Addendum No 1 combined 06192025.pdf

PDF 262 KB Posted

Attached to
2025-003-RFP-CATL230029-SEWER SYSTEM REHAB
Solicitation number
PE-66679-NONST-2025-000000008
Issued by
Pickens County, Georgia

About this file

Addendum No. 1 to the City of Jasper, Georgia's 2025-003-RFP for Sewer System Rehabilitation provides clarifications and modifications to the original bid solicitation. The project encompasses approximately 49,036 linear feet of 8 to 12-inch sewer line cleaning and CCTV inspection, 3,400 linear feet of 8 to 12-inch CIPP (Cured-in-Place Pipe) installation, 1,200 linear feet of sewer point repairs, 245 manhole inspections, and 25 or more manhole rehabilitations, with an alternate bid option for 13 Mission M150 SCADA units and associated accessories. Bids are due by 2:00 PM on July 1, 2025, at 200 Burnt Mountain Road, Jasper, GA 30143, with public opening and reading of bids to follow. The project must achieve substantial completion within 270 calendar days from the notice to proceed. All interested parties are invited to attend the bid opening.

The addendum clarifies specific contract requirements, technical specifications, and bid conditions outlined in the original solicitation documents. Bids must be submitted on a unit price basis for all material, labor, and equipment. The City of Jasper will evaluate proposals based on the contract documents and technical specifications provided. Additional details regarding pricing terms, payment conditions, bonding requirements, or other financial terms are contained within the full contract documents and technical specifications referenced in the solicitation package.

View the file

Other files

File Type Posted
Bid Advertisement _ Sanitary Sewer Collection.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .