This document is Addendum No. 1 for a Michigan Department of Natural Resources (MDNR) project at P.H. Hoeft State Park in Rogers City, Michigan, focusing on campground electrical improvements. The project involves site renovations for multiple campground locations, specifically targeting 36 distinct campsites including eyebrow sites (36, 52, 53, 90, 96, 129), back-in/host/barrier-free sites (2, 10, 19, 59, 61, 63, 66, 78, 109, 119, 120, 126, 128), and pull-through/barrier-free sites (75, 76, 80, 82, 84, 86, 108). The scope of work includes preparing and installing new sites with crushed limestone base and fines, compaction, grading, and edge protection posts, with site improvements to be completed according to specifications dated April 30, 2018.
The addendum provides technical clarifications regarding electrical conductors (specifying THWN or XHHW style cables in raceway), lawn area seed mix composition, and specific site layout modifications. The project will involve relocating existing fire rings and ensuring proper site preparation, with Presque Isle Electric and Gas serving as the local utility contact. No additional cost information is provided, and the document serves primarily to refine technical specifications and site preparation requirements for the campground electrical improvement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specs - Hoeft SP.pdf | ||
| Bid Advertisement - Hoeft SP.pdf | ||
| Plans-Hoeft SP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOEFT STATE PARK ADDENDUM #1
ELECTRICAL IMPROVEMENTS FILE # 751/13234.GAG
ADDENDUM NO. 1
PROJECT: MICHIGAN DEPARTMENT OF NATURAL RESOURCES
P.H. HOEFT STATE PARK CAMPGROUND
ELECTRICAL IMPROVEMENTS
OWNER: DTMB
FILE NO.: 751/13234.GAG
INDEX NO.: 53130
ENGINEER / WILLIAM A. KIBBE & ASSOCIATES, INC.
ARCHITECT:
PROJECT P.H. HOEFT STATE PARK
LOCATION: ROGERS CITY, MI
DATE: MAY 18, 2018
WAK PROJECT NO. 18-0810-0104
A. INSTRUCTIONS:
1. The Construction Documents Issued for Bid dated April 30, 2018 for the above referenced project is modified as noted in this Addendum.
2. All work performed under this document shall be subject to the General
Conditions of the Contract and Specifications for similar work in connection with this project.
3. Attachment’s to the addendum:
a) Pre-Bid sign in sheet
B. CLARIFICATIONS
1. Scope of work clarification: The contractor will prepare and install the new eyebrow, back-in, pull-through, campground host and barrier free sites for crushed lime stone, limestone fines, compaction and grading. The following sites to receive these improvements are identified with the new site numbers. Eyebrow Sites – 36, 52, 53, 90, 96 and 129. Back-in/Host/Barrier Free – 2, 10, 19, 59, 61, HOEFT STATE PARK ADDENDUM #1
ELECTRICAL IMPROVEMENTS FILE # 751/13234.GAG
63, 66, 78, 109, 119, 120, 126, 128. Pull-Through/Barrier Free – 75, 76, 80, 82, 84, 86, 108
2. Clarification: All new eyebrow, back-in, pull-through campground host and barrier free sites will have crushed lime stone base and sites topped crushed limestone fines to fill voids and smooth the surface. All sites shall be compacted and tested per the specifications.
3. Each Eyebrow and Back-In Site shall receive edge protection posts. Refer to Details and locate post with DNR Field Engineer or representative.
4. Presque Isle Electric and Gas Contact is Wesley Repke (989) 733-1044. Service order setup to initiate work must start at the main office (989) 733-8515.
5. No Fire Rings new rings are required as part of this contract. The contractor is responsible for moving the existing fire rings as necessary to perform the required work and placing them on the improved sites. If damaged by the contractor it will be the contractors responsibility to replace them at no additional cost to the owner.
C. CHANGES TO SPECIFICATIONS
1. Refer to section 260519, 2.1, B. – LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS:
a) Acceptable cable types will be THWN or XHHW style cables in raceway. No direct buried cable.
2. Refer to Section 329200, 2.1, B. – TURF AND GRASSES –
a) Lawn Area seed mix Shall be 10% SR3210 Blue Fescue, 10% Shoreline
Slender Creeping Red Fescue, 20% SR5250 Creeping Red Fescue, 20% Windward Chewings Fescue, 15% Longfellow II Chewings Fescue, 25% SR3150 Hard Fescue. Provide with Perennial Ryegrass added to the mix equal to 20% of the mix.
D. CHANGES TO DRAWINGS
1. Refer to Sheet E301:
a) Detail 1/E301 – Typical Pull-Through Campsite Layout Plan – Provide compacted limestone in front of the campsite power pedestal 5’ wide similar to the Eyebrow site detail.
b) Detail 4/E301 – Edge Protection Detail – Remove concrete and Lag Bolts and install post into the ground as shown and compact ground around the post.
2. Refer to Sheet E302:
a) Detail 1/E302 – Typical Barrier-Free, Back-In & Host Campsite Plan – Compacted limestone is not required behind the campsite power pedestal.
Provide in front of the pedestal similar to what is shown in the Eyebrow site detail.
END OF ADDENDUM No. 1