Addendum No. 1

4 MB Posted

Attached to
Starr Park - Phase I - Project No. 02072023
Solicitation number
02072023
Issued by
Clayton County, Georgia

About this file

Addendum No. 1 to Starr Park - Phase I Project

This is an addendum to the sealed unit price bid solicitation issued by the City of Forest Park, Georgia for the Starr Park - Phase I project (Project No. 02072023). The addendum addresses 24 written questions submitted by prospective contractors prior to the February 28, 2023 question deadline and provides clarifications on project requirements, bid procedures, and technical specifications. Key clarifications include confirmation that irrigation design is to be performed on a design-build basis by the contractor and included in the base bid; retaining walls shall be segmental retaining walls per specification H3.00; electrical site lighting is included in new Line Item 97; all City of Forest Park permitting fees are waived; and the site is expected to be approximately balanced for earthwork within specified tolerances. The addendum also establishes that bidders must include a 10% contingency allowance within unit prices such that actual payment will be 90% of submitted values. A revised bid form is provided replacing the original Section III with updated line items, and a geotechnical investigation report dated May 6, 2022 prepared by Atlas Technical Consultants is incorporated as a contract document. The addendum requires all bidders to acknowledge receipt and comply with all modifications; failure to acknowledge may result in bid rejection. Sealed bids remain due by 2:00 p.m. on March 21, 2023 (revised from the original April 6, 2023 date noted in the opportunity), with substantially complete work required within 335 calendar days and final completion within 365 calendar days after contract execution.

The revised bid form includes 97 line items organized by work category, including demolition, site preparation, concrete and asphalt paving, rubberized and synthetic surfaces, fencing, drainage systems, utility piping, landscaping, six building components, and allowances for playground equipment and skate park. Bidders must be licensed Georgia General Contractors and provide bid security equal to 5% of the base bid, along with required forms including LSBD documentation, insurance certificates, financial capability statements, debarment certifications, and qualification statements addressing organizational structure, project experience, management plans, quality control, procurement, and safety records. The geotechnical report identifies shallow groundwater as near as three feet below surface, extensive previously placed fill and alluvial soils requiring undercutting and stabilization, and recommends a design bearing capacity of 1,500 psf for foundations. The report notes that on-site residual soils and previously placed fill are suitable for reuse as structural fill if dried to proper moisture content, though fill encountered in specific boring locations mixed with topsoil is unsuitable for reuse.

Text of this file

CITY OF FOREST PARK, GEORGIA

STARR PARK - PHASE I

PROJECT NO.: 02072023

ADDENDUM NO. 1

MARCH 16, 2023

ALL BIDDERS FOR THE REFERENCED PROJECT ARE REQUIRED TO MAKE THE CHANGES BELOW TO THE

EXISTING CONTRACT DOCUMENTS OBTAINED FROM THE CITY OF FOREST PARK’S WEBSITE FOR BIDDING

PURPOSES:

ITEM NO. 1: RESPONSE TO WRITTEN QUESTIONS RECEIVED PRIOR TO THE FEBRUARY 28, 2023 AT 12:00

PM NOON DEADLINE ESTABLISHED IN THE CONTRACT DOCUMENTS:

• QUESTION:

o What is the estimated cost or budget?

• RESPONSE:

o Project budgets and estimates are proprietary.

• QUESTION:

o Can I get a copy of any addendum released to date?

o All project and bid related documents are posted on the City’s website.

o Is irrigation required for this project? If so, where are the irrigation plans? Or is this a design-build irrigation proposal?

• RESPONSE:

o Per L1.00, irrigation is required for this project. Irrigation design shall be design/build by the contractor and included in base bid.

o When is the estimated installation date?

• RESPONSE:

o Construction is expected to begin within 30 days after the contacts have been completely executed.

o Is there a General Contractors license requirement?

o Yes, per the Contract Documents.

o Can you provide a CAD file?

o CAD files will be provided only to the successful bidder that is awarded the contract.

o Is this a classified or unclassified bid? There is no units for unsuitable.

• RESPONSE:

o This is an unclassified bid. However, bidding contractors may reference Geotechnical

Investigation report prepared by Atlas Technical Consultants, dated May 6, 2022.

o Can this site be balanced to avoid export/import of dirt?

• RESPONSE:

o Earthwork calculations and takeoffs are ultimately the responsibility of the contractor.

Costs for any necessary haul-in or haul-off shall be included in base bid. However, based on preliminary earthwork studies by design team, the site is expected to be approximately balanced, within specified tolerances.

o Explain how the allowances are handled. What is the allowance for playground equipment?

What is the allowance for skate park? Is the 10% contingency allowance supposed to be somewhere in base bid?

• RESPONSE:

o Contractor shall include allowances in bid, as specified on C0.0 and H1.00. Awarded contractor will then coordinate exact design, product, and installation with design team and owner. Contractor shall include the 10% contingency allowance into the unit price for each line item of the bid. Therefore, the actual price that will be paid for each line item is 90% of the value submitted.

o Explain how unit prices work. Is each unit price supposed to have everything priced into that item since there is no grading complete, erosion, or wall line items? Example: are we supposed to include all the grading, clearing, surveying, erosion, ect. for each line item?

The bid schedule is very confusing and the way it is right now there is now way we or subcontractors would ever break out numbers like this?

• RESPONSE:

o Unit pricing is broken into structures and defined project components. This is to simplify if items need to be removed from and/or added to the project. Site grading is a site wide issue but specific excavation that is required for various structures is associated with that specific line item.

o Clarify what the walls are? There is a detail of on pg, C7.1 for cast in place wall but elevation pages show segmental retaining walls. Also bid schedule shows a concrete wall but no segmented retaining walls.

• RESPONSE:

o Refer to H3.00. Walls shall be segmental retaining walls per H3.00 and specification.

Disregard detail on C7.1.

o In which Bid Line Item does the Electrical Site Lighting found on Sheets ES – 101; ES – 401; ES – 402 and ES -403 to be included?

o New Bid Form is provided under “Item No. 2” of this Addendum – See Line Item 97.

o What is the cost of the permits?

o All fees associated with City of Forest Park permitting are being waived by the City.

o Will the retaining wall require a permit? And if so at what cost?

o All fees associated with City of Forest Park permitting are being waived by the City.

o Will the Irrigation system to be designed by the Landscape Contractor? If so, then do you have a minimal Zone requirement.

o Refer to note on L1.00. Exact zone requirements will be coordinated with owner.

o Will Park Avenue be completely closed during construction; seeing we have work to complete on both sides of the street?

