This addendum document modifies the Request for Qualifications (RFQ) for DEP27-21 Summerlee AMD Treatment issued by the Department of Environmental Protection. The addendum addresses the AMD (Acid Mine Drainage) treatment project at Summerlee and provides clarifications and modifications to the original solicitation. The document indicates responses are due by a specified deadline, though the exact date should be verified in the original RFQ. The contract involves environmental remediation services related to acid mine drainage treatment, a critical water quality issue requiring specialized technical expertise.
The addendum serves to clarify requirements, modify previous terms, or provide additional information necessary for prospective bidders to prepare accurate and complete proposals. Specific pricing terms, funding sources, and contract award amounts are not detailed within this addendum excerpt alone. Any set-asides, incumbent contractor information, and detailed budget allocations would be contained in the original RFQ or supplementary documentation. Bidders should review both the addendum and the base RFQ in their entirety to ensure full compliance with all solicitation requirements and to understand the complete scope of environmental remediation services being procured.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
DEP2700000021
1. To publish vendor questions and answers and Pre-Bid Conference sign-in sheets
2. To publish clarifications, notes, and changes.
3. To publish revised plans.
Addendum #2
AML - Summerlee AMD Treatment
Permit (if applicable)
ARFQ DEP2700000021
The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on October 29, 2026, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
QUESTIONS AND ANSWERS
Attached
PRE-BID QUESTIONS AND ANSWERS
N/A
REVISED SPECIFICATIONS
1. Specification 9.3.1 Dewatering shall be replaced with the following:
Install approved pump-around or pipe-around systems as required. Dewater the pond carefully to avoid disturbing the embankment. Manage dewatering discharges per NPDES requirements using pump water filter bags, or equivalent. Ensure a dry working area prior to sludge removal.
REVISED DRAWINGS
CLARIFICATIONS, NOTES, AND CHANGES
1.
REVISED BID SCHEDULE ( Submitted separately)
1.
PRE-BID SIGN IN SHEETS
ATTACHMENT A
A025026 Text Box
N/A
A025026 Text Box
A025026
1. Specification 9.3.1 Dewatering shall be replaced with the following: Install approved pump-around or pipe-around systems as required. Dewater the pond carefully to avoid disturbing the embankment. Manage dewatering discharges per NPDES requirements using pump water filter bags, or equivalent. Ensure a dry working area prior to sludge removal.
Permit (if applicable)
*All Revised documents should be attached in the same order. If there is a revised Engineer estimate it needs to be attached separate, we do not provide these to the vendor. Just the amount.
ARFQ 0313 DEP2700000021
TECHNICAL QUESTIONS AND ANSWERS:
Q1: What is the engineers estimate for this project?
A1:
Q2: Do we have to burn vegetation or can vegetated material be wind rowed? Is there a designated area on site to burn the material?
A2: Contractor shall burn, chip, or remove vegetation, no windrowing. No area has been designated for burning. Contractor shall obtain any necessary permits for burning.
Q3: Where will the water come from we are to use to wash the existing stone?
A3: There are no known clean water sources available for this site. Contractor will have to provide clean water from their own source.
Q4: What are the as built dimensions of the current TIF ditch that will need to be widened to 20 ft in the bottom? I cannot estimate the additional excavation or additional stone for the new construction without current dimensions.
A4: Sheet 3 of the plans shows existing conditions/contours which represent as-built/surveyed conditions.
Q5: Is it the intent to pipe the water from the TIF ditch and existing AFVFPs rehabilitation / construction areas as well as the new AFVFP construction area directly to the settling pond during the rehabilitation / construction period of the TIF ditch, existing AFVFP, and new AFVFP construction pond? Then, once complete, clean the settling pond last?
A5: Yes.
Q6: Has the Raleigh County Landfill given approval based off the quality of the material they will be receiving to bring the material to them? Have they been alerted the material will have the addition of quicklime to dry and make it suitable for transport?
When I contacted the Raleigh County Landfill and was told they need an analysis which has been completed within the last 3 months and that the material must pass a paint filter test upon arrival to them. Also, once this is done the RCL will send the information to the WVDEP for approval. I have attached the forms they requested in this email. Will the WVDEP take an additional sample for the 3 month time frame and
The Engineer’s Estimate is $1,109,999.00.
have analysis ran on it to confirm the landfill will accept the material? Does the WVDEP have written confirmation the Raleigh County Landfill will accept the material?
A6: The Raleigh County landfill has been contacted about the project; however, no permit has been obtained nor sludge sampling information has been provided to the landfill.
Contractor is responsible for all aspects of the disposal including permitting and any additional sampling necessary.
Q7: Instead of removing, washing, and replacing the stone can the contractor just replace the stone?
A7: The project shall be bid as if the contractor were removing, washing, and replacing the stone. The successful bidder may present the option to remove and replace all stone to WVDEP during construction.
Q8: For clarification, is the Contractor to replace the two existing AFVFP Control Systems?
8.2.2 states CONTRACTOR shall replace all components of the control systems with parts from the original equipment manufacturer, or equal, as determined by the WVDEP.
The bid schedule does not reflect this?
A8: Replacement of the existing AFVFP control systems is considered incidental to item 8.1 lump sum bid for existing AFVFPs rehabilitation. It is not clear what all components will need to be replaced on the existing systems or if only maintenance is needed; therefore, this work was not included with the new AFVFP control system.
Q9: Should it be assumed we are to replace the existing under drains with new pipes and new
AFVFP Control Systems? Are there as built plans we can be given showing the dimensions of the ponds and depth and location for the underdrain pipes? Also, is there a calculation for the amount of sludge to be removed from these ponds or are we to assume the sludge is not to be removed from these ponds.
