Question # Solicitation Section Solicitation Page # Question / Answer
1. - - Is the statue solid concrete?
Answer: See Section 2.02, Background.
2. - - Does the statue have running water plumbed up to the water cup and flowing anywhere on the overall structure?
Answer: No.
3. - - Does the DEP want to incorporate running water into the structure thru the addition of a “closed-loop” system? (if possible) Answer: No.
4. - - Are the secondary elements ( lower figures ) to be restored and placed back onto the structure, or will they be removed and stored only?
Answer: As indicated in Section 2.02, Background, the secondary elements are to be removed and stored off site only.
5. - - If the secondary elements are to be removed and moved into storage, will they need to be repaired/restored for possible future attachment back onto the structure?
Answer: At this time, DEP has not made a definitive decision as to whether the secondary elements will be reattached, but we do require that they be safely removed and transported to a storage facility for preservation and long term storage.
6. - - Is the statue to be removed from the structure and moved to a facility for repair/enhancement/restoration, or is all work to be performed “on-site”, on-structure?
Answer: No. All work is expected to be performed and completed on site. Only the secondary elements of the statute will be removed and stored off site.
DEP Solicitation No. 2026003 Addendum No. 1 Page 2 of 2
Question # Solicitation Section Solicitation Page # Question / Answer
7. - - Does DEP want the stone figure REPLACED by a fiberglass painted copy?
Answer: No. The Chief Tomokie figure should only be repaired, not replaced.
8. - - Do original photos of the structure exist for reference and replication efforts?
Answer: Yes. Historic photos of the structure exist. There are lower-quality images on Florida Memory.
http://www.floridamemory.com/items/show/74440
9. - - We are planning to travel to the area by the end of this week and I would greatly appreciate your guidance and collaboration to confirm whether the monument area is currently accessible or not, and if any prior authorization is required for on-site observation.
Answer: The Park is open to the public, and the structure may be viewed from ground level only. No additional equipment is permitted within the park for viewing the statue. The purpose of this RFI is to gather information regarding available products and services and is intended for informational purposes only. Should DEP decide to proceed with a formal solicitation, an official site visit will be coordinated with the Park to allow all vendors to participate.
http://www.floridamemory.com/items/show/74440
| ADDENDUM No. 1 |
| Addendum To: DEP RFI No. 2026003, entitled |
| “Chief Tomokie Restoration at Tomoka State Park” |
File details come from the government source that posted it. Updated .