Addendum No_ 1.pdf
PDF 1 MB Posted
- Solicitation number
- PE-66992-NONST-2023-000000002
- Issued by
- Lamar County, Georgia
About this file
This document is an Addendum No. 1 for the Veterans Parkway & Walmart Drive Traffic Signal & Roadway Improvements project for the City of Hinesville, Georgia. The project is being managed by P.C. Simonton Engineering, LLC. The addendum amends the original plans, specifications, and bid documents, including changing the bid date from November 2, 2023 to November 8, 2023 at 11:00 am local time. The revised bid item sheet P-2 and plan sheet C2.0 are also attached. The project includes items such as demolition, clearing and grading, concrete curb and gutter, asphalt paving, striping and signage, and storm drainage improvements.
The bid items list unit prices and total estimated costs for the various work items. No information is provided on pricing terms, set asides, incumbents, funding requirements and sources, or any other salient commercial details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2023_07 Traffic Signal and Roadway Improv.pdf | ||
| addendum no_ 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1050 Parkside Cmns, Suite 101, Greensboro, Georgia
Phone: (706) 454-0870 (912) 977-1502
Addendum No. One
Date: October 26, 2023
Project: Veterans Parkway & Walmart Drive Traffic Signal &
Roadway Improvements for City of Hinesville.
SE No. 2015-49
Engineer: P.C. Simonton Engineering, LLC.
Greensboro & Hinesville, Georgia
The original plans, specifications, and bid documents are amended to include the following:
Bid Advertisement and Instructions to Bidder:
• The bid date is changed from November 2, 2023, to November 8, 2023, at 11:00 am local time at Hinesville City Hall.
Bid Items:
• Replace the Bid Item sheet P-2 with the enclosed revised Bid Item sheet P-2.
Plans:
• Replace the Plan Sheet C2.0 with the attached Plan Sheet C2.0 showing changes in clouded area.
-END-
Paul C. Simonton
10-26-23
Estimated
Quantity Units Description Unit Price Total Price
1 1 LS Demolition $
2 1 LS Clrearing, Grubbing & Grading $
3 ROADWAY
A. 230 LF 24" Standard Concrete Curb & Gutter $ $
B. 200 LF 30" Standard Concrete Curb & Gutter $ $
C. 200 SY 8" Crusher Run Base
D. 2,850 SY 10" Crusher Run Base $ $
E. 5,750 SY Asphalt Milling $ $
F. 6,450 SY 1.25" 9.5 mm Superpave Asphalt $ $
G. 200 SY 1.5" 9.5 mm Superpave Asphalt $ $
H. 3,100 SY 2" 19 mm Superpave Asphalt $ $
I. 2,850 SY 5" 25 mm Superpave Asphalt $ $
J. 210 SY 4" Raised Concrete Islands $ $
K. 30 SY Conc Median w/ Type 3 Face
L. 220 SY Conc median w/ Type 7 Face $ $
ROADWAY SUBTOTAL: $
4 STRIPING & SIGNAGE
A. 760 LF 5" Solid Yellow Centerline Striping (Thermo) $ $
B. 2,065 LF 5" Solid White Striping (Thermo) $ $
C. 95 LF 5" Skip White Striping (Thermo) $ $
D. 545 LF 5" Skip White Striping (2' Seg., 6' Gap) (Thermo) $ $
E. 1,525 LF 8" Solid White Striping (Crosswalk) (Thermo) $ $
F. 25 LF 5" Mini Skip Striping (Thermo) $ $
G. 105 LF 18" Mini Skip Striping (Thermo) $ $
H. 340 SY Detail "A" White Hatch (Thermo) $ $
I. 390 SY Detail "C" White Hatch (Thermo) $ $
J. 570 SY Detail "C" Yellow Hatch (Thermo) $ $
K. 115 LF 24" Solid White Striping (Stop Bar) (Thermo) $ $
L. 32 EA Pavement Marking Arrow (Type 1/2/3) (Thermo) $ $
M. 5 EA Yield Sign (R1-2) $ $
N. 3 EA "State Law Stop for Ped." Sign (R560-5) $ $
O. 1 EA "No U-Turn" Sign (R3-4) $ $
P. 4 EA "Left Turn Yield on Flashing Yellow Arrow" (R10-5A) $ $
Q. 2 EA Overhead Street Sign D3-1 $ $
R. 1 LS Eradication of Ex. Striping not Paved Over $
STRIPING & SIGNAGE SUBTOTAL: $
5 STORM DRAINAGE
A. 40 LF 18" RCP $ $
B. 36 LF 24" RCP $ $
C. 3 EA Catch Basin/Curb Inlet $ $
D. 1 EA Yard Inlet (GDOT 9031S Drop Inlet) $ $
E. 1 EA Concrete Flume $ $
F. 2 EA New Drainage Structure over Existing Pipe $ $
G. 1 EA Closure of Exisitng Box $ $
STORM DRAINAGE SUBTOTAL: $
Veterans Pkwy & Walmart Drive Signal & Roadway Improvements for
SE Project No. 2015-49
Item No.
