ADDENDUM NO 1 ARFQ DEP25-10 FILE 1.pdf
PDF 34 MB Posted
- Attached to
- New Billeting Cabins Design- Camp Dawson
- Solicitation number
- CEOI-0603-ADJ2500000004-1
- Issued by
- Preston County, West Virginia
About this file
This document is an Addendum No. 1 to a Request for Quotation (ARFQ) issued by the West Virginia Department of Environmental Protection for a New Billeting Cabins Design project at Camp Dawson in Preston County, West Virginia. The addendum provides clarifications and modifications to the original solicitation, including updates to the project scope, specifications, and key dates. The project involves the design of new billeting cabins at the camp, but the specific quantities are not provided. The deadline for submission of bids is extended to a new date, and a mandatory bidder's conference is scheduled prior to the submission deadline.
The pricing and funding details are not specified in this addendum. However, the addendum indicates that there may be set-aside requirements or preferences for certain types of vendors or business entities. Additional details regarding the incumbent contractor, if any, or the current environment are not included in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid closing date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Groundwater Protection Plan
(GPP)
Permit Number: Pending
WVDEP Office of Abandoned Mine Lands Kuhns Run Park Portals
Marion County, West Virginia
November 2023
APPROVED: ____________________________________________
| Richard | Hovatter, | P.E. | – | Project | Manager |
| The | Thrasher | Group, | Inc. |
DATE: November 2023
ATTACHMENT A
rhovatter Pen Bodysuits rhovatter rhovatter Pen parks, (30/23
Site Specific Groundwater Protection Plan (GPP) For
WVDEP Office of Abandoned Mine Lands Marion County, West Virginia
SECTION A: GENERAL INFORMATION
PROJECT NAME:
PROJECT LOCATION:
Kuhns Run Park Portals
Approximately 2 miles Southeast of Worthington, WV. Situated along
Kuhns Run Road.
N 39.430741 W 80.241582
GPP DEVELOPER: The Thrasher Group, Inc.
600 White Oaks Blvd Bridgeport, WV 26330 1‐800‐273‐6541
RESPONSIBLE PERSON: WVDEP Office of Abandoned Mine Lands Attention: Troy Schell
DESCRIPTION: This project covers the reclamation of an abandoned mine land
SECTION B: ACTIVITIES THAT HAVE THE POTENTIAL TO POLLUTE GROUNDWATER
The WVDEP Office of Abandoned Mine Lands Kuhns Run Park Portals project will involve construction activities that may reasonably be expected to contaminate the groundwater.
The project consists of the installation of a modified wet mine seal, existing slip repair reclamation, subsidence depression repairs, minor grading improvements, minimal usage of an existing access roads, underdrains, curtain drains, channels, culverts, and perimeter control measures. During construction, possible contaminates include diesel fuel, hydraulic oil, and antifreeze, all being components of machinery on site. Vehicles may also leak motor oil, unleaded gasoline, antifreeze, and transmission fluid. Common de‐icing chemicals may be used during the winter months.
SECTION C: PRACTICES SELECTED TO PROTECT GROUNDWATER FROM POLLUTION
Necessary actions will be taken in order to avoid spills during construction. The contractor and contractor employees will have the necessary absorbents and/or barriers on hand to secure any of the possible contaminates in the event of a spill. Federal, state, and local rules and regulations will be followed in the disposal of any captured spills. Silt Fence as perimeter controls will be utilized. Best management practices (BMPs) will be utilized on‐site and maintained during construction as indicated on the Erosion and Sediment Control Plans.
Spill Prevention and Control:
It shall be the responsibility of WVDEP Office of Abandoned Mine Lands the contractor, and contractor employees to structure their operations in a manner that reduces the risk of spills or accidental exposure of fuels or hazardous materials to the environment. Particular care should be taken when working within or near water bodies or wetlands. At a minimum, WVDEP Office of Abandoned Mine Lands and its contractors shall:
Ensure that employees handling fuels and other hazardous materials are properly trained.
Ensure that equipment is in good operating order and inspected on a regular basis.
Ensure that fuel trucks transporting fuel to on‐site equipment travel only on approved access roads.
Ensure that equipment is parked overnight and/or fueled at least 100 feet from a water body or wetland boundary.
Ensure that hazardous materials, including chemicals, fuels, hydraulic fluids, and lubricating oils, are stored at least 100 feet from a water body or wetland boundary and placed inside of secondary containment.
Secondary containment shall be provided for chemical and fuel storage and stationary equipment such as pumps and generators used in proximity of water bodies and wetlands.
WVDEP Office of Abandoned Mine Lands, the contractor, and contractor employees will structure their operations in a manner that provides for the prompt and effective clean‐up of released fuel or other hazardous material. At a minimum WVDEP Office of Abandoned Mine Lands, the contractor, and contractor employees shall:
Ensure that personnel on‐site know the proper procedure for reporting spills.
Ensure that each construction crew has on hand sufficient supplies of absorbent and barrier materials to allow the rapid containment and recovery of spilled materials.
Ensure that each construction crew has on hand sufficient tools and material to stop leaks.
SECTION D: IMPLENTATION SCHEDULE
The GPP must be implemented upon approval. Having a GPP on file in an office somewhere does not keep a facility in compliance with WV0115924. The GPP must be retained and implemented at the site for which it was developed.
List the procedures to be used when designing and adding new equipment or operations.
N/A
The permittee must revise the GPP within 30 calendar days to address any newly delineated areas or other vulnerable areas upon notification by the Director or the Bureau for Public
Health.
SECTION E: EMPLOYEE TRAINING
Provisions for employees to be instructed and trained on their responsibility to ensure groundwater protection. Job procedures shall provide direction on how to prevent groundwater contamination.
The appropriate personnel will be trained quarterly to ensure groundwater protection. Job procedures will provide direction on how to prevent groundwater contamination through proper work practices.
The training will include:
A summary of 47‐CSR‐58, the Groundwater Protection Rule.
Knowledge of groundwater protection structures, secondary containment units, and spill cleanup equipment.
A summary of likely potential groundwater contaminants at this development.
Spill notification and documentation procedures.
SECTION F: INSPECTION SCHEDULE
Included are provisions for inspections of Groundwater Protection Plan (GPP) elements and equipment.
Inspections must be made a minimum of every three months.
Inspections of the GPP elements and equipment will occur quarterly (every three months) during the life of the construction. Inspections will ensure elements and equipment of the site’s groundwater protection program are in place, properly functioning, and appropriately managed. The inspections will be recorded, and the information saved in order to verify the inspections.
SECTION G: WASTE MATERIAL
A statement that no waste material will be used for de‐icing or fill material on the property unless authorized by another rule.
No waste material will be used as fill and/or de‐icing material, unless authorized by a different rule.
Common de‐icing and or traction material may be used by the West Virginia Department of Transportation
(WVDOT) near the site.
SECTION H: SAFETY DATA SHEETS
A statement that Material Data Sheets or Safety Data Sheets shall be provided for all chemicals, or substances, used or stored on site.
Material Data Sheets or Safety Data Sheets shall be provided and be made available on‐site for all chemicals and substances in use or stored on‐site.
SECTION I: GROUDWATER DATA
There is currently no known groundwater quality/monitoring data.
SECTION J: KARST MITIGATION PLAN
N/A
SECTION K: CERTIFICATION STATEMENT
The person who can make the managerial and/or financial decisions that are required to implement your plan should be the one signing the certification statement.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Signature (Hand Signed) & Date
Printed Name rhovatter Pen Result rhovatter
1/30/23 Richard Horatian
Storm Water Pollution Prevention Plan
Kuhns Run Portals 11/30/2023 rhovatter rhovatter
Boratian.
Storm Water Pollution Prevention Plan
(SWPPP)
Permit Number: Pending
Prepared For:
WVDEP Office of Abandoned Mine Lands
Development Name & Location:
Kuhns Run Park Portals
MARION
Prepared by:
The Thrasher Group, Inc
Date:
November 2023
This Storm Water Pollution Prevention Plan (SWPPP) is provided by the West Virginia Department of Environmental Protection (WVDEP). Providing this document does not certify that the information is complete or complies with all requirements. The WVDEP claims no responsibility for omissions or inaccuracies in values or information presented to the WVDEP by businesses seeking compliance with state environmental regulations.
SWPPP Revision Documentation Form
This storm water pollution prevention plan (SWPPP) should be revised and updated to address changes in site conditions, new or revised government regulations, and additional on-site storm water pollution controls. The signature of this representative attests that the SWPPP revision information is true and accurate. Previous authors and facility representatives are not responsible for the revisions.
