This is an addendum to a bid pack issued by Lakeview School District for pump installation services at Lakeview High School. The project involves labor-only pump replacement work, with sealed lump sum proposals due on Wednesday, February 21, 2018 at 2:00 PM at the Lakeview School District office located at 5 Arbor Street, Battle Creek, Michigan 49015, directed to Blake Prewitt. The project contact is Jim Steiner at Plante Moran CRESA, reachable at 248-514-4740. This addendum clarifies and revises several scope of work items originally outlined in Section 002416.
The addendum modifies five existing work items and adds one new item to the scope. Revised responsibilities include: contractors must pump down existing glycol, store it, and replace it after pump installation without supplying additional glycol (Item 5); removal and replacement of all existing pipe insulation to the metal deck with new Armorflex insulation (Item 9); disassembly, cleaning, and reassembly of heat exchanger plates, frame, and bolts with new gaskets furnished and installed by the contractor (Item 21); and inspection and repair of leaking pipe fittings in the pump room only (Item 22). A new Item 25 establishes a $5,000 allowance for repairing the existing glycol feed system, with any unused portion to be returned to the district via deductive change order. The bid due date remains unchanged at February 21, 2018.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lakeview School District Project Manual and Bid Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKEVIEW SCHOOL DISTRICT
BID PACK NO. 01 – PUMP INSTALLATION
ADDENDUM NO. 01
FEBRUARY 15, 2018
PROJECT: Lakeview School District
BID RELEASE NO: 1
DESCRIPTION: Lakeview High School Pump Replacement (labor only)
OWNER: Lakeview School District 5 Arbor Street Battle Creek, MI 49015
PROJECT CONTACT: Jim Steiner Plante Moran CRESA 26300 Northwestern Highway Southfield, MI 48076
CONTACT NUMBER: 248-514-4740
TO: Interested Bidders
BIDS DUE: Wednesday, February 21, 2018 at 2:00 PM Lump sum sealed proposals will be received at the office of:
Lakeview School District 5 Arbor Street Battle Creek, MI 49015 Attn: Blake Prewitt
ADDENDUM FOR: Pump Installation services at Lakeview High School
1. The Bid Due Date has remained unchanged and is still Wednesday, February 21, 2018 at
2:00 PM. Lump sum sealed proposals will be received at the office of:
Lakeview School District 5 Arbor Street Battle Creek, MI 49015 Attn: Blake Prewitt
2. Section 002416 – Scope of Work - the following items shall be revised.
a. Item 5 - Contractor is responsible to pump down the existing glycol, store and replace once the pumps have been replaced. Contractor is NOT responsible to supply additional glycol other than what is currently in the piping system.
b. Item 9 - Contractor shall remove all existing pipe insulation to the metal deck and replace with new Armorflex insulation.
LAKEVIEW SCHOOL DISTRICT
BID PACK NO. 01 – PUMP INSTALLATION
ADDENDUM NO. 01
FEBRUARY 15, 2018
c. Item 21 - At the heat exchanger, Contractor shall disassemble, clean and re-assemble plates, frame, bolts for this heat exchanger. Contractor shall be responsible to furnish and install new gaskets.
d. Item 22 - Contractor shall be responsible to check pipe fittings and repair fittings where any leaks are occurring. Contractor is responsible for checking / repairing fittings in pump room only.
e. The following item has been added - Item 25 - Contractor shall include an allowance of $5,000 to repair the existing glycol feed system. Any unused portion of this allowance shall be returned to Lakeview School District via a deductive change order.
(End of Addendum NO. 01)