This addendum document modifies solicitation ARFQ GSD2700000032 by publishing technical questions and responses submitted by vendors regarding the procurement of specialized golf cart or low-speed vehicle (LSV) equipment. The addendum addresses specifications outlined in sections 3.1.1.1 through 3.1.1.21, covering motor systems, charging capabilities, braking mechanisms, suspension components, vehicle dimensions, ground clearance, speed configurations, and gradeability requirements. No modifications to bid opening dates, project timelines, site visits, or bidders' conferences are indicated in this addendum. The document establishes that vendors may submit only one offer per vendor, with awards going to the lowest-cost bid meeting specified requirements, rather than permitting multiple separate offers for different vehicle models from a single vendor.
Key technical clarifications provided include acceptability of alternative motor and controller systems (such as 48V AC motors with Aries controllers as substitutes for specified DC motors), flexibility regarding charger specifications and certifications provided standard 110/120V compatibility and eight-hour full-charge capability are achieved, and confirmation that fiberglass body construction, steering systems, and 30 percent gradeability requirements remain mandatory. The Division rejected certain proposed alternatives, including 52V systems and 25 mph LSV configurations, while accepting minor deviations in vehicle length, width, and ground clearance measurements from specified minimums. No pricing information, funding sources, set-asides, or contract terms beyond the technical specifications are detailed in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised
SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]
The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
ARFQ GSD2700000032
No. 1
Addendum is issued to publish and distribute the following information to the Vendor community.
1. To Publish Technical Questions submitted by Vendors for ARFQ GSD2700000032
No other changes.
ATTACHMENT A
Q1. § 3.1.1.1 - Would the Division accept a 48V, 5 kW AC motor paired with an Aries 450A controller in place of the specified DC shunt-wound motor and Curtis 250A controller?
A1. Yes
Q2. § 3.1.1.2 - What documentation is required to establish controller equivalency?
A2. Specifications for the controller that is bid.
Q3. § 3.1.1.19 & § 3.1.1.21 - The C4 is 109 inches long, 48 inches wide, and has 4.72 inches of ground clearance. Would the Division accept the 109-inch overall length given the specified minimum of 112 inches?
A3. Yes
Q4. § 3.1.1.4 & § 3.1.1.5 - Would a charger designed for the proposed lithium battery be acceptable if it uses a standard 110/120V outlet and achieves a full charge within eight hours, but differs in output amperage or certification?
A4. Yes
Q5. § 3.1.1.4 & § 3.1.1.5 - Which charger ratings and certifications are mandatory?
A5. See answer to Q4.
Q6. § 3.1.1.6 - Would the Division consider hydraulic disc brakes with an electromagnetic parking brake and a double A-arm front suspension with a solid rear axle?
A6. Yes
Q7. § 3.1.1.19 & § 3.1.1.21 - Are the specified fiberglass body, self-compensating rack-and-pinion steering, and 30% gradeability mandatory as written?
A7. Yes
Q8. § 3.1.1.18 - Venom publishes a 19 mph maximum for its golf-cart configuration and a 25 mph maximum for its approved LSV configuration. Would the Division accept the 19 mph configuration if the manufacturer also documents compliance with the 3–7 mph reverse speed requirement?
A8. Yes
Q9. § 3.1.1.18 - Would the Division consider allowing the 25 mph LSV configuration by addendum?
A9. No
Q10. § 3.1.1.1 - § 3.1.1.5 - Would the Division consider Venom’s 52V system with a 5 kW KDS motor and FJ controller in place of the specified 48V DC shunt-wound motor and Curtis 250A controller or equivalent?
A10. No
Q11. § 3.1.1.1 - § 3.1.1.5 - What documentation would be required for the controller and the 52V charger, including charger certification, output ratings, and full-charge time?
A11. No
Q12. § 3.1.1.19 & § 3.1.1.21 - Both models list a 51-inch width and 6.25 inches of ground clearance. Would the Division accept those measurements given the 50-inch width limit and 5-inch clearance limit?
A12. Yes
Q13. § 3.1.1.6, § 3.1.1.9, & § 3.1.1.21 - Would the Division consider the Strike 4’s published four-wheel hydraulic disc brakes, electromagnetic parking brake, and independent front and rear suspension?
A13. Yes
Q14. § 3.1.1.6, § 3.1.1.9, & § 3.1.1.21 - Venom’s Strike guide lists 15% maximum gradeability for the four-passenger model. Is the 30% gradeability requirement firm?
A14. Yes
Q15. May a single vendor submit separately priced offers for all three models for the purchase of one cart, provided each offered configuration meets the requirements as clarified by addendum?
A15. No, only the lowest (cost) bid item meeting specification will get awarded.
Q16. If multiple offers are permitted, should we submit one primary offer and two alternates in a single wvOASIS response, or a separate response for each model?
A16. Only one offer should be submitted.
Q17. How should we enter the three prices in wvOASIS, and should we complete a separate Exhibit A for each model?
A17. Only the lowest (Cost) item meeting specifications should be bid.
Q18. Will each eligible offer be evaluated independently for award?
A18. No, because only the lowest (cost) item will be awarded through the evaluation.
Q19. If only one offer per vendor is permitted, please confirm that we should select one model and submit one delivered price.
A19. Yes