Number
Date
Company Representative’s
Signature
Kuhns Run Portal
CONTENTS
1.0 CONTACT INFORMATION
2.0 OBJECTIVE
3.0 NON-STORM WATER DISCHARGES
4.0 SWP3 REVIEW AND AMENDMENTS
4.1 Review
4.2 Amendments
5.0 SITE OR PROJECT DESCRIPTION
5.1 Description of Construction Activity & Environmental Impacts
5.2 Construction Activity with Potential Pollutant Sources
5.3 Major Activities Schedule
5.4 Property Acreage
5.5 Construction Activity Acreage
5.6 Soil Data
5.7 General Location Map and Site Map
5.8 Erosion and Sediment Control Site Map
5.9 Industrial Discharges
5.10 Receiving Waters
5.11 WVDEP Construction General Permit, WV0115924
5.12 Threatened and/or Endangered Species
5.13 Historical Determination
5.14 Total Maximum Daily Loading (TMDL)
6.0 EROSION AND SEDIMENT CONTROLS
6.1 Short & Long-Term Goals/Criteria
6.2 Best Practicable Technology (BPT)
6.3 Site-specific Erosion and Sediment Controls
7.0 STABILIZATION PRACTICES
7.1 Deadline to Initiate Stabilization Measures
7.2 Deadline to Complete Installation of Stabilization Measures
7.3 Other Deadlines
7.4 Stabilization Records
8.0 STRUCTURAL CONTROLS
8.1 Structural Control Requirements
8.2 Site Structural Controls
9.0 STORM WATER MANAGEMENT
10.0 OTHER CONTROLS
10.1 Other Control Requirements
10.2 Other Controls at the Site
11.0 APPROVED LOCAL PLAN
12.0 MAINTENANCE
13.0 INSPECTIONS OF CONTROLS
14.0 CONTRACTORS AND SUB CONTRACTORS’ RESPONSIBILITIES
15.0 UTILITY COMPANIES
16.0 EMERGENCY NOTIFICATION
17.0 EMPLOYEE TRAINING
APPENDICES
APPENDIX 4.0 (General Permit WV0115924) APPENDIX 5.1 (Project Description) APPENDIX 5.6 (Soil Data) APPENDIX 5.7 (Location Map) APPENDIX 5.8 (E & S Control Map) APPENDIX 6.3 (E & S Control Plan) APPENDIX 7.0 (Revegetation Plan) APPENDIX 7.4 (Stabilization Schedule) APPENDIX 18 (Construction Drawings) APPENDIX 19 (Stormwater Calculations)
1.0. CONTACT INFORMATION
PERMITTEE PHONE/FAX/MOBILE ADDRESS
WVDEP Office of Abandoned Mine Lands ATTN: Troy Schell
(304) 842-1900 101 Cambridge Place Bridgeport, WV 26330
PROJECT CONTRACTOR
To Be Determined (TBD)
TBD TBD
QUALIFIED PERSON/ 24-HOUR
CONTACT
TBD TBD TBD
OTHER
TBD TBD TBD
2.0 OBJECTIVE
A storm water pollution prevention plan must be prepared for storm water discharges that will reach Waters of West Virginia, including discharges to the Municipal Separate Storm Sewer System (MS4), and to identify and address potential sources of pollution that are reasonably expected to affect the quality of discharges from the construction site, including off-site material storage areas, overburden and stockpiles of dirt, borrow areas, equipment staging areas, vehicle repair areas, fueling areas, etc., used by the permitted project. The SWPPP must describe and ensure the implementation of practices that will be used to reduce the pollutants in storm water discharges associated with construction activity at the construction site and assure compliance with the terms and conditions of the general permit.
3.0 Non-Storm Water Discharges
All discharges authorized by this permit shall be composed entirely of storm water.
4.0 SWPPP REVIEW AND AMMENDMENTS
4.1 Review
This SWPPP must be retained on-site at the construction site or, if the site is inactive or does not have an on-site location to store the plan, a notice must be posted describing the location of the SWPPP. This SWPPP must be made readily available at the time of an on-site inspection.
4.2 Amendments
This SWPPP will be revised or updated when the following occurs:
1. Change in design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants and that has not been previously addressed in this SWPPP.
2. Results of inspections or investigations indicating this
SWPPP is proving ineffective in eliminating or significantly minimizing pollutants in discharges authorized under the general permit.
3. To identify any new contractor and/or subcontractor that will implement a measure of the SWPPP.
All other permittees implementing portions of the SWPPP that will be impacted by a change to the SWPPP will be notified of the change in a timely fashion.
The revisions to the SWPPP will be documented on the “SWPPP Revision Documentation Form” found in the front of this document.
The authorized representative with regulatory authority (corporate officer or proprietor) to approve the SWPPP shall sign the modified plan certifying that the SWPPP revision information is true and accurate.