A9: The condition of the underdrain piping is unknown. Piping may become damaged during the rock removal and replacement process. Camera and flushing activities are required in the event the piping is not replaced. Phase 2 plans are provided with this addendum;
however, sheet 3 of the plans shows existing conditions including the existing pipes and existing pond contours. Refer to specification 9.3.2 and Appendix B for information regarding sludge volume. Sludge shall be removed from the settling pond.
Q10: Where are the +8 inch logs to be placed. Need to know to determine time for clearing and grubbing.
A10: All vegetation shall be burned, chipped, or otherwise removed from the site. Contractor shall be responsible for any permitting.
Q11: There is no cut / fill for the new AFVFP or new TIF structures associated with it and no contours for the area. We need this to be provided to construct the area.
A11: Item 10.1 Unclassified Excavation accounts for the AFVFP, seep area and TIF structures.
The site is estimated to be balanced between cut and fill. Contours are shown on Sheet 5 Reclamation Plan.
Q12: The weir located along the access road, along the back side of the property that has no pipe going through the road from the seep. Do you need to add pipe to the seep so that it does not continually saturate the access road?
A12: A low swale in the road will be sufficient.
Q13: Regarding 8.2.8 and 9.2.6 “Pipe Inspection Camera”, what is meant by the qualifications of an employee or company to inspect the piping? Does this mean if we have a camera and know how to use it we can do it or is there a specific certification needed?
A13: No certification is necessary for this work.
Q14: It appears from the drawing the acreage to be revegetated is underestimated. Is the 1 acre on the bid schedule correct?
A14: Most of the area to be disturbed will be covered with stone and will not require revegetation. The fabriform ditch and embankments are not included in revegetation as soil disturbance isn’t intended, only removal of trees and shrubs.
Q15: Do you have cross sections of the existing ground in the AFVFP or the TIF structure areas? How were volumes calculated?
A15: Plan sheets from Phase 2 of the site, which included construction of the existing AFVFPs, are included with this addendum. Existing contours are shown on the plans. Volume calculations were completed in AutoCAD.
Q16: What is the liner material in the three settling ponds, clay or PVC/rubber? I do not see evidence of a PVC/rubber liner in any of the ponds.
A16: The presence, type/material, and condition of any liners within the ponds is unknown.
Q17: Can you verify the 450 tons of compacted 1-1/2 crusher run for the access road construction?
A17: Quantity of the stone needed for the access road is an estimate and contractor will be paid per ton installed per weight tickets.
Q18: Do we have to wash the stone as described in the bid documents or can we use alternative methods?
A18: Bidder shall assume they are to remove, wash, and replace stone for bidding purposes.
Successful bidder may present alternative methods to WVDEP for review and approval.
Q19: Have you tried cleaning the stone? What happens if the stone cannot be cleaned to your satisfaction?
A19: Stone washing is a standard procedure and has been completed on other projects in the past. If the stone cannot be washed or is considered inadequate for reuse, it shall be disposed of and replaced with new stone.
Q20: May the excavated materials be placed onto privately owned property? I.E. Iron sludge, muck, dirt etc. (no trash/waste)
A20: Refer to the specifications Section C and Section D of the Special Provisions.
Q21: The mobilization spec refers to setting up an office. Is an office required for this project?
A21: No office is required for this project.
Q22: Is the excavation for the TIF Ditch widening to be paid under unclassified excavation or
Terraced Iron Formation Ditch Rehabilitation and Construction?
A22: Excavation for the TIF ditch and widening is to be paid for under Item 7.1 Terraced Iron
Formation Ditch Rehab/Construction.
Q23: Is there any topsoil to be stripped on this project?
A23: No topsoil is planned to be stripped, though some may exist with the access road construction. Most exposed soils will be covered with rock.
Q24: Is the stone used to construct the wash pad to be paid as No. 1 High Calcium Limestone?
A24: The wash pad materials and construction are considered incidental to the work in which it is required.
Q25: Is the No. 1 High Calcium Limestone item just new stone bought for the project or does it include the stone that is to be washed and reused?
A25: Bid Item 7.2 only includes new stone estimated to be purchased for the project.
Q26: The specs state that the existing AFVFP control systems are to be replaced with new ones. Can the quantities for items AFVFP Control System and Anti-Seep Collar be adjusted to reflect installing a new control system for the new AFVFP and replacing the existing control systems for the existing AFVFPs?
A26: The existing AFVFPs shall be replaced with new equipment/components and may not necessarily need to be fully replaced. The anti-seep collars are not to be replaced. Bid items will remain as shown.
Q27: Is the access road to be removed and if so, what item would the removal be paid under?
A27: The access road is to be improved and extended. All work related to the access road is to be included in Item 4.2 Access Road Construction.
Q28: Does the settling pond where the sludge is to be removed from have an existing underdrain system that will need to be cleaned?
A28: The settling pond itself does not have an internal underdrain system. However, the existing dam was rehabilitated to include a wider embankment with drainage blanket. A perforated PVC pipe was installed at the downslope end of the drainage blanket (toe of embankment) to discharge water. This pipe needs to be inspected via camera and flushed, as needed.
Q29: Is there an existing stone layer in the settling pond that will need to be removed, cleaned and put back? If there is not an existing stone layer, does one need to be put in using the No.1 High Calcium Limestone?
A29: To the best of our knowledge, the existing settling pond does not have a stone layer and no stone layer is intended to be returned.
Q30: Due to the uncertainty of the quantity of sludge to be removed, could the Settling Pond
Rehabilitation item be changed to a unit price bid instead of a lump sum bid?
A30: No.
Q31: According to the specs, the dewatered sludge is to be taken to an approved disposal facility. What are the qualifications to make a site an approved disposal facility?
A31: The material must be disposed of at a site legally permitted to accept the waste material.
Q32: Is the wash pad to be removed and if so, what item would the removal be paid under?
A32: Yes, this work shall be included in bid items 7.1 and 8.1.
Q33: Is there an adequate source of clean water onsite for the stone washing?
A33: There are no known clean water sources available on site.
Q34: How will the sediment and iron precipitate from the stone washing be disposed of?
A34: The sediment and iron precipitate from stone washing is intended to drain into the settling pond and shall be removed with the sludge as part of bid item 9.1 Settling Pond Rehabilitation.
Q35: Can an area onsite be designated to make sludge cells so that the sludge can be disposed of onsite?
A35: Sludge cells are not allowed.
Q36: Can a bid item for hydrated lime be added for treating the sludge?
A36: No.
Q37: Which items is item 7.2 No. 1 High Calcium Limestone to be used for?
A37: Bid item 7.2 includes estimated stone quantities for all new stone purchased for 7.1 TIF ditch rehab, 8.1 existing AFVFP rehab, and new AFVFP construction.
Q38: How will the contractor determine the quantity of new stone that will be needed for the rehabilitation the AFVFP’s and TIF ditch? Does that get paid for in item 7.2 or is it incidental to the AFVFP’s and TIF ditch?
A38: All new No. 1 high calcium limestone stone purchased for the TIF ditch rehab, AFVFPs rehab, and new AFVFP construction shall be paid for under bid item 7.2 measured by weight tickets. We have estimated that approximately 50% of the existing stone will need to be replaced.
Q39: Do any of the existing ponds or ditches have liners in them?
A39: The extension of the TIF ditch is designed to match the existing TIF ditch design which includes geotextile fabric liner between the stone and subgrade, as shown in the details.
Whether the existing ponds have liners, the type, and the condition is unknown.
Q40: Is pumping through a filter bag all that is required to discharge from the site or will additional measures such as soda ash briquettes be required for ph and iron?
A40: Yes, the contractor shall meet the requirements of the NPDES permit, which requires controlling the sediment from discharged water. No additional measures such as soda ash briquettes are required.
Q41: Can the bid date be extended to provide time to consider the information provided in
Addendum 1?
A41: Please see Addendum #1.
DEP27*21
CF
S
8"
2710/Ph 2 - SHEET1
Design PlanSHEET 1 of 2
Plan View, Location Map, Legend & Notes
PROJECT SITE
CO RTE 18/1
US-19
40 20 0 40 80
Scale: 1" = 40' July 2016 BioMost, Inc., Mining and Reclamation Services
Mars, PA www.biomost.com
Wolf Creek Watershed Fayette County, WV
SUMMERLEE PASSIVE TREATMENT SYSTEM
(PHASE 2)
PLATEAU ACTION NETWORK
for
LOCATION MAP 1" = 2000'
Source: USGS 7.5' BECKWITH, WV (2011)
EROSION & SEDIMENTATION CONTROL PLAN NOTES:
1. Only limited disturbance will be permitted to provide access to install perimeter erosion controls (compost filter sock or approved equivalent silt barrier fence) & upgradient diversion ditch.
2. Erosion and sediment control Best Management Practices (BMPs) must be constructed, stabilized, and functional before site disturbance begins within the BMP contributory drainage area.
3. After final site stabilization has been achieved (uniform 70% perennial vegetative cover or better where revegetated), temporary erosion and sediment control BMPs must be removed. Areas disturbed during removal of BMPs must be stabilized immediately.
4. Stockpile heights must not exceed 35 feet. Stockpile slopes must be 2:1 or flatter.
5. Until the site is stabilized, all erosion and sediment control BMPs must be maintained properly. Maintenance must include inspection of all erosion and sediment control BMPs after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching and renetting must be performed within 48 hours or sooner if so specified for a given BMP. If erosion and sediment control BMPs fail to perform as expected, replacement BMPs or modifications of those installed will be required. The site Construction Foreman or his designee must insure that weekly and post-runoff inspections are completed and shall oversee any required preventative and remedial maintenance work.
6. Sediment removed from BMPs must be placed within the limits of disturbance in an area protected by BMPs and promptly stabilized to avoid future re-entrainment.
7. Any waste materials generated by (including wastes associated with the operation and maintenance of earthmoving equipment and construction materials such as geotextile, pipe, revegetation supplies, etc.) or encountered during construction will be recycled, scrapped, or disposed in permitted facilities in accordance with all applicable state and federal regulations as needed.
8. Area affected during construction shall be only within the limits of disturbance as shown and shall be kept to the minimum area needed to construct the treatment system.
9. Though all cut and fill material will be used and/placed onsite, it is the responsibility of the operator to perform due diligence to determine if any fill material imported from offsite is Satisfactory Fill. Satisfactory Fill is defined as: uncontaminated, non-water soluble, non-decomposable, inert, solid material. The term includes soil, rock, stone, and dredged material.
The general approach to construction and E&S BMP installation intends that: BMPs are to be installed prior to earth disturbance activities, each step should be completed before beginning the next, and the site is to be stabilized as soon as possible upon completion of the work. If the work is divided into smaller subareas, the BMPs are to be installed prior to beginning work in that area. This includes installing controls for all areas downgradient of the disturbance activity. If the earth disturbance activities must be suspended for a period of more than 20 days, the disturbed areas are to be stabilized in accordance with the temporary seeding specifications or other suitable means to prevent erosion.
1. Install compost filter sock / wattles, (or approved equivalent) where indicated.
2. Construct rock-lined diversion ditch leading to existing Fabriform channel.
3. Clear & Grubb only the area that is to be disturbed. Place trees in windrow / brush piles along outside edge of limits of disturbance or site access as needed. Excess woody debris may be burned in accordance with local regulations.
4. Install treatment components.
5. Grade all affected areas (including excess fill placement area) to blend with surrounding topography to promote positive drainage.
6. Place and spread best on-site soil material, as needed, to insure successful revegetation.
7. Seed entire affected area as per permanent seeding specifications as soon as possible or within 1 week after construction.
8. Remove all temporary BMPs upon establishing permanent, uniform, 70% perennial vegetative cover .
CONSTRUCTION SCHEDULE & BMP INSTALLATION SEQUENCE
TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS
Temporary Species: Annual Ryegrass Pure Live Seed: 88% Application Rate: 48 LB./AC.
Fertilizer Type: None Liming Rate: 0 T./AC.
Mulch Type: Hay or Straw Mulching Rate: 3.0 T./AC.
Permanent (Species - Application Rate): Orchard Grass - 10 LB./AC.; Timothy - 10 LB./AC.;
White Dutch Clover - 3 LB./AC.; Alsike Clover - 3 LB./AC.; Ladino Clover 3 LB./AC.;
Birdsfoot Trefoil (Empire Variety) - 13 LB./AC.; Winter Wheat - 60 LB./AC. (Winter wheat for fall planting or spring oats at 34 LB./AC. for spring planting. Winter rye or annual rye grass at 25 LB./AC. may also be used.) Kentucky 31 Tall Fescue shall not be used.
Min. Purity: 90% Min. Germination: 80% Fertilizer Type: 10-20-20 Fertilizer Appl. Rate: 500 LB./AC.
Liming Rate: 3.0 T./AC. Mulch Type: Hay or Straw Mulching Rate: 3.0 T./AC.
Preferred Seeding Season Dates: 3/15 to 6/1; 8/1 to 10/15
GENERAL NOTES:
1. Base map provided by Plateau Action Network (from previous reclamation performed by the State of WV and/or US OSM). WV State Plane - South (US Survey Foot) NAD83 (Vertical datum - NAVD88). Select topographic and cultural features from USGS 7.5' Beckwith, WV (2011). Additional information from limited 2015 - 2016 site investigations by BioMost. All existing conditions are to be field verified by the contractor as needed.
2. Stream presence/extent determined from "blue lines" as depicted on USGS map - locations revised based on available mapping provided by Plateau Action Network.
3. All dimensions are in feet unless otherwise noted. All slope designations are H:V.
4. Property owner and line location are approximate/representative. This is not a property survey.
5. Proposed structures may be altered as approved by the PAN representative as needed to suit field conditions.
6. WV One Call notification will be required for entire Phase 2 construction area. All underground utility locations (i.e., gas lines & water lines) are to be confirmed by the Contractor prior to excavation.
7. All "High-Cal Limestone" to be 80% CaCO3 or better (Not just 80% CCE) and WV DOH approved.
8. All Riprap shall be WV DOH approved.
9. Soil unit boundaries and data from websoilsurvey.nrcs.usda.gov accessed May 2016.
10. AFVFP(s) to be clay-lined to prevent leakage, on an as-needed basis. Contractor to provide clay from on-site source. Synthetic / alternative pond liners may be used if approved prior to construction ( i.e., EDPM, HDPE, Bentonite).
11. Existing AMD Infiltrators / Fabriform channel drop inlets are to be temporarily plugged during construction.
12. Improvement of existing access road for construction is at the discretion of the Contractor and may require more or less than the number of loads of aggregate estimated. Final condition must allow reasonable access by four-wheel drive pickup.
13. See leaders on plan view for additional elevation information regarding channel and pipe inverts.
14. Passive treatment component lines labeled with elevations where coincident with proposed contours.
15. All AASHTO #1 / R-4 Riprap shall be placed on WV DOT / DOH-approved erosion control separation geotextile
16. Base mapping provided by PAN does not represent current field conditions in areas of prior acid mine drainage treatment activities. Mapping contours shown are pre-AMD treatment conditions.
SOIL DATA TABLE
MAP UNIT
SYMBOL MAP UNIT NAME
Slope
DEPTH
(IN.)
CmD Clifftop-Marrowbone Complex 15 - 25 2 - 40
ItF Itmann Very Channery Sandy Loam, Very Steep 35 - 70 80 +
PhA Philo-Pope Complex 0 - 3 80 +
PIPE INFORMATION TABLE
PIPE SIZE
(INCHES) TYPE LOCATION
HDPE
DUAL-WALLED
(TYPE S)
FABRIFORM SEDIMENT TROUGH / TIF
EFFLUENT STRUCTURES / FABRIFORM
SEDIMENT POOL
8 SDR35 PVC
SOLID AFVFP #1 & 2 / OUTLET
8 SDR35 PVC
PERF. AFVFP CUSTOM-PERFORATED UNDERDRAIN LEGEND
EX. CONTOUR (INDEX)
EX. CONTOUR (INTERMEDIATE)
EX. ROAD (IMPROVED)
EX. ROAD (UNIMPROVED)
EX. PROPERTY LINE (APPX.)
EX. TREELINE
EX. BUILDING / STRUCTURE
EX. ROAD RIGHT-OF-WAY (APPX.)
EX. SURFACE WATER
EX. OVERHEAD UTILITY (OH)
EX. UTILITY POLE
EX. UNDERGROUND UTILITY (UG)
EX. GASLINE (APPX.)
EX. GASLINE MARKER
PROP. CONTOUR (INDEX)
PROP. CONTOUR (INTERMEDIATE)
PROP. TREATMENT COMPONENT
PROP. LIMITS OF DISTURBANCE (2.9 AC)
PROP. 8" PVC PIPE
PROP. 12" HDPE N-12 PIPE
PROP. WINDOWED BAFFLE CURTAIN
PROP. E&S CONTROLS (WATTLES)
EX. ELECTRIC FENCE
EX. SOIL UNIT BOUNDARY
PROP. ROCK CONSTRUCTION ENTRANCE
CONSTRUCTION BENCHMARK
PROP. FILL PLACEMENT AREA
WATER MONITORING LOCATION
PROP. ROCK-LINED CHANNEL
PROP. EMERGENCY SPILLWAY
REPRESENTATIVE AMD CHARACTERISTICS
Point Date Flow pH Acid T Fe T Mn T Al Sulfates
SUM-60
AVG. 139 3.0 605 179 16 23 1,742
DESIGN 139 3.0 605 *179 *13 *23 2,000
Flow in gpm; concentrations in mg/L Average: PAN and BioMost monitoring 2009 - 2015. (n=14, exception for iron analyses n=16) Design: Maximum flow rate; average concentrations of acidity and dissolved metals [iron (Fe), manganese (Mn), aluminum (Al)]; maximum sulfate concentration; maximum iron loading *Dissolved metal value
BENCHMARK INFORMATION TABLE
BENCHMARK ID NORTHING EASTING ELEVATION
PAN#1 365889.698 1923084.343 1975.86
PAN#2 365756.786 1922754.227 1957.32
BMI-1 365953.348 1922664.139 1974.12
BMI-2 365503.886 1923027.562 1943.20
EM. SPILLWAY CREST
ELEV. 1958.0
(GRASS-LINED)
EM. SPILLWAY CREST
ELEV. 1958.0
(GRASS-LINED)
AFVFP R-4 OUTLET
PROTECTION TO POND
SEDIMENT TROUGH
PIPE INVERT = 1956.0
PIPE INVERT = 1951.0
PIPE INVERT = 1951.5
PIPE INVERT = 1951.5
TIF #2 BEGINNING
INVERT 1968.0
(TOP OF STONE)
TIF #2 END INVERT 1956.0
(TOP OF STONE)
TIF #1 END INVERT 1957.0
(TOP OF STONE)
TIF #1 BEGINNING
INVERT 1964.0
(TOP OF STONE)
DD #1 BEGINNING
INVERT 1978.0
(GRASS-LINED)
DD #1 END INVERT 1975.0
(GRASS-LINED)
FABRIFORM
SEDIMENT POOL
INVERT 1938.5
INVERT 1938.5
TIF #2 EFFLUENT
STRUCTURE
(SEE DETAIL)
TIF #1 EFFLUENT
STRUCTURE
(SEE DETAIL)
TEST PIT LOCATION
FUTURE PHASE 3A & 3B
CONSTRUCTION AREAS
6.3% SLOPE
6.3% SLOPE
6.3%
SLOPE
1% SLOPE
1%
SLO
PE
1%
SLO
PE
1% SLOPE
EXTEND ROCK-LINED
CHANNELS TO
EXISTING WATER
SURFACE ELEV.
(SLOPE VARIES)
2.1% SLOPE
6" C.I. WATER LINE
DIVERSION DITCH DD #1
(SEE DETAIL)
AFVFP #2
AFVFP #1
TIF #1
TIF #2
EXISTING AMD INFILTRATORS /
FABRIFORM CHANNEL DROP INLETS
(AT FABRIFORM SEAMS)
SETTLING POND
(EXISTING POND)
AFVFP #1 1,000 TONS AASHTO #1
"HI-CAL" LIMESTONE
AFVFP #2 1,000 TONS AASHTO #1
"HI-CAL" LIMESTONE
EXCAVATE ENTRY POOL AREA AT
PIPE OUTLET TO ALLOW FOR
SEDIMENT STORAGE
TIE EXISTING SEEP TRENCH INTO TIF #1
TO DIRECT FLOW TO AFVFP #1
(INLET POOL IS ACCEPTABLE AS NEEDED)
ANY EXISTING PIPES ENCOUNTERED FOR
THE INSTALLATION OF TIF #1 ARE TO BE
REMOVED AND FLOW DIRECTED TO TIF #1
DAYLIGHT AND DIRECT
EXISTING PIPE FOR FUTURE
DISCHARGE TO TIF #2
PROP. 8" PVC PIPE (PERFORATED)
SETTLING POND
OPTIONAL POND CLEANING
MODIFY UPSLOPE SIDE OF CHANNEL TO ALLOW
MINE DRAINAGE TO ENTER TIF AS NEEDED
.7
15.
125.3
EX. DRAINAGE SWALE
EX. LIMESTONE CELLS
LOCATED IN THE AREAS OF
TIF #2 & AFVFP #2
PROPOSED SMART DRAIN LOCATION
Drawing Prepared by Cody A Neely
2710/Ph 2 - SHEET 2
DETAILSSHEET 2 of 2
Elevation Schematic & Details
Drawing Prepared by Cody A Neely
Scale: As Shown July 2016 BioMost, Inc., Mining and Reclamation Services
Mars, PA www.biomost.com
Wolf Creek Watershed Fayette County, WV
SUMMERLEE PASSIVE TREATMENT SYSTEM
(PHASE 2)
PLATEAU ACTION NETWORK
for
NOTE:
KEY TRENCH TO BE INSTALLED ALONG CENTERLINE OF ALL EMBANKMENTS.
