Addendum No 1.pdf
PDF 238 KB Posted
- Attached to
- Cashmere Sapinero Looping Waterline
- Solicitation number
- IFB-2023-W-004
- Issued by
- Pueblo County, Pueblo City, Colorado
About this file
Addendum No. One for the Cashmere Sapinero Looping Waterline project is issued by the Pueblo West Metropolitan District for Bid No. IFB-2023-W-004, dated June 6, 2023. The addendum provides clarifications and responses to five key questions from potential contractors regarding the waterline construction project, which involves installing approximately 285 linear feet of 6-inch C900 PVC waterline on Sapinero Drive and approximately 815 linear feet of 6-inch C900 PVC waterline on Cashmere Avenue north of East Loma Drive.
The addendum addresses critical project details, including disposal of excavated materials (which can be done at the Pueblo West Wastewater Treatment Facility), tax exemption status (Pueblo West Metropolitan District is tax exempt), contractor responsibilities for pressure testing, backfilling requirements, and water sourcing (contractors must rent a hydrant meter from Pueblo West Water Department). The document also includes a drawing modification for Drawing C1.0, specifically noting a location where a 6-inch cross must be installed as required, with specific station and coordinate details. The addendum serves to provide additional information and clarification to potential bidders, ensuring they have comprehensive understanding of the project specifications and requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Released IFB-2023-W-004 Cashmere Sapinero Looping Waterline.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUEBLO WEST METROPOLITAN DISTRICT
ADDENDUM NO. ONE
Cashmere Sapinero Looping Waterline
Bid No.: IFB-2023-W-004
Date: June 6, 2023
QUESTIONS AND RESPONSES
1. Will a disposal site be provided for this project?
Response: The Contractor may dispose of excavated material at the Pueblo West Wastewater Treatment Facility 1370 E. Grouse Dr.
2. Is this project tax exempt or does the 3.4% Pueblo City sales and Use Tax Apply?
Response: Pueblo West Metropolitan District is tax exempt. A copy of the Pueblo West tax exempt certificate will be provided to the awarded contractor.
3. Will the contractor be responsible for pressure testing?
Response: Yes
4. If excavation is out of the roadway can native materials be used for backfilling after pipe bedding has been placed?
Response: Requirements for Fills and Embankments using native or imported fill are described in Section 02300.
5. Will there be a place with a meter for watering or will the contractor need to supply it from elsewhere?
Response: The contractor will be expected to rent a hydrant meter from the Pueblo West Water Department. The deposit and usage will be at the normal existing rates.
DRAWINGS
1. Drawing C1.0. Modify the note as shown below
This Addendum to the above-referenced bid shall become part of the IFB and shall be binding in all respects, as applicable:
The undersigned bidder acknowledges receipt of this Addendum No. One:
Received By: _____________________________________________________________
Company Name: __________________________________________________________
Company Address: ________________________________________________________
Date: _______________________
Telephone Number: _____________________________
E-Mail Address: ________________________________
END OF ADDENDUM