Addendum no 1.pdf

PDF 118 KB Posted

Attached to
RFB-225-25 MA for Dredging of KY River Locks 1 - 5
Solicitation number
RFB-785-2500000638-2
Issued by
Calloway County, Kentucky

About this file

This is an Addendum (Number One) for an Invitation to Bid (RFB-222-25) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Kentucky River Authority's MA FOR 2025 DREDGING project involving Kentucky River Locks 1 through 5. The addendum, dated April 24, 2025, modifies the original bid document by replacing page 3 with a revised version and indicates that no bid bond is required for this project. The bid document outlines five line items for the dredging project: Mobilization, Travel Time, Crane Time, Compressor Time, and Down Time, with specified maximum hours for each category.

The bid document provides a detailed breakdown of estimated maximum time for each project component, allowing potential bidders to submit unit prices and total costs. The maximum time allocations include 46 hours for Travel Time, 90 hours for Crane Time, 1 hour for Compressor Time, and 10 hours for Down Time. Bidders are required to complete the Authentication of Bid and Statement of Non-Collusion and Non-Conflict of Interest page to validate their submission. The document is structured to enable competitive bidding for the dredging maintenance and operations work on the Kentucky River Locks system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-222-25

FOR: MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

DATE: April 24, 2025

RFB-785-2500000638

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to page 3 of the bid document, use attached revised page 3 in lieu of previously issued.

Item 2: No bid bond is required on this project.

END OF ADDENDUM

Invitation to Bid No. RFB-225-25 For: MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

REVISED RFB-225-25

OFFICIAL BID DOCUMENT

FOR

MA FOR 2025 DREDGING

KY RIVER AUTHORITY

KY RIVER LOCKS 1 THRU 5

Item No. Description Units Est. Maximum

Time Unit Price Total Cost

1.

Mobilization

LS

2.

Travel Time

Hours

3.

Crane Time

4.

Compressor Time

5.

Down Time

GRAND TOTAL $_____________________________

NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF

INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE BID TO BE VALID.

addendum no 1.pdf
addendum no 1
Add 1 page 2

Pages from Official Bid Document.pdf

File details come from the government source that posted it. Updated .