UNSATISFACTORY MATERIAL ENCOUNTERED DURING GROUND SURFACE PREPARATION TO BE REMOVED AND REPLACED WITH SATISFACTORY FILL MATERIAL COMPACTED AS DESCRIBED IN THE SPECIFICATIONS. GROUND SURFACE TO BE SCARIFIED TO A DEPTH OF 6 INCHES PRIOR TO FILL PLACEMENT. EX. GROUND SURFACES STEEPER THAN 4H:1V TO BE PLOWED, STEPPED, BENCHED, OR BROKEN TO ALLOW FILL MATERIAL TO BOND.
PROPOSED FINISHED GRADE
PROPOSED EMBANKMENT
TIF #1 & AFVFP #1 & #2
EARTH FILL EMBANKMENTS
& KEY TRENCH
Horizontal Scale: None Vertical Scale: None
KEY TRENCH
3 (MIN.)
VARIES
INSIDE SLOPE OUTSIDE SLOPE
FOUR, 1" PERFORATIONS EVERY 4" ALONG
LENGTH OF PIPE (OFFSET ROWS 45°)
AFVFP PIPE PERF. DETAIL
Horizontal Scale: None Vertical Scale: None
1" HOLE
(CLEAN - NO BURRS)
PIPE INVERT
8" SDR35 PVC PIPE
6" AASHTO #1 LIMESTONE
1 2
TERRACED IRON FORMATION (TIF)
Horizontal Scale: None Vertical Scale: None
CUT SLOPE (AS REQUIRED)
FILL SLOPE
(AS REQUIRED)
PLACE EXCESS
MATERIAL ON THE
DOWN-SLOPE SIDE
CONTOURS ON PLAN VIEW SHOWN AT
TOP OF ROCK LINING
SHAPE CHANNEL TO LINES AND GRADES
SHOWN AS FEASIBLE (MINOR GRADE
MODIFICATIONS MAY BE REQUIRED TO
ACCOMMODATE FIELD CONDITIONS)
*NOTE: OUTSIDE SLOPE OF TIF#1
TO BE 3H:1V (MAY FIELD ADJUST
TO 2H:1V IN AREAS NEAR
EXISTING ELECTRIC FENCING AS
NEEDED)
WV DOT SEPARATION
GEOTEXTILE
SECTION VIEW
8" SDR35 PVC OUTLET PIPE
1,000 TONS AASHTO #1
"HIGH-CAL" LIMESTONE
AFVFP #1 & #2
PIPE BEDDING STONE
NON-CALCAREOUS
AASHTO #57 AGGREGATE
(ENTIRE BOTTOM OF POND)
CLAY POND LINER 0.5' - 1' THICK
(OR APPROVED EQUIV.)
ONLY REQUIRED AS NEEDED
8" SDR35 PVC PIPE PERFORATED
(SEE AFVFP PIPE PERF DETAIL)
EXTEND CUT SLOPE
AS NEEDED
AUTO-FLUSH VERTICAL FLOW POND (AFVFP)
Horizontal Scale: None Vertical Scale: None
ANTI-SEEP COLLAR
LOCATED AT APPX. CENTERLINE OF
EMBANKMENT (SEE DETAIL)
8" CAP (CAP MAY BE SDR35
PVC, FERNCO OR OTHER
SUITABLE TYPE - DOES NOT
NEED TO BE GLUED)
EM. SPILLWAY ROCK-LINED CHANNEL
(SLOPED SECTION)
ROCK CONSTRUCTION ENTRANCE
Horizontal Scale: None Vertical Scale: None
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE MAINTAINED DURING PROJECT CONSTRUCTION TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ONSITE FOR THIS PURPOSE. AT THE END OF EACH CONSTRUCTION DAY, ALL SEDIMENT DEPOSITED ON PUBLIC
ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE.
12' (MIN)
AASHTO #1
6" (MIN.)
RO
AD
W
AY
70' (MIN.)
PLAN VIEW
SECTION A-A
A
A
GEOTEXTILE
(WV DOT-APPROVED SEPARATION TYPE)
' (M
IN
' (M
IN
EXCAVATE TRENCH BELOW PIPE
INVERT AS NEEDED - BACKFILL
WITH SATISFACTORY FILL
MATERIAL USING HAND-OR
MANUALLY-DIRECTED
COMPACTION EQUIPMENT
VA
RI
ES
CUT CIRCULAR HOLE IN RUBBER
MEMBRANE 33% SMALLER THAN
OUTSIDE PIPE DIAMETER
SPECIFICATIONS BASED ON
ANTI-SEEP COLLAR BY AGRI
DRAIN, ADAIR, IA. EQUIVALENT
OR BETTER MAY BE
SUBSTITUTED UPON APPROVAL.
(DIAMETER OR HEIGHT/WIDTH
MUST BE > DIMENSION SHOWN)
WITHIN 2' OF COLLAR AND PIPE, BACKFILL WITH
SATISFACTORY MATERIAL USING HAND-OR
MANUALLY-DIRECTED COMPACTION EQUIPMENT IN
ACCORDANCE WITH SPECIFICATIONS
AFVFP #1: ONE 8" SDR35 PVC PIPE EXTENDS
THROUGH 3 X 3 COLLAR
AFVFP #2: ONE 8" SDR35 PVC PIPE EXTENDS
THROUGH 3 X 3 COLLAR
ANTI-SEEP COLLAR
Horizontal Scale: None Vertical Scale: None
SECTION VIEW
0.5 (MIN.)