City of Hinesville
BID ITEMS
P-2
"T
HI
S
DR
AW
IN
G
IS
A N
IN
ST
RU
M
EN
T
O F
SE
RV
IC
E
AN
D
RE
M
AI
N
S
TH
E
PR
O
PE
RT
Y
O F
SI
M
O N
TO
N
E N
GI
N
EE
RI
N G, L
LC
IT
M
AY
N O
T
BE
C O
PI
ED
, A
LT
ER
ED
, O R
RE
PR
O
DU
CE
D
IN
AN
Y M
AN
N
ER
W
IT
HO
U T
PE
RM
IS
SI
O N
O N
A S
IG
N
ED
A
N D
SE
AL
ED
D
O
CU
M
EN
T.
T
HE
IN
FO
RM
AT
IO
N C
O N
TA
IN
ED
H
ER
EI
N
IS
IN
TE
N
DE
D
FO
R
TH
E N
AM
ED
C
LI
EN
T
O N
LY
IN
TH
E
EV
EN
T
O F
AN
E
LE
CT
RO
N
IC
V
ER
SI
O N
S
IM
O N
TO
N
E N
GI
N
EE
RI
N G, L
LC
. A
SS
U M
ES
N
O
RE
SP
O
N
SI
BI
LI
TY
F
O R
DA
TA
G
EN
ER
AT
ED
, A
LT
ER
ED
O
R
ST
AK
ED
F
RO
M T
HI
S
DR
AW
IN
G.
I N
TH
E
EV
EN
T O
F A
DI
SP
U
TE
, H
AR
D
CO
PI
ES
W
IL
L
TA
KE
P
RE
CE
DE
N
CE
O
VE
R
AN
Y
EL
EC
TR
O
N
IC
M
ED
IA
~S
IM
O
N
TO
N E
N
GI
N
EE
RI
N
G, L
LC
RE
VI
SE
D:
DA
TE
: S ep te m be r 9
, 2
FI
LE
N O
: 2
5-
PR
J
DR
AW
IN
G
CO
M
PL
ET
ED
B
Y:
P
AR
KS
ID
E
CO
M M
O N
S
SU
IT
E
GR
EE
N
SB
O
RO
, G A
TE
L:
6)
-0 w w w
.s im on to ne ng in ee rin g.
co m
Li be rt y
Co un ty , G eo rg ia Ve te ra ns P ar kw ay S
R fo r
Ci ty o f H in es vi lle
Ve te ra ns
P kw y
W al m ar t D riv e Si gn al
R oa dw ay Im pr ov em en ts
No. 11009
PROFESSIONAL
REGISTERED
PAU L C. S I M O N TO NENGINEER
SH
EE
T:
C
2.
Ro ad w ay
, G ra di ng
D ra in ag e
Pl an
-1
7-
G
DO
T
CO
M M
EN
TS
-1
2-
G
DO
T
CO
M M
EN
TS
2-
-2
GD
O
T
CO
M M
EN
TS
6-
-2
GD
O
T
CO
M M
EN
TS
-5
-2
M O
D.
W
AL
M
AR
T
CO
M
M
EN
TS
PA
RK
IN
G
LO
T
DI
M
A N
D
GR
AD
ES
File details come from the government source that posted it. Updated .