This is Addendum No. 01 for Lakeview School District's Bid Pack No. 01 - Pump Installation project at Lakeview High School in Battle Creek, Michigan. The project involves pump replacement labor services, with sealed bids due on Wednesday, February 21, 2018 at 2:00 PM at the Lakeview School District office. The project contact is Jim Steiner from Plante Moran CRESA.
The addendum revises several scope of work items, including: contractor responsibility for pumping down, storing and replacing existing glycol (but not supplying additional glycol); replacing pipe insulation with new Armorflex insulation; disassembling, cleaning and reassembling heat exchanger components with new gaskets; checking and repairing pipe fittings in the pump room; and adding a $5,000 allowance for glycol feed system repairs, with unused portions to be returned to the district via deductive change order. The work is focused on labor only, with specific responsibilities outlined for handling existing systems and components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lakeview School District Project Manual and Bid Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKEVIEW SCHOOL DISTRICT
BID PACK NO. 01 – PUMP INSTALLATION
ADDENDUM NO. 01
FEBRUARY 15, 2018
PROJECT: Lakeview School District
BID RELEASE NO: 1
DESCRIPTION: Lakeview High School Pump Replacement (labor only)
OWNER: Lakeview School District 5 Arbor Street Battle Creek, MI 49015
PROJECT CONTACT: Jim Steiner Plante Moran CRESA 26300 Northwestern Highway Southfield, MI 48076
CONTACT NUMBER: 248-514-4740
TO: Interested Bidders
BIDS DUE: Wednesday, February 21, 2018 at 2:00 PM Lump sum sealed proposals will be received at the office of:
Lakeview School District 5 Arbor Street Battle Creek, MI 49015 Attn: Blake Prewitt
ADDENDUM FOR: Pump Installation services at Lakeview High School
1. The Bid Due Date has remained unchanged and is still Wednesday, February 21, 2018 at
2:00 PM. Lump sum sealed proposals will be received at the office of:
Lakeview School District 5 Arbor Street Battle Creek, MI 49015 Attn: Blake Prewitt
2. Section 002416 – Scope of Work - the following items shall be revised.
a. Item 5 - Contractor is responsible to pump down the existing glycol, store and replace once the pumps have been replaced. Contractor is NOT responsible to supply additional glycol other than what is currently in the piping system.
b. Item 9 - Contractor shall remove all existing pipe insulation to the metal deck and replace with new Armorflex insulation.
LAKEVIEW SCHOOL DISTRICT
BID PACK NO. 01 – PUMP INSTALLATION
ADDENDUM NO. 01
FEBRUARY 15, 2018
c. Item 21 - At the heat exchanger, Contractor shall disassemble, clean and re-assemble plates, frame, bolts for this heat exchanger. Contractor shall be responsible to furnish and install new gaskets.
d. Item 22 - Contractor shall be responsible to check pipe fittings and repair fittings where any leaks are occurring. Contractor is responsible for checking / repairing fittings in pump room only.
e. The following item has been added - Item 25 - Contractor shall include an allowance of $5,000 to repair the existing glycol feed system. Any unused portion of this allowance shall be returned to Lakeview School District via a deductive change order.
(End of Addendum NO. 01)