• RESPONSE:

o At this time there is no plan to close Park Avenue. After the award of this contact the successful bidder may provide a written request to the City for this closure. Requests for road closures will be complete with a traffic control and detour plan.

o Does the Limits of construction determine the linear footage of Construction Fencing required?

o Contractor’s responsibility to determine construction fencing quantities.

o Is there a certified land fill usage required by the city of Forest Park?

o No.

o Are any items listed for removal going to be removed by the city of Forest Park (reference sheets C2.0 & C2.1)?

• RESPONSE:

o At this time, contractor shall assume all work identified on C2.0 an C2.1 is to be performed by contractor.

o Can the limits of demolition be better defined as it relates to the existing pool and its components to remain?

• RESPONSE:

o Refer to C2.0 for description of intent regarding site work. Mechanical equipment located in existing ‘pump house’ (and all associated appurtenances) shall also be saved and protected.

o Was the existing pool in operation during the summer of 2022?

o Yes.

o Is there a detail at the edge of slab for the new splash pad?

o Splash pad slab shall be per SW2.0, with finished as specified on H1.01.

o What is the quantity of kids that the splash pad is designed for?

o Splash pad was not designed to a specific occupancy count.

o Sheet C3.0 references some Pool Drawings for Splash Pad details, could not locate.

o Refer to SW0.0-SW4.2 o What product and color are we using for the integral-colored concrete as shown on sheet

H1.01?

o Refer to updated H2.00.

o Who is providing the laser cut steel city logo as shown on sheet A-201? If the General Contractor is to provide, is there a source that the city wants to use?

• RESPONSE:

o The logo is to be provided by the GC. GC responsible for the all-other requirements for this item.

o What is the anticipated Notice to Proceed date?

• RESPONSE:

o Construction is expected to begin within 30 days after the contacts have been completely executed.

o What Bid Line Items do Specifications 27 0000, 28 0000 and other Low Voltage Systems as well support item bid under?

o New Bid Form is provided under “Item No. 2” of this Addendum – See Line Item 97.

ITEM NO. 2: BID FORM:

All Bidders are required to remove “SECTION III – BID FORM” from the Contract Documents and replace with

“SECTION III – REVISED: BID FORM” that is attached to this Addendum.

ITEM NO. 3: GEOTECHNICAL REPORT:

The geotechnical investigation for Starr Park dated May 6, 2022 is attached to this Addendum and is to be included into the Contract Documents for this project.

ITEM NO. 4: HARDSCAPE DETAILS:

All Bidders are required to remove “Sheet H2.00 – HARDSCAPE DETAILS” from the Contract Drawings and replace this sheet with Sheet “H2.00 – HARDSCAPE DETAILS” with revision date: 03/08/23 that is attached to this Addendum.

ITEM NO. 5: BIDDER FURNISHED INFORMATION:

All Bidders are requested to delete any reference to Georgia DOT Prequalification and/or Certification from the Contract Documents. Bidders are only required to provide a Georgia Contractor’s License number with the submission of the bid.

END OF ADDENDUM NO. 1

Where any original item, term or requirement is not specifically amended, voided or superseded by this addendum, it will remain in effect. This clarification is being provided to all known respondents.

This Addendum must be completed, signed, and attached to the RFP to acknowledge receipt of Addendum. FAILURE

TO ACKNOWLEDGE THIS ADDENDUM MAY RESULT IN REJECTION OF PROPOSAL.

Business Name ____________________________________________________________________________

Authorized Signature ____________________________________ Date _____________________________

Typed Name

& Title ___________________________________________________________________________

SECTION III

Page i

FOREST PARK

STARR PARK – PHASE I

REVISED: BID FORM

FOREST PARK

STARR PARK

PHASE - I

PROJECT NO.: 02072023

BID DATE: MARCH 21ST, 2023

BID TIME: 2:00 PM (EST)

Page ii

FOREST PARK

STARR PARK – PHASE I

TABLE OF CONTENTS

Page

Article 1 – Bid Recipient

Article 2 – Bidder’s Acknowledgements

Article 3 – Bidder’s Representations

Article 4 – Bidder’s Certification

Article 5 – BASIS OF BID

Article 6 – Time of Completion

Article 7 – Attachments to This Bid

Article 8 – Defined Terms

Article 9 – Bid Submittal

FOREST PARK

STARR PARK – PHASE I

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

City of Forest Park, Georgia

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the Owner in the form included in the Bidding Documents and to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:

Addendum No. Addendum Date

ADDENDUM NO. 1 MARCH 16, 2023

B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and

Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.

E. Based on the information and observations referred to in Paragraph 3.01.D above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and

FOREST PARK

STARR PARK – PHASE I

within the times required, and in accordance with the other terms and conditions of the Bidding

Documents.

F. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

G. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by

Engineer is acceptable to Bidder.

H. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “Corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

ARTICLE 5 – BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s). Any incomplete or illegible bid prices will make this bid subject to rejection by the Owner:

ITEM DESCRIPTION UNITS ESTIMATED UNIT TOTAL

NO. QUANTITY PRICE PRICE

BONDS, INSURANCE,

MOBILIZATION

LS 1 $____________ $_____________

TRAFFIC CONTROL

(COMPLETE PER

GDOT/MUTCD FOR PROJECT

DURATION)

LS 1 $____________ $_____________

DEMOLITION REMOVAL,

DISPOSAL AND STORAGE

(COMPLETE BUT NOT

LIMITED TO VEGETTION,

TREES, SAW CUTTING,

PAVEMENTS, CONCRETE,

STRUCTURES, SIGNAGE,

TRAFFIC SIGNALS AND ALL

RELATED APPURTENANCES)

LS 1 $____________ $_____________

GIS “AS-BUILT” SURVEY OF

COMPLETE PROJECT ON

“GEORGIA STATE PLANE

COORDINATES” FOR ALL

WORK PERFORMED

LS 1 $____________ $_____________

4” THICK 6’ WIDE CONCRETE

SIDEWALK COMPLETE;

