Addendum no 1.pdf
PDF 118 KB Posted
- Solicitation number
- RFB-785-2500000638-2
- Issued by
- Calloway County, Kentucky
About this file
This is an Addendum (Number One) for an Invitation to Bid (RFB-222-25) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Kentucky River Authority's MA FOR 2025 DREDGING project involving Kentucky River Locks 1 through 5. The addendum, dated April 24, 2025, modifies the original bid document by replacing page 3 with a revised version and indicates that no bid bond is required for this project. The bid document outlines five line items for the dredging project: Mobilization, Travel Time, Crane Time, Compressor Time, and Down Time, with specified maximum hours for each category.
The bid document provides a detailed breakdown of estimated maximum time for each project component, allowing potential bidders to submit unit prices and total costs. The maximum time allocations include 46 hours for Travel Time, 90 hours for Crane Time, 1 hour for Compressor Time, and 10 hours for Down Time. Bidders are required to complete the Authentication of Bid and Statement of Non-Collusion and Non-Conflict of Interest page to validate their submission. The document is structured to enable competitive bidding for the dredging maintenance and operations work on the Kentucky River Locks system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-222-25
FOR: MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
DATE: April 24, 2025
RFB-785-2500000638
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to page 3 of the bid document, use attached revised page 3 in lieu of previously issued.
Item 2: No bid bond is required on this project.
END OF ADDENDUM
Invitation to Bid No. RFB-225-25 For: MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration
REVISED RFB-225-25
OFFICIAL BID DOCUMENT
FOR
MA FOR 2025 DREDGING
KY RIVER AUTHORITY
KY RIVER LOCKS 1 THRU 5
Item No. Description Units Est. Maximum
Time Unit Price Total Cost
1.
Mobilization
LS
2.
Travel Time
Hours
3.
Crane Time
4.
Compressor Time
5.
Down Time
GRAND TOTAL $_____________________________
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF
INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE BID TO BE VALID.
| addendum no 1.pdf |
| addendum no 1 |
| Add 1 page 2 |
Pages from Official Bid Document.pdf
File details come from the government source that posted it. Updated .