0.5 (MIN.)
EXISTING SETTLING POND WITH
WINDOWED BAFFLE CURTAIN
Horizontal Scale: None Vertical Scale: None
CHAIN WEIGHT SEWN INTO BOTTOM HEM OF CURTAIN
BAFFLE CURTAINS TO BE UV-STABILIZED
VINYL LAMINATE (BRATTICE) CLOTH
(18 OZ. FABRIC - 1899 VENTATEX) OR
APPROVED EQUIV.
CURTAINS AVAILABLE FROM:
ENVIRONMENTAL PERMITTING SERVICES, BEAVER, WV (304) 763-0251
ABC INDUSTRIES, WARSAW, IN (800) 426-0921
AMERICAN BOOM & BARRIER, CAPE CANAVERAL, FL (321) 784-2110
3/4" (MIN.) STEEL STAKE
NOTES: SEE PLAN VIEW FOR BAFFLE CURTAIN LOCATION.
*CUT 3 SIDES FOR EACH WINDOW (TOP AND BOTH SIDES) SO
WINDOW FLAP CAN BE TIED UP TO ALLOW FOR CUSTOMIZED
WINDOW LOCATIONS IN THE FUTURE.
KEY CURTAIN ~1'
INTO INSIDE SLOPE
(EACH SIDE)
FOAM FLOAT INSERT
(TOP OF CURTAIN)
2 FT MIN
~1 1/2" HEM ALONG BOTTOM OF CURTAIN (REINFORCED WEIGHT ATTACHMENT AREA)
3/4" (MIN.) STEEL STAKE 1/2" NYLON ROPE
CUSTOM CUT WINDOWS (3" HIGH X 2' LONG) INTO THE CURTAIN
4 2
1.5
1/2" (MIN.) NYLON ROPE
EXISTING DEPTH TO BOTTOM
EXISTING OUTLET
SPILLWAY
EXISTING FREEBOARD
SOLAR PANEL
(POSITION TO BE SOUTH FACING)
WEATHER-PROOF CONTROL BOX
LOCKABLE LID
LINEAR ACTUATOR
SLIDE GATE: PROGRAMMABLE TO OPEN
AND CLOSE ON AN ELECTRIC TIMER FLEXIBLE PIPE COUPLER (FERNCO)
NOTE: POSITION THE SMART DRAIN SYSTEMS SO THAT APPX 3'
OF FLOW CONTROL BOX STRUCTURE IS ABOVE FINAL GRADE.
SPECIAL ORDER STAINLESS STEEL CORNER PIECES, DUE TO CORROSIVE WATER.
INSTALL CULVERT PIPE (STANDING UPRIGHT) AS PROTECTIVE CASING (PROVIDE CUSTOM BOTTOM CUT-OUTS FOR PIPE) AND BACKFILL ANNULUS EVENLY WITH INERT AGGREGATE TO FINAL GRADE
TO EX. SETTLING POND OUTLET INVERT ELEV 1951.5
INLET TO SMART DRAINAGE SYSTEM®
FROM AFVFP#1 & #2 (8" SDR35 PVC)
AUTO - FLUSH SYSTEM
AGRI DRAIN SMART DRAINAGE SYSTEM®
Horizontal Scale: None Vertical Scale: None
STAINLESS STEEL CORNER PIECES TO BE USED
EM. SPILLWAY
(FLAT SECTION)
8" SDR35 PVC CROSS
(OR TWO TEES)
NOTE: TIF #1 MAY BE LINED WITH RECOVERED AGGREGATE
FROM EXISTING LIMESTONE CELLS. ONLY SUITABLY CLEAN
AGGREGATE SHALL BE REUSED.
DUE TO THE SLOPE OF TIF #2 ONLY AASHTO #1 LIMESTONE
SHALL BE USED.
TIF EFFLUENT STRUCTURE
Horizontal Scale: None Vertical Scale: None
1.0
0.5
NOTE: SEE SHEET 1 FOR LOCATION
AFVFP
8.0
9.0
AASHTO #1
COMPACTED EARTH FILL MATERIAL
KEY (1'X1') TRENCH INTO TIF SUBGRADE
12" HDPE N-12 (TYPE S) CULVERT PIPE
OUTLET TO AFVFP
TIF
WV DOT SEPARATION
GEOTEXTILE
2.0
DIG OUT BELOW EFFLUENT END OF PIPE
TO ALLOW FOR 5-GAL. BUCKET TO BE
PLACED FOR FLOW MEASUREMENTS
SEDIMENT TROUGH
Horizontal Scale: None Vertical Scale: None
0.5
2.0
~16 (FULL BOTTOM WIDTH OF EX. CHANNEL)
12" HDPE N-12 OUTLET PIPE
FIBERGLASS GRATING
2" THICKNESS
2" REBAR 6" GRID ON CENTER
TO EX POND
EX. FABRIFORM CHANNEL
EX. FABRIFORM CHANNEL
NOTE: TEMPORARILY PLUG AMD INFILTRATORS / EXISTING FABRIFORM CHANNEL DROP INLET STRUCTURES FOR FUTURE USE, IF DESIRED.
FIBERGLASS GRATING
2" THICKNESS
22" WIDE
2" REBAR 6" GRID ON CENTER
12" HDPE N-12 PIPE
0.5
CAST-IN-PLACE 6" WALL/BOTTOM THICKNESS
CONCRETE TROUGH
0.5
2.0
1.5
16 " X 2" X 2" STAINLESS STEEL ANGLE
ANCHORED INTO CONCRETE
SIDE VIEW
FRONT VIEW
8", 12", & 18" COMPOST FILTER SOCK (WATTLES)
Horizontal Scale: None Vertical Scale: None
3-4"
EXISTING GROUND
FLOW
DISTURBED AREA
UNDISTURBED AREA
ALTERNATIVE STAKING OPTION
WOOD STAKE 2" X 2"
COMPOST FILTER SOCK
(SIZE VARIES)
COMPOST FILTER SOCK MUST BE INSTALLED AT EXISTING LEVEL GRADE. BOTH ENDS OF EACH SECTION MUST EXTEND AT LEAST 8 FEET
UPSLOPE AT 45° TO THE MAIN ALIGNMENT.
SEDIMENT MUST BE REMOVED WHERE ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF THE FILTER SOCK.
ANY SECTION WHICH HAS BEEN UNDERMINED OR TOPPED MUST BE REPAIRED/REPLACED WITHIN 24 HOURS.
FOR WOOD STAKES, 2" X 2" (+/- 3/8") ACTUAL SIZE, NOT NOMINAL.
UNTIL PROJECT COMPLETION: REPLACE BIODEGRADABLE FILTER SOCK AFTER 6 MONTHS; PHOTODEGRADABLE AFTER 12 MONTHS
*STAKES SPACED @ 10' MAX. USE
2" X 2" WOOD OR EQUIVALENT
STEEL/LIVE STAKES TO SECURE
THE COMPOST FILTER SOCK
LOOSE COMPOST
CAST-IN-PLACE 6" WALL/BOTTOM THICKNESS
CONCRETE TROUGH
EX. FABRIFORM CHANNEL
EX. FABRIFORM CHANNEL
FABRIFORM SEDIMENT POOL
Horizontal Scale: None Vertical Scale: None
4.0
5.5 MIN
2.5
12" HDPE N-12 OUTLET PIPE
OUTLET PIPE
R-5 RIPRAP ARMORED EMBANKMENT (1.5 FT THICK)
EX. FABRIFORM CHANNEL
TO EX. BOX CULVERT
ROCK-LINED CHANNEL (TYPICAL)
Horizontal Scale: None Vertical Scale: None
2 2
GEOTEXTILE PLACED UNDER R-4 RIPRAP
(WV DOT-APPROVED EROSION CONTROL)
EXTEND EXCAVATION AT SPECIFIED
SLOPE WHERE NECESSARY
(NO STEEPER THAN 1.5:1)
PERMANENT LINING (R-4 RIPRAP)
"OVER EXCAVATE" BOTTOM TO
MINIMUM PLACEMENT THICKNESS
OF R-4 RIPRAP (1 FT)
PLACE EXCESS
MATERIAL ON THE
DOWN-SLOPE SIDE
CHANNEL INVERT MEASURED
AT TOP OF STONE
(IF APPLICABLE)
GRASS-LINED EM. SPILLWAY (TYPICAL)
Horizontal Scale: None Vertical Scale: None
2 2
PERMANENT LINING (GRASS)
TEMP. LINING S-75 MULCH BLANKET
(SLOPE VARIES)
(NO SLOPE)
NOTE: ALL ROCK-LINED CHANNELS / OUTLET PROTECTION
AREAS MAY BE LINED WITH RECOVERED R-4 RIPRAP (OR
LARGER) FROM EXISTING LIMESTONE CELL CHECK DAMS.
ONLY SUITABLY CLEAN AGGREGATE SHALL BE REUSED.
AGRI DRAIN SMART DRAINAGE
SYSTEM - SOLAR PANEL NOT SHOWN
(SEE DETAIL)
UPRIGHT PROTECTIVE CASING FOR
AASHTO #57 AGGREGATE BACKFILL
[36" HDPE N-12 (TYPE S) PIPE]
UPRIGHT PROTECTIVE CASING
FOR INERT AASHTO #57 BACKFILL
[36" HDPE N-12 (TYPE S) PIPE]
8" X 8" FERNCO COUPLING
(OR EQUIVALENT)
8" FERNCO ATTACHMENTS
TO AGRI DRAIN SMART DRAIN
R-4 RIPRAP (BOTTOM)
1FT THICK
GEOTEXTILE PLACED UNDER R-4 / R-5 RIPRAP
(WV DOT-APPROVED EROSION CONTROL)
AGRI DRAIN SMART DRAINAGE
SYSTEM - SET TOP STOPLOG CREST
~1FT BELOW EM. SPILLWAY CREST
GRASS-LINED DIVERSION DITCH
Horizontal Scale: None Vertical Scale: None
2 2
PERMANENT LINING (GRASS)
TEMP. LINING S-75 MULCH BLANKET
(2.5% SLOPE)
FABRIFORM TO BE REMOVED
6"
WV DOT-APPROVED
SEPARATION GEOTEXTILE
EM. SPILLWAY CREST ELEV. 1958.0
TOP EMBANKMENT ELEV. 1959.0
POND BOTTOM ELEV. 1952.0
AASHTO #57 BACKFILL BETWEEN 36" PIPE
AND SMART DRAIN STRUCTURE
THICKNESS VARIES
TOP OF STONE ELEV. 1941.5
BOTTOM EARTHWORK ELEV. 1935.0
(Check the box next to each addendum received)
SUMMERLEE AMD TREATMENT
File details come from the government source that posted it. Updated .