CLASS “A” 3000 PSI AND ALL

REQUIRED APPURTENANCES

SF 48,000 $____________ $_____________

6” THICK CONCRETE PAVING

COMPLETE; CLASS “A” 4000

PSI; INCLUDING 6” GAB

COMPACTED BASE AND ALL

REQUIRED APPURTENANCES

SF 10,500 $____________ $_____________

ASPHALT PAVING; “HEAVY

DUTY”; COMPLETE FROM

SUBGRADE TO SURFACE

COURSE INCLUDING BUT

NOT LIMITED TO RECYCLED

APHALTIC CONCRETE 12.5

MM SUPERPAVE, TYPE 1, GP 1

OR 2, INCLUDING

BITUMINOUS MATERIL & “H”

LIME 2” MIN. THICKNESS;

TACK COAT; 2” RECYCLED

APHALTIC CONCRETE 19 MM

SUPERPAVE PRIME COAT 2”

MIN. THICKNESS, TYPE 1, GP

1 OR 2, INCLUDING

BITUMINOUS MATERIAL &

“H” LIME; 8” GAB, STANDARD

PROCTOR COMPACTED

SUBGRADE;

SY 500 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

ASPHALT PAVING; “LIGHT

DUTY”; COMPLETE FROM

SUBGRADE TO SURFACE

COURSE INCLUDING BUT

NOT LIMITED TO RECYCLED

APHALTIC CONCRETE 9.5 MM

SUPERPAVE, TYPE II

INCLUDING BITUMINOUS

MATERIL & “H” LIME, 1 ¼”

MIN. THICKNESS; TACK

COAT; 1 ¾” RECYCLED

APHALTIC CONCRETE 19 MM

SUPERPAVE PRIME COAT 2”

MIN. THICKNESS, TYPE 1, GP

1 OR 2, INCLUDING

BITUMINOUS MATERIAL &

“H” LIME; PRIME COAT, 6”

GAB, STANDARD PROCTOR

COMPACTED SUBGRADE;

SY 400 $____________ $_____________

RUBBERIZED TRACK

SURFACE; COMPLETE

INCLUDING BUT NOT

LIMITED TO POURED IN

PLACE RUBBERIZED TRAIL

SURFACE, STANDARD

PROCTOR GAB & STANDARD

PROCTOR COMPACTED

SUBGRADE AND ALL

REQUIRED APPURTENANCES

SF 13,500 $____________ $_____________

RUBBERIZED PLAYGROUND

SURFACE SYSTEM;

COMPLETE INCLUDING

POURED IN PLACE

RUBBERIZED SURFACE,

FALL-SAFE PADDING,

CONCRETE SLAB PER

MANUFACTURER SPECS.,

DRAINAGE & STANDARD

PROCTOR COMPACTED

SUBGRADE AND ALL

REQUIRED APPURTENANCES

SF 21,000 $____________ $_____________

PERMEABLE PAVER SYSTEM;

COMPLETE INCLUDING

PERMEABLE PAVERS,

BEDDING AND DRAINAGE;

AND ALL REQUIRED

APPURTENANCES

SF 9,000 $____________ $_____________

DOG PARK SURFACE

SYSTEM; COMPLETE

INCLUDING CLEAN

SHREDDED HARDWOOD

MULCH DYED BROWN,

SF 7,000 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

BEDDING AND DRAINAGE;

AND ALL REQUIRED

APPURTENANCES

ATHLETIC COURT SURFACE

SYSTEM; COMPLETE

INCLUDING SPECIFIED

SURFACES, EDGE

RESTRAINT, CONCRETE

PAVING AND STANDARD

PROCTOR COMPACTION;

AND ALL REQUIRED

APPURTENANCES

SF 11,500 $____________ $_____________

SAND VOLLEYBALL COURT

SYSTEM; COMPLETE

INCLUDING CLEAN BEACH

SAND, ANCHORED RUBBER

CURB, NON-WOVEN FILTER

FABRIC, DRAINAGE AND

COMPACTED SUBGRADE;

AND ALL REQUIRED

APPURTENANCES

SF 3,500 $____________ $_____________

RIVERROCK SWALE;

COMPLETE INCLUDING

SUBGRADE PREP, WRAPPED

57 STONE AND 8” MIN – 16”

MAX BROWN RIVER ROCK

SF 700 $____________ $_____________

SYNTHETIC TURF SYSTEM;

COMPLETE INCLUDING

STANDARD PROCTOR

COMPACTED SUBGRADE,

DRAINAGE, STONE BASE,

TOPPING STONE AND

SYNTHETIC TURF SYSTEM;

AND ALL REQUIRED

APPURTENANCES

SF 46,000 $____________ $_____________

3000 PSI CONCRETE CURB

AND GUTTER; COMPLETE

INCLUDING ROLLBACK

CURB, GDOT GAB ROAD

BASE; MIN. 8" THICK x 30"

WIDE UNDER CURB

INCLUDING STANDARD

PROVTOR COMPACTION AND

GRADING AND ALL

REQUIRED APPURTENANCES

LF 2,800 $____________ $_____________

3000 PSI CONCRETE HEADER

CURB (WITHOUT FENCING);

COMPLETE INCLUDING

EXPANSION MATERIAL

WHERE REQUIRED, REBAR

REINFORCEMENT AND

STANDARD PROCTOR

LF 4,300 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

COMPACTION AND ALL

REQUIRED APPURTENANCES

3000 PSI CONCRETE HEADER

CURB (WITH FENCING);

COMPLETE INCLUDING

EXPANSION MATERIAL

WHERE REQUIRED, REBAR

REINFORCEMENT, FENCING,

AND STANDARD PROCTOR

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 1,300 $____________ $_____________

CURB RAMP; GDOT ADA

RAMP “TYPE A” COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 3 $____________ $_____________

CURB RAMP; GDOT ADA

RAMP “TYPE B” COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 6 $____________ $_____________

CURB RAMP; GDOT ADA

RAMP “TYPE D” COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 2 $____________ $_____________

4’ TALL ORNAMENTAL

METAL FENCING; COMPLETE

INCLUDING 3000 PSI

CONCRETE FOOTINGS AND

ALL MANUFACTURER

REQUIRED APPURTENANCES

LF 1,200 $____________ $_____________

8’ TALL ORNAMENTAL

METAL FENCING; COMPLETE

INCLUDING 3000 PSI

CONCRETE FOOTINGS AND

ALL MANUFACTURER

REQUIRED APPURTENANCES

LF 500 $____________ $_____________

4’ TALL CHAIN LINK

FENCING; COMPLETE

INCLUDING 3000 PSI

CONCRETE FOOTINGS AND

ALL MANUFACTURER

REQUIRED APPURTENANCES

LF 800 $____________ $_____________

10’ TALL CHAIN LINK

FENCING; COMPLETE

INCLUDING 3000 PSI

CONCRETE FOOTINGS AND

ALL MANUFACTURER

REQUIRED APPURTENANCES

LF 600 $____________ $_____________

CMU SEAT WALL; COMPLETE

INCLUDING CAST STONE,

DRIP EDGE, 2000 PSI GROUT,

REBAR REINFORCEMENT,

COLOR MATCH MORTAR,

LF 140 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

3000 PSI CONCRETE FOOTING

AND STANDARD PROCTOR

SUBGRADE COMPACTION

AND ALL REQUIRED

APPURTENANCES

CONCRETE RETAINING

WALL; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

SF 4,900 $____________ $_____________

ADA RAMP; CONCRETE RAMP

WITH EDGE PROTECTION

INCLUDING ALL REQUIRED

APPURTENANCES

LF 40 $____________ $_____________

PEDESTRIAN WATER

FOUNTAIN; COMPLETE IN

ACCORDANCE WITH

MANUFACTURER SPECS

INLCUDING ALL REQUIRED

APPURTENANCES

EA 2 $____________ $_____________

DOG WATER FOUNTAIN;

COMPLETE IN ACCORDANCE

WITH MANUFACTURER

SPECS INCLUDING ALL

REQUIRED APPURTENANCES

EA 1 $____________ $_____________

PET WASTE STATION;

COMPLETE IN ACCORDANCE

WITH MANUFACTURER

SPECS INCLUDING ALL

REQUIRED APPURTENANCES

EA 2 $____________ $_____________

LITTER RECEPTACLE;

COMPLETE IN ACCORDANCE

WITH MANUFACTURER

SPECS INCLUDING ALL

REQUIRED APPURTENANCES

EA 17 $____________ $_____________

VOLLEYBALL COURT;

COMPLETE INCLUDING NET

SYSTEM, RUBBER CURB,

FULL DEPTH FABRIC WRAP,

CLEAN BEACH SAND,

ANCHORING, GAB LEVELING,

DRAINAGE AND STANDARD

PROCTOR COMPACTION AND

ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BASKETBALL COURT;

COMPLETE INSTALLED PER

MANUFACTURER SPECS

INCLUDING GOAL(S),

SURFACING, STRIPING, EDGE

RESTRAINT AND CONCRETE

PAVING AND ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

TENNIS COURT; COMPLETE

INSTALLED PER

MANUFACTURER SPECS

INCLUDING NET SYSTEM,

SURFACING, STRIPING, EDGE

RESTRAINT AND CONCRETE

PAVING AND ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

SHADE SAIL; INSTALLED

COMPLETE IN ACCORDANCE

WITH MAUFACTURER SPECS

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BENCH; INSALLED

COMPLETE IN ACCORDANCE

WITH MANUFACTURER

SPECS INCLUDING ALL

REQUIRED APPURTENANCES

EA 24 $____________ $_____________

RELOCATION OF FITNESS

EQUIPMENT

EA 10 $____________ $_____________

SPLASH PAD SYSTEM;

COMPLETE INCLUDING BUT

NOT LIMITED TO FEATURES,

PLUMBING, MECHANICAL,

GRADING, 6” THICK 3500 PSI

CONCREST SLAB, REBAR

REINFORCEMENT AND 3”

GRAVEL BASE AND ALL

REQUIRED APPURTENANCES

EA 1 $____________ $_____________

48" DIAMETER HDPE STORM

DRAIN; WATER TIGHT JOINT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 1,110 $____________ $_____________

48" DIAMETER RCP STORM

DRAIN; CLASS "V"; RUBBER

GASKET BELL & SPIGOT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 40 $____________ $_____________

36" DIAMETER HDPE STORM

DRAIN; WATER TIGHT JOINT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 40 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

36" DIAMETER RCP STORM

DRAIN; CLASS "V"; RUBBER

GASKET BELL & SPIGOT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 90 $____________ $_____________

30" DIAMETER HDPE STORM

DRAIN; WATER TIGHT JOINT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 480 $____________ $_____________

24" DIAMETER HDPE STORM

DRAIN; WATER TIGHT JOINT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 1,500 $____________ $_____________

18" DIAMETER HDPE STORM

DRAIN; WATER TIGHT JOINT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 1,370 $____________ $_____________

18" DIAMETER RCP STORM

DRAIN; CLASS "V"; RUBBER

GASKET BELL & SPIGOT;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

HAUNCHING, BACKFILL AND

COMPACTION AND ALL

REQUIRED APPURTENANCES

LF 120 $____________ $_____________

12” ROOF DRAIN PIPING

INCLUDING ALL REQUIRED

APPURTENANCES

LF 40 $____________ $_____________

10” ROOF DRAIN PIPING

INCLUDING ALL REQUIRED

APPURTENANCES

LF 560 $____________ $_____________

8” ROOF DRAIN PIPING

INCLUDING ALL REQUIRED

APPURTENANCES

LF 970 $____________ $_____________

6” ROOF DRAIN PIPING

INCLUDING ALL REQUIRED

APPURTENANCES

LF 490 $____________ $_____________

4” ROOF DRAIN PIPING

INCLUDING ALL REQUIRED

APPURTENANCES

LF 230 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

UNDERGROUND

STORMWATER DETENTION

SYSTEM “A”; COMPLETE

INCLUDING BUT NOT

LIMITED TO SUITABLE

FOUNDATION, BEDDING,

HAUNCHING, PIPING,

BACKFILL AND GRADING

AND ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

UNDERGROUND

STORMWATER DETENTION

SYSTEM “B”; COMPLETE BUT

NOT LIMITED TO SUITABLE

FOUNDATION, BEDDING,

HAUNCHING, PIPING,

BACKFILL AND GRADING

AND ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

SUBMERGED GRAVEL

WETLAND SYSTEM;

COMPLETE INCLUDING ALL

REQUIRED APPURTENANCES

EA 1 $____________ $_____________

BIO RETENTION AREA “#1”;

COMPLETE

EA 1 $____________ $_____________

TRENCH DRAIN; COMPLETE

INCLUDING GRATE & COVER,

4000 PSI CONCRETE SLAB &

BASE AND ALL REQUIRED

APPURTENANCES

LF 370 $____________ $_____________

GDOT 1019 PRECAST

CONCRETE CURB INLET

CATCH BASIN W/ CAST IRON

HOOD AND GRATE;

COMPLETE IN ACCORDANCE

WITH GDOT DETAIL 1019B

INCLUDING BUT NOT

LIMITED TO TRAFFIC RATED

FRAME AND GRATE,

BEDDING, SEALING PIPE

PENETRATION, AND

BACKFILL AND ALL

REQUIRED APPURTENANCES

EA 8 $____________ $_____________

GDOT 1019 PRECAST

CONCRETE DROP INLET

CATCH BASIN W/ CAST IRON

HOOD AND GRATE;

COMPLETE IN ACCORDANCE

WITH GDOT DETAIL 1019B

INCLUDING BUT NOT

LIMITED TO TRAFFIC RATED

FRAME AND GRATE,

EA 15 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

BEDDING, SEALING PIPE

PENETRATION, AND

BACKFILL AND ALL

REQUIRED APPURTENANCES

GDOT 1034 PRECAST DOUBLE

WING CATCH BASIN;

COMPLETE IN ACCORDANCE

WITH GDOT DETAIL 1034D

INCLUDING BUT NOT

LIMITED TO TRAFFIC RATED

FRAME AND COVER,

BEDDING, SEALING PIPE AND

ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

GDOT 1019 PRECAST

CONCRETE WIER INLET

CATCH BASIN W/ CAST IRON

HOOD AND GRATE;

COMPLETE IN ACCORDANCE

WITH GDOT DETAIL 1019A

INCLUDING BUT NOT

LIMITED TO BEDDING,

SEALING PIPE PENETRATION,

AND BACKFILL AND ALL

REQUIRED APPURTENANCES

EA 4 $____________ $_____________

CONCRETE JUNCTION BOX W/

CAST IRON TRAFFIC RATED

FRAME AND COVER;

COMPLETE IN ACCORDANCE

WITH GDOT DETAIL 9031U

INCLUDING BUT NOT

LIMITED TO TRAFFIC RATED

FRAME AND COVER,

BEDDING, SEALING PIPE

PENETRATION, AND

BACKFILL AND ALL

REQUIRED APPURTENANCES

EA 15 $____________ $_____________

AREA DRAIN PEDISTAL

INLET COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 32 $____________ $_____________

65 ROOF DRAIN CO EA 30 $____________ $_____________

6" DIAMETER DUCTILE IRON

PIPE FOR SANITARY SEWER;

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

COMPACTION AND TESTING

AND ALL REQUIRED

APPURTENANCES

LF 230 $____________ $_____________

8" DIAMETER DUCTILE IRON

PIPE FOR SANIARY SEWER;

LF 150 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

COMPLETE INCLUDING BUT

NOT LIMITED TO BEDDING,

COMPACTION, TESTING AND

ALL REQUIRED

APPURTENANCES

8” PVC DRAINAGE LINES;

COMPLETE INCLUDING

BEDDING AND BACKFILL

AND ALL REQUIRED

APPURTENANCES

LF 90 $____________ $_____________

69 SANITARY SEWER MANHOLE EA 3 $____________ $_____________

SANITARY SEWER

CLEANOUT

EA 4 $____________ $_____________

2.5” COPPER PIPE; COMPLETE

INCLUDING ALL REQUIRED

FITTINGS, BENDS AND

BLOCKING AND ALL

REQUIRED APPURTENANCES

LF 20 $____________ $_____________

2” COPPER PIPE; COMPLETE

INCLUDING ALL REQUIRED

FITTINGS, BENDS AND

BLOCKING AND ALL

REQUIRED APPURTENANCES

LF 440 $____________ $_____________

1.5” COPPER PIPE; COMPLETE

INCLUDING ALL REQUIRED

FITTINGS, BENDS AND

BLOCKING AND ALL

REQUIRED APPURTENANCES

LF 20 $____________ $_____________

1” COPPER PIPE; COMPLETE

INCLUDING ALL REQUIRED

FITTINGS, BENDS AND

BLOCKING AND ALL

REQUIRED APPURTENANCES

LF 100 $____________ $_____________

0.75” COPPER PIPE;

COMPLETE INCLUDING ALL

REQUIRED FITTINGS, BENDS

AND BLOCKING AND ALL

REQUIRED APPURTENANCES

LF 100 $____________ $_____________

NEW 2” WATER SERVICE

METER; COMPLETE

INCLUDING CONNECTION TO

EXISTING WATER MAIN

EA 1 $____________ $_____________

UPSIZE EXISTING 1.5” WATER

SERVICE METER

EA 1 $____________ $_____________

REUSE EXISTING 5/8” WATER

SERVICE METER

EA 1 $____________ $_____________

REUSE EXISTING 1” WATER

SERVICE METER

EA 1 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

80 EARTHWORK; COMPLETE CY 16,500 $____________ $_____________

4” CALIPER TREE (SPECIFIED

SPECIES VARY, SEE

SCHEDULE ON TP3.0)

EA 44 $____________ $_____________

3” CALIPER TREE (SPECIFIED

SPECIES VARY, SEE

SCHEDULE ON TP3.0)

EA 74 $____________ $_____________

4” POT GROUNDCOVER

(SPECIFIED SPECIES VARY,

SEE SCHEDULE ON L2.0)

EA 2,419 $____________ $_____________

1 GALLON

SHRUB/GOURNDCOVER

(SPECIFIED SPECIES VARY,

SEE SCHEDULE ON L2.0)

EA 706 $____________ $_____________

2 GALLON

SHRUB/GROUNDCOVER

(SPECIFIED SPECIES VARY,

SEE SCHEDULE ON L2.0)

EA 285 $____________ $_____________

3 GALLON

SHRUB/GROUNDCOVER

(SPECIFIED SPECIES VARY,

SEE SCHEDULE ON L2.0)

EA 3,134 $____________ $_____________

PERMANENT GRASSING;

