Addendum No 1 Hoeft State Park.pdf

PDF 233 KB Posted

Attached to
751/13234. GAG - Hoeft SP - Electrical Improvements
Solicitation number
RFQ 171 180000000584 3
Issued by
Presque Isle County, Michigan

About this file

This addendum modifies the Construction Documents for the P.H. Hoeft State Park Campground Electrical Improvements project issued by the Michigan Department of Natural Resources (DNMB) in Rogers City, Michigan. The project, identified as File No. 751/13234.GAG and WAK Project No. 18-0810-0104, involves preparation and installation of electrical improvements and site preparation across multiple campground locations. The scope includes crushed limestone base installation, compaction, grading, and seeding for eyebrow sites (36, 52, 53, 90, 96, 129), back-in/host/barrier-free sites (2, 10, 19, 59, 61, 63, 66, 78, 109, 119, 120, 126, 128), and pull-through/barrier-free sites (75, 76, 80, 82, 84, 86, 108). Additional work includes installation of edge protection posts, relocation of existing fire rings, and coordination with Presque Isle Electric and Gas (Wesley Repke, 989-733-1044) for electrical service setup.

The addendum clarifies specifications and drawing details to ensure proper electrical installation using THWN or XHHW style cables in raceway without direct burial. Turf seeding requirements are specified with a detailed seed mix composition including Blue Fescue, Creeping Red Fescue, Chewings Fescue, Hard Fescue, and Perennial Ryegrass. Modifications to the pull-through and barrier-free site plans require compacted limestone placement in front of power pedestals consistent with eyebrow site details. The contractor assumes responsibility for fire ring relocation and replacement at no additional cost to the owner should damage occur. All site work must be compacted and tested per project specifications, with post placement confirmed by the DNR Field Engineer or representative.

View the file

Other files

File Type Posted
Bid Advertisement - Hoeft SP.pdf PDF
Specs - Hoeft SP.pdf PDF
Plans-Hoeft SP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOEFT STATE PARK ADDENDUM #1

ELECTRICAL IMPROVEMENTS FILE # 751/13234.GAG

ADDENDUM NO. 1

PROJECT: MICHIGAN DEPARTMENT OF NATURAL RESOURCES

P.H. HOEFT STATE PARK CAMPGROUND

ELECTRICAL IMPROVEMENTS

OWNER: DTMB

FILE NO.: 751/13234.GAG

INDEX NO.: 53130

ENGINEER / WILLIAM A. KIBBE & ASSOCIATES, INC.

ARCHITECT:

PROJECT P.H. HOEFT STATE PARK

LOCATION: ROGERS CITY, MI

DATE: MAY 18, 2018

WAK PROJECT NO. 18-0810-0104

A. INSTRUCTIONS:

1. The Construction Documents Issued for Bid dated April 30, 2018 for the above referenced project is modified as noted in this Addendum.

2. All work performed under this document shall be subject to the General

Conditions of the Contract and Specifications for similar work in connection with this project.

3. Attachment’s to the addendum:

a) Pre-Bid sign in sheet

B. CLARIFICATIONS

1. Scope of work clarification: The contractor will prepare and install the new eyebrow, back-in, pull-through, campground host and barrier free sites for crushed lime stone, limestone fines, compaction and grading. The following sites to receive these improvements are identified with the new site numbers. Eyebrow Sites – 36, 52, 53, 90, 96 and 129. Back-in/Host/Barrier Free – 2, 10, 19, 59, 61, HOEFT STATE PARK ADDENDUM #1

ELECTRICAL IMPROVEMENTS FILE # 751/13234.GAG

63, 66, 78, 109, 119, 120, 126, 128. Pull-Through/Barrier Free – 75, 76, 80, 82, 84, 86, 108

2. Clarification: All new eyebrow, back-in, pull-through campground host and barrier free sites will have crushed lime stone base and sites topped crushed limestone fines to fill voids and smooth the surface. All sites shall be compacted and tested per the specifications.

3. Each Eyebrow and Back-In Site shall receive edge protection posts. Refer to Details and locate post with DNR Field Engineer or representative.

4. Presque Isle Electric and Gas Contact is Wesley Repke (989) 733-1044. Service order setup to initiate work must start at the main office (989) 733-8515.

5. No Fire Rings new rings are required as part of this contract. The contractor is responsible for moving the existing fire rings as necessary to perform the required work and placing them on the improved sites. If damaged by the contractor it will be the contractors responsibility to replace them at no additional cost to the owner.

C. CHANGES TO SPECIFICATIONS

1. Refer to section 260519, 2.1, B. – LOW-VOLTAGE ELECTRICAL POWER

CONDUCTORS:

a) Acceptable cable types will be THWN or XHHW style cables in raceway. No direct buried cable.

2. Refer to Section 329200, 2.1, B. – TURF AND GRASSES –

a) Lawn Area seed mix Shall be 10% SR3210 Blue Fescue, 10% Shoreline

Slender Creeping Red Fescue, 20% SR5250 Creeping Red Fescue, 20% Windward Chewings Fescue, 15% Longfellow II Chewings Fescue, 25% SR3150 Hard Fescue. Provide with Perennial Ryegrass added to the mix equal to 20% of the mix.

D. CHANGES TO DRAWINGS

1. Refer to Sheet E301:

a) Detail 1/E301 – Typical Pull-Through Campsite Layout Plan – Provide compacted limestone in front of the campsite power pedestal 5’ wide similar to the Eyebrow site detail.

b) Detail 4/E301 – Edge Protection Detail – Remove concrete and Lag Bolts and install post into the ground as shown and compact ground around the post.

2. Refer to Sheet E302:

a) Detail 1/E302 – Typical Barrier-Free, Back-In & Host Campsite Plan – Compacted limestone is not required behind the campsite power pedestal.

Provide in front of the pedestal similar to what is shown in the Eyebrow site detail.

END OF ADDENDUM No. 1