This is Addendum No. 5 to Invitation to Bid (RFB-235-25) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Upper Guide Wall Repairs Project at Kentucky River Locks 2 & 3 in Henry County, Kentucky, under the Kentucky River Authority. The addendum corrects the Description of Work for Item No. 3 on the List of Unit Prices and provides a revised unit price list that bidders must use in lieu of the previously issued version. The project encompasses 18 line items covering below water excavation, above water excavation, material disposal, metal sheet piling installation, percussion drilling, grout injection, water pressure testing, tie-back anchor installation, concrete work, geotextile fabric placement, aggregate placement, channel lining, and mooring pin installation.

Unit prices must include all labor, materials, supplies, services, overhead, and profit for both the contractor and any subcontractors, and shall be applied uniformly for any additions or deductions to the contract. Bidders are required to complete all unit price blanks for Items 1 through 18, with measurements in cubic yards, tons, linear feet, gallons, or each as applicable. Failure to completely fill out all requested unit prices may result in bid rejection. The revised List of Unit Prices serves as the binding document for establishing contract pricing and will be used to determine equitable adjustments for any changes or extra work performed under the resulting contract.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-235-25

FOR: Upper Guide Wall Repairs Project Kentucky River Locks 2 & 3 Kentucky River Authority Henry County, Kentucky

DATE: June 6, 2025

RFB-785-2500000645

ADDENDUM NO. Five (5)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to Official Bid Document, List of Unit Prices, page 12; the Description of Work listed for

Item No. 3 was incorrect. Use the attached REVSIED List of Unit Prices when bidding in lieu of previously issued.

END OF ADDENDUM

Invitation to Bid No. RFB-235-25 For: Upper Guide Wall Repairs Project Kentucky River Locks 2 & 3 Kentucky River Authority Henry County, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

REVISED RFB-235-25

OFFICIAL BID DOCUMENT

FOR

UPPER GUIDE WALL REPAIRS PROJECT

KENTUCKY RIVER LOCKS 2 & 3

KENTUCKY RIVER AUTHORITY

HENRY COUNTY, KENTUCKY

LIST OF UNIT PRICES: (ALL BLANKS MUST BE FILLED IN)

Unit prices shall include the furnishing of all labor, materials, suppliers, services and shall include all items of cost, overhead and profit for the Contractor and any Subcontractor involved, and shall be used uniformly without modification for either additions or deductions. The Unit Prices as established shall be used to determine the equitable adjustment of the Contract Price in connection with changes or extra work performed under the Contract. Failure to completely fill out all unit prices requested may result in bid rejection.

DESCRIPTION OF WORK

UNIT PRICE

UNIT OF

MEASURE

1.

Below Water Excavation (Includes all materials, labor, and equipment needed to excavate materials below water (elevation 440.4 ft. at Lock 2 and elevation

453.7 ft. at Lock 3).t $ Cubic Yard

2.

Above Water Excavation (Includes all materials, labor, and equipment needed to excavate materials above water (elevation 440.4 ft. at Lock 2 and elevation

453.7 ft. at Lock 3). $ Cubic Yard

3.

Dispose of excavated material in an accepted off-site disposal area or CONTRACTOR-permitted disposal area (Includes all materials, labor, and equipment needed to complete the work). $ Cubic Yard

4.

PZC-26 Metal Sheet Piling, including connections and accessories (Includes labor and equipment needed to install metal sheet piling, and all material, labor, and equipment needed to install walers, temporary bracing, templates, etc. ). $ Ton

5.

Percussion Drilling (Includes all materials, labor, and equipment needed to drill initial holes and/or re-drill after water-tightness grouting, as indicated in the drawings and specifications for the Tie-back Anchor installation into bedrock). $ Linear Foot

6.

High Mobility Grout Injection (Includes all materials, labor, and equipment needed to prepare a hole and place grout for water-tightness). $ Gallon

7.

Water Pressure Testing (Includes all materials, labor, and equipment needed to prepare a hole and pressure test per the Specifications for water-tightness). $ Each

REVISED RFB-235-25

CONTINUED LIST OF UNIT PRICES: (ALL BLANKS MUST BE FILLED IN)

DESCRIPTION OF WORK

UNIT PRICE

UNIT OF

MEASURE

8.

Two 270-KSI 7-wire strand Tie-back anchor Installation into bedrock (Includes all anchor materials, labor, and equipment needed to install a Tie-back Anchor per the Drawings and Specifications at Lock 2.

This includes hole setup, recess drilling, anchor bar system materials and installation (including anchor head assembly), grouting of bonded and unbonded lengths, cleanup, and any incidental items of the Work).. $ Linear Foot

9.

1 ¼” Dia. 150 KSI All Thread Bar Anchor (Includes all anchor materials, labor, and equipment needed to install a threaded anchor per the Drawings and Specifications at Lock 3. This includes the retaining wall and anchor wall connections) $ Linear Foot

10.

Unreinforced Concrete, Mix 1 (Includes all materials, labor, and equipment needed to prepare surfaces and place unreinforced Mix 1 concrete). $ Cubic Yard

11.

Reinforced Concrete, Mix 1 (Includes all materials, labor, and equipment needed to prepare surfaces and place reinforced Mix 1 concrete). $ Cubic Yard

12.

Geotextile Fabric (Includes all materials, labor, and equipment to place geotextile fabric). $ Square Yard

13.

Sand in place (Includes all materials, labor, and equipment to place and compact Sand). $ Cubic Yard

14.

No. 57 Coarse Aggregate in place (Includes all materials, labor, and equipment to place and compact No. 57 Coarse Aggregate). $ Cubic Yard

15.

No. 9 Coarse Aggregate in place (Includes all materials, labor, and equipment to place and compact No. 9 Coarse Aggregate). $ Cubic Yard

16.

Class III Channel Lining in place (Includes all material, labor, and equipment needed to place Class III Channel Lining). $ Cubic Yard

17.

Stainless Steel Mooring Pins (Includes all materials, labor, and equipment needed to install stainless steel mooring pins). $ Each

18.

Steel Mooring Pins painted with submersible paint (Includes all materials, labor, and equipment needed to install steel mooring pins) $ Each