SOD; COMPLETE

SF 236,000 $____________ $_____________

88 MULCHING SF 61,000 $____________ $_____________

BUILDING “A”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BUILDING “B”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BUILDING “C”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BUILDING “D”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BUILDING “E”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

BUILDING “F”; COMPLETE

INCLUDING ALL REQUIRED

APPURTENANCES

EA 1 $____________ $_____________

PLAYGROUND EQUIPMENT

ALLOWANCE

LS 1 $____________ $_____________

96 SKATE PARK ALLOWANCE LS 1 $____________ $_____________

FOREST PARK

STARR PARK – PHASE I

SITE ELECTRICAL

COMPLETE: INCLUDING BUT

NOT LIMITED TO ALL SITE

WIDE LIGHTING, POWER,

LOW VOLTAGE, ETC. THAT IS

NOT SPECIFICALLY

INCLUDED IN LINE ITEMS

FOR STRUCTURES AND

APPURTENANCES INCLUDED

IN THIS PROJECT

LS 1 $____________ $_____________

Total Base Bid in Words:

_____________________________________________________________________________Dollars

In Numbers: $_____________________________________

Unit Prices have been computed in accordance with Paragraph 11.03.B of the General Conditions.

Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.

Bidder acknowledges that total base bid includes a contingency allowance equal to 10% of the total sum of all line items within the above “Article 5: Basis of Bid” as provided in the Contract

Documents.

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete within 335 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General

Conditions within 365 calendar days after the date when the Contract Times commence to run.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHMENTS TO THIS BID

7.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid Security (5%);

B. LSBD Forms 1-4 ;

FOREST PARK

STARR PARK – PHASE I

C. List of 5 Project References (Section XVII – Reference and Release Form);

D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;

E. Copy of Contractor’s License [or] Evidence of Bidder’s ability to obtain a State

Contractor’s License and a covenant by Bidder to obtain the following said license within the time for acceptance of Bids.

1. Georgia General Contractor’s License Number

F. Certificate of Insurance (City of Forest Park as the Certificate Holder);

G. Contractor Affidavit and Agreement (Form 6a);

H. Subcontractor Affidavit (if available) (Form 6b);

I. Contractor’s Statement of Legal Status and Financial Capability (Form7);

J. Certification Regarding Debarment, Suspension, and Other Matters (Form 8);

K. Non-Collusion Affidavit (Form 9);

L. Bidder’s Contact Directory (Form 10);

M. Acknowledgment of Addenda (Form 11);

N. Required Bidder Qualification Statement with Supporting Data for the following:

1. Organizational Structure/Key Personnel and Resumes:

2. Overall Project Experience, Qualifications, and Performance on Previous Similar

Projects

3. Management and Staffing Plan

4. Quality Control Plan Approach

5. Procurement Plan

6. Safety Record and Experience

7.02 The following documents are to be submitted post-award:

A. LSBD Participation Report – Contract Goal: Report detailing percentage of LSBD participation (work performed) and payments to VOB/MBE/WBE/DBE subcontractors on a monthly basis.

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to

Bidders, the General Conditions, and the Supplementary Conditions.

FOREST PARK

STARR PARK – PHASE I

ARTICLE 9 – BID SUBMITTAL

9.01 This Bid is submitted by:

If Bidder is:

An Individual

Name (typed or printed):

By:

(Individual’s signature)

Doing business as:

A Partnership

Partnership Name:

(Signature of general partner -- attach evidence of authority to sign)

A Corporation

Corporation Name: (SEAL)

State of Incorporation:

Type (General Business, Professional, Service, Limited Liability): _______

(Signature -- attach evidence of authority to sign)

Title:

(CORPORATE SEAL)

Attest

Date of Qualification to do business in ______________ is ____/____/____.

A Joint Venture

Name of Joint Venture:

First Joint Venturer Name: (SEAL)

(Signature of first joint venture partner -- attach evidence of authority to sign)

Second Joint Venturer Name: (SEAL)

(Signature of second joint venture partner -- attach evidence of authority to sign)

(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)

Bidder's Business Address

Phone No. _____________________________________ Fax No.

E-mail ______________________________ _______

SUBMITTED on , 20____.

Georgia Contractor License No.: .

GEOTECHNICAL INVESTIGATION

Starr Park Phase 1 Forest Park, Georgia

Atlas Project No.: 122104

PREPARED FOR:

Falcon Design Consultants, LLC

235 Corporate Center Drive, Suite 200

Stockbridge, Georgia 30281

PREPARED BY:

Atlas Technical Consultants, LLC

3000 Northfield Place, Suite 1100

Roswell, Georgia 30076

May 6, 2022 ii

ATLAS Project No. 122104

May 6, 2022

Ms. Sarah Shirk

Falcon Design Consultants, LLC

235 Corporate Center Drive, Suite 200

Stockbridge, Georgia 30281

Subject: Report of Subsurface Exploration and

Geotechnical Engineering Evaluation

Starr Park Phase 1

5031 Park Avenue

Forest Park, Georgia

Dear Ms. Shirk:

Atlas Technical Consultants, LLC (Atlas) is pleased to provide this report of our subsurface exploration and geotechnical engineering evaluation for the referenced project. The field study and this report were accomplished in general accordance with Atlas Proposal No. 22-03300, dated March 7, 2022.

The following report will present a brief summary of our pertinent findings and recommendations followed by our understanding of the proposed construction, methods of exploration employed, site and subsurface conditions encountered, and conclusions and recommendations regarding the geotechnical aspects of the project. Should you have any question regarding items discussed in this report, please do not hesitate to contact the undersigned.

Sincerely, Atlas Technical Consultants, LLC

David Howell Frank Pike, P.E.

Staff Engineer Senior Registered Engineer iii

TABLE OF CONTENTS

SECTION PAGE NUMBER

1.0 SUMMARY

2.0 PROPOSED CONSTRUCTION

3.0 METHODS OF EXPLORATION

4.0 SITE DESCRIPTION, GEOLOGY AND SUBSURFACE CONDITIONS

4.1 Site Description

4.2 Geology

4.3 Subsurface Conditions

4.3.1 Pavement

4.3.2 Topsoil

4.3.3 Previously Placed Fill

4.3.4 Alluvium/Possible Alluvium

4.3.5 Residuum

4.3.6 Groundwater

4.3.7 Infiltration Test Results

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 General

5.2 Site Preparation

5.3 Earthwork

5.4 Groundwater Control

5.5 Foundations

5.5.1 Shallow Foundations

5.5.2 Alternate Foundations/ Structural Slabs

5.6 Soil Supported Slabs

5.7 Temporary and Permanent Slopes

5.8 Lateral Earth Pressures

5.9 Seismic Criteria for Structural Engineer

6.0 QUALIFICATIONS OF RECOMMENDATIONS

APPENDIX

Soil Test Boring Procedures

Correlation with Standard Penetration Test Results

Figure 1: Site and Boring Location Plan

Soil Classification Chart

Soil Boring Records (20)

1.0 SUMMARY

The following is a brief summary of our pertinent findings and recommendations. The reader is referred to the remaining text of this report for elaboration on these items.

1. The property appears developable from a geotechnical standpoint but extensive undercutting of previously placed fill materials and water deposited alluvium is anticipated. Temporary dewatering during undercutting and stabilization of undercut subgrades with geotextile fabrics and crushed stone are anticipated. Some stabilization of existing subgrades is also anticipated for hardscape and any synthetic turf areas.

2. General subsurface conditions consist of previously placed relatively poor fill underlain in some areas by very soft water deposited alluvium followed by residual soils. No rock or partially weathered rock was encountered to the depths drilled.

Shallow groundwater will impact development. The shallow groundwater was measured as near as 3 feet below the surface as measured at the time of boring. Due to this being an active park, it was not possible to leave the borings open to obtain stabilized groundwater readings. Unstable surface soils were observed in the northeast portion of the site under the weight of the drilling equipment which may indicate groundwater near the surface.

3. We recommend previously place fill and alluvium be undercut from below foundations and slab areas.

The new structures may be supported on residual soil or new structural fill designed based on a soil bearing capacity of 1,500 psf. We anticipate that hardscape and landscape subgrade preparation will be routine in some areas, but other areas will require remedial undercutting and stabilization.

4. The on-site residual soils and most of the encountered previously placed fill soils are visually suitable for reuse as structural fill from a material standpoint but are wet of their optimum moisture and will require drying. The fill encountered in borings B-6, B-9, and B-13 appeared to be mixed with topsoil, so this fill material is not suitable for reuse as structural fill. This conditions may be more widespread than indicated since the fill was placed for playfields.

5. Excavations to the depths explored can be accomplished using conventional heavy earthmoving equipment.

2.0 PROPOSED CONSTRUCTION

We understand that you are planning the improvement of Starr Park in Forest, Park Georgia. Our understanding of the proposed construction is based on the provided “Grading Plan C4.0” , undated, by Croft and Associates, as well as a memo by Martin/Martin Consulting Engineers dated February 24, 2022 regarding the anticipated loads in the proposed structures. The planned improvements will include pavilions, a new pool house, amphitheater, restrooms, hardscapes, and associated stormwater control measures. Proposed finish floor elevations for new structures will be near the existing grade and minimal grade adjustment is anticipated to reach finished floor levels. We understand that all structures are anticipated to be 1-story with no below grade areas. The maximum column loads have been given as 28 kips and wall loads are expected to be approximately 1 kip per foot. The amphitheater will be metal frame and the other structures concrete block walls. No other details of the proposed construction were available at the time this report was prepared.

3.0 METHODS OF EXPLORATION

To evaluate the subsurface conditions, the property was explored by a combination of a visual site reconnaissance and drilling 20 soil test borings to depths ranging from 10 to 20 feet below the existing grade.

The borings were located in the field by measuring distances and estimating directions from identifiable site features. Therefore, their locations as shown on the Site and Boring Location Plan in the Appendix should be considered approximate.

The borings were advanced by twisting continuous hollow stem auger flights into the ground. At selected intervals, Standard Penetration Resistance Testing (SPT) was performed in general accordance with ASTM

Standard D-1586, and soil samples were collected for visual classification. Upon completion, the soil test borings were plugged and backfilled. The results of the penetration tests, when properly evaluated, provide an indication of the relative consistency of the soil being sampled, the potential for difficult excavation, and the soil's ability to support loads. A more detailed description of the drilling and sampling process is included in the Appendix of this report.

Soil samples recovered during the drilling process were returned to the office where they were classified in general accordance with the Unified Soil Classification System (USCS). Detailed descriptions of the materials encountered at each boring location, along with a graphical representation of the Standard Penetration Test results, are shown on the Soil Boring Records in the Appendix. Elevations on the Soil Boring Records were interpolated from the topographical contours on the plan provided to us and should be considered approximate.

4.0 SITE DESCRIPTION, GEOLOGY AND SUBSURFACE CONDITIONS

4.1 Site Description

The subject property is an existing park that includes a small stage, tennis courts, playgrounds, a walking track, pavilions, restrooms and other single-story structures, and various ball fields. The site generally slopes down to the southwest with approximately 15 feet of elevation change. Unstable surface soils were observed in the northeast soccer fields, pumping of the subgrade was observed under the weight of the drilling equipment.

The investigated site is immediately surrounded by single-family residences to the northwest and southeast, while it is bound by existing multi-level developments to the northeast and existing baseball fields to the southwest.

A review of selected historical aerial photographs and historical USGS topographic maps indicates the park was initially developed between 1955 and 1960 with modification through the years since. The 1960 aerial photograph indicates a pond in the northwest corner of the site. A creek exits the pond and flows to the south.

At the pond the drainage swale bends to the east and the old drainage swale continued “upstream” through this section of the park and under Ash Street.

4.2 Geology

The site is located in the Piedmont Physiographic Province of Georgia. The residual soils in the Piedmont are the result of the chemical and physical weathering of the underlying parent rock. The weathering profile usually results in fine grained clayey silts and silty clays near the surface, where weathering is more advanced.

With depth, sandy silts and silty sands are found, often containing mica. Below the residual soils, partially weathered rock is often found as a transition above relatively unweathered rock. In local practice, partially weathered rock is arbitrarily defined as residual soils with Standard Penetration Resistances in excess of 100 blows per foot (50 blows per 6 inches), and which can be penetrated by a power auger.

4.3 Subsurface Conditions

4.3.1 Pavement

Boring B-19 initially encountered about 2 inches of asphalt, which was underlain by 3 inches of base stone.