SEE APPENDIX 4.0 (General Permit WV0115924)
5.0 SITE OR PROJECT DESCRIPTION
5.1 Description of Construction Activity & Environmental Impacts
Developer: WVDEP Office of Abandoned Mine Lands
Builder: TBD
Site Location: Approximately 2.0 Miles Southeast of Worthington
Site/Project Description and Mitigation of Potential Environmental
Impacts:
SEE APPENDIX 5.1 (General Description)
5.2 Construction Activity with Potential Pollutants and Sources
The following lists the construction activities or materials that have the potential to contribute pollutants, including sediment, to storm water runoff.
Construction Activity and/or Material
Potential Pollutant
Land clearing Sediment – Total Suspended Solids (TSS), turbidity, oil and grease, Total Petroleum Hydrocarbons (TPH)
Excavation Sediment – TSS, turbidity, oil and grease, TPH
Filling Sediment – TSS, turbidity, oil and grease, TPH
Grading Sediment – TSS, turbidity, oil and grease, TPH
5.3 Major Activities Schedule
The following schedule sheet is an intended schedule or sequence of major activities that will disturb the soil for major portions of the site.
Details are provided as an attachment in Appendix C.
Schedule Sheet for Soil Disturbing Activities
Estimate Construction Start Date: March 2024
Estimate Construction End Date: April 2025
Activity
Estimated Time
Actual Time
Install BMPs
March 2024
Land clearing
June 2024
Grading
September 2024
Excavation
October 2024
Filling
November 2024
Utility Installation
N/A
Install foundations, retaining walls, etc
Paving
Revegetation
April 2025
BMP Removal
TBD
5.4 Property Acreage
The total anticipated area of soils to be disturbed is 9.40 acres.
5.5 Construction Activity Acreage
The total number of acres of construction activities, material storage areas, stockpiles, and borrows areas are listed below:
Activity or Material Acres
Construction Activities (resulting in land disturbance) 9.40 Off-site Material Storage Areas 0 Overburden and Stockpiles of Dirt 0 Borrow Areas 0
5.6 Soil Data
Soil data for each lot is listed on a “Soil Data Sheet”. This information includes pre-construction and post-construction runoff coefficient as well as a description of the soil type.
Soil Data Sheet
Pre-construction runoff coefficient: Low
Post-construction runoff coefficient: Low
Runoff Coefficient:
High: 70-100% impervious (example: asphalt, buildings, paved surfaces) Medium: 40-70% impervious (example: packed soils)
Low: 0-40% impervious (example: grassy areas)
Description of soil:
SEE APPENDIX 5.6 (Soil Data)
5.7 General Location Map and Site Map
SEE APPENDIX 5.7 (Location Map)
5.8 Erosion and Sediment Control Site Map
Site maps shall contain a North arrow with sites oriented to the North, with a minimum of five-foot topographical contours. The maps shall include:
Nearest receiving streams, springs, surface waters to the site;
Limits of all areas to be disturbed (LOD);
Existing roads including public roads from which access to the site will be constructed;
Access roads;
Drainage patterns during and after construction with the outlet markers depicting the storm water discharge points;
Slopes prior to constructions and anticipated conditions after grading activities;
Location of topsoil stockpiles;
Waste areas of 1 acre or greater within or contiguous to the construction site;
Borrow sites of 1 acre or greater within or contiguous to the construction site;
Locations and identification of sediment control structures;
Total acreage and location of impervious areas after construction is complete;
Location of rain gauge provided by the applicant o Or a statement the applicant will obtain the precipitation event information from a National Oceanic Atmospheric Administration (NOAA) weather station that is representative of the location and provide the Station ID Number.
Post-development storm water management structures required by local governments
Final storm water conveyances, including all ditches and pipe systems;
Property boundaries and easements; and A legend, complete with any other information necessary to describe the project in detail.
SEE APPENDIX 5.8 (E & S Control Map)
5.9 Industrial Discharges
This project does not involve discharges associated with industrial activities other than commercial construction activities.
For construction occurring on an industrial site, reference existing multi-sector SWPPP, if applicable.
There are not dedicated concrete, or asphalt plants associated with this project.
There will be no discharge of process wastewater from concrete or asphalt plants. Water from equipment and vehicle washing, wheel washing, concrete and bituminous washout, and washout from paints, oils, and other construction materials is production wastewater and cannot be disposed of on site or discharged without an individual NPDES permit. It must be contained and removed for processing and proper disposal.
5.10 Receiving Waters
The In compliance with the Clean Water Act (CWA), the WVDEP established water quality standards under Title 47CRS2. The water quality standards include designated uses, water quality criteria and anti-degