This document is Addendum #2 for the Fairmont Gateway Connector Portals Project, issued by the West Virginia Department of Environmental Protection (WVDEP) with the solicitation number ARFQ DEP2600000031-1. The addendum documents the results of a pre-bid conference conducted on-site on October 22, 2025, and provides a formal mechanism for addressing a vendor question regarding project specifications. The addendum specifically clarifies a material specification detail for the project, namely the requirement to use #8 Pea River Gravel in the 4,000 psi grout mix, explicitly prohibiting the substitution of #8 crushed limestone.

The addendum follows standard procurement protocols, requiring vendors to acknowledge receipt of the addendum and warning that failure to do so may result in bid disqualification. No pricing terms, set-asides, or funding details are disclosed in this document. The primary purpose is to provide official clarification on a technical specification to ensure all potential bidders have consistent and accurate information about the material requirements for the Fairmont Gateway Connector Portals Project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGENCY SOLICITATION NUMBER – ARFQ ______________

Addendum Number: ____

The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid closing date and time

[ ] Modify specification of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[ ] Other

Description of Modification to Solicitation:

This Addendum issued to publish and distribute the attached documentation to the vendor community.

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

FAIRMONT GATEWAY PORTALS

Addendum #2

Fairmont Gateway Connector Portals Project

Permit (NA)

ARFQ DEP2600000031-1

The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on October 22, 2025, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.

QUESTIONS AND ANSWERS

Q1. In reference to specification 9.2.1 can you confirm that you want #8 pea RIVER gravel or can we use #8 Limestone in the 4,000.00 PSI grout mix

A1. Confirming Specification 9.2.1 and in response to question Q1, #8 Pea River Gravel is required for the 4,000 psi grout mix. The use of #8 crushed limestone is not allowed.

PRE-BID QUESTIONS AND ANSWERS - NA

REVISED SPECIFICATIONS - NA

REVISED DRAWINGS – NA

CLARIFICATIONS, NOTES, AND CHANGES - NA

PRE-BID SIGN IN SHEETS - NA

ATTACHMENT A

AGENCY SOLICITATION NUMBER ARFQ: DEP2600000031
Addendum Number: 2
Check Box1: Off
Check Box2: Off
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Off
Text7: 1. To publish vendor question and response.