4.3.2 Topsoil

Most of the borings with the exception of borings B-11, B-18, and B-19 initially encountered 1 to 8 inches of topsoil and associated root zone.

4.3.3 Previously Placed Fill

Fill soils are those soils that have been placed or reworked in conjunction with past construction activities, grading or farming. Previously placed fill soils were encountered in all boring locations to depths ranging from

2 to 12 feet below the existing grade. The fill was classified as silty SAND (SM) with Standard Penetration Test

(SPT) results ranging from 1 to 13 blows per foot (bpf). Based on the SPT results, the soil represented by these samples would be considered poorly to variably compacted. Some of the previously placed fill encountered in borings B-6, B-9, and B-13 appeared to be mixed with topsoil. The fills were often underlain by very soft soils. It is unlikely that a high degree of compaction could be obtained for fills placed on this type of subgrade.

4.3.4 Alluvium/Possible Alluvium

Alluvium is soil that has been transported and deposited by moving water. It is typically encountered adjacent to water course and in the bottom of valleys like previously crossed the park site. Alluvium soil type can change drastically over short horizontal and vertical distances and can contain organics. It is difficult to distinguish between alluvium and fill that was placed from an alluvial soil borrow source. Apparent alluvium was encountered in borings B-3, B-5, B-6, B-8, B-9, B-11, B-12, and B-13 with initial contact occurring at depths ranging from 3 to 12 feet below the existing grade. The alluvium/possible alluvium was found to be wet during drilling. Standard Penetration Tests varied from 1 to 10 blows per foot but most of the alluvium was very soft.

4.3.5 Residuum

Residuum is soil formed by in-place weathering of the parent rock. In wet environments the residuum is often difficult to distinguish from alluvium. Soils classified as apparent residuum was encountered at all boring locations beneath the previously placed fill or alluvium/possible alluvium, where encountered. The residuum was classified as sandy SILTs (ML), silty SANDs (SM), and clayey SANDs (SC), and were of low consistency.

Standard Penetration Test results ranged from 1 to 20 blows per foot.

No rock or partially weathered rock was encountered to the depths drilled.

4.3.6 Groundwater

Groundwater was encountered in borings B-1 through B-3, B-5, B-6, B-8 through B-10 through B-14, B-16, B-

17, and B-20 at the time of drilling at depths ranging from 3 to 13 feet below the existing grade. Stabilized groundwater levels will be somewhat higher.

Groundwater fluctuations of 5 feet or more are common in this geology.

4.3.7 Infiltration Test Results

Infiltration testing was completed using an automated constant-head permeameter which measures the soil’s infiltration rate or saturated hydraulic conductivity (Ksat) at specified time intervals. Test locations and depths were selected by others. The testing began by performing hand auger borings by manually rotating a sharpened steel bucket auger into the ground at test locations P-1 through P-7 to depths of 2 feet below the existing grade. The test locations are shown on Figure 1 in the appendix. The proposed infiltration test could not be performed at location P-1 due to the presence of water 3 inches above the test elevation.

Infiltration testing was completed using an automated constant-head permeameter, which measures the soil’s infiltration rate or saturated hydraulic conductivity (Ksat) at specified time intervals. The depth of water in the borehole does not change during the measurement period and the change in weight of the water reservoir over the time interval is recorded. As a result, the rate of water supplied corresponds to the soil infiltration rate from the bottom and side surfaces of the borehole. Once a steady water consumption rate is reached, the resulting percolation rate can be determined. The infiltration rate is then calculated using the Reynolds and

Elrick solution. The resulting infiltration rates for the referenced test locations are presented in the table below.

The following table provides a tabular summary of the infiltration rate recorded at each test location.

Summary of Infiltration Test Results

Location

Depth (ft)

Test Elevation (Feet)

Infiltration Rate (in/hr)

P-1 2 977 n/a

P-2 2 968 0.1

P-3 2 971 0.2

P-4 2 977 0.2

P-5 2 968 1+

P-6 2 975 0.2

P-7 2 975 0.1

At the time of construction, we request the opportunity to evaluate soil conditions to verify that the conditions anticipated in design actually exist. Otherwise, we assume no responsibility for construction compliance with the design concepts, specifications or recommendations. The infiltration rate may be different at other locations and depths and is dependent on soil properties at the specific location. If variations become evident during construction, it will be necessary to reevaluate the recommendations of this letter after on-site observations of the conditions.

The conditions described in the preceding paragraphs, and those shown in the Appendix, have been based on interpolation of the results of the previously described data using generally accepted principles and practices of geotechnical engineering. However, conditions in this geology may vary intermediate of the tested locations, and even more so on previously developed property.

Although individual soil test borings are representative of the subsurface conditions at the precise boring locations on the day drilled, they are not necessarily indicative of the subsurface conditions at other locations or other times. The nature and extent of variation between the borings may not become evident until the course of construction. If such variations are then noted, it will be necessary to reevaluate the recommendations of this report after on-site observation of the conditions.

5.0 CONCLUSIONS AND RECOMMENDATIONS

The following conclusions and recommendations are based on the data gathered during this exploration, our understanding of the proposed construction, our experience with similar site and subsurface conditions and generally accepted principles and practices of geotechnical engineering. Should the proposed construction change significantly from that described in this report, we request that we be advised so that we may amend these recommendations accordingly. This report and the conclusions and recommendations provided herein are provided exclusively for the use of Falcon Design Consultants, LLC and are intended solely for design of the referenced project.

5.1 General

The fill encountered in the soil test borings was generally loose and appeared to be mixed with topsoil in some areas such as in borings B-6, B-9, and B-13. No documentation of the previous grading process was available for review. It appears the fill may have been placed in some areas on soft subgrade and in most cases apparently placed for the construction of playfields. It is not likely that fills were placed with the intent of structural support. There is the possibility that undetected areas of unsuitable soils were left in place or were placed during the grading, that pits have been dug and unsuitable soils or organics have been buried, or other unanticipated conditions may exist. This is a risk inherent in development on an undocumented, previously graded property. We recommend that any soils to remain in place be thoroughly evaluated by the engineer as detailed in Section 5.2 and 5.3 of this report.

The majority of the borings performed included a zone of very soft alluvial soils and shallow groundwater that will impact development.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Award Information —
Addendum No. 3 —
Addendum No. 2 —
Sign-In Sheet 2.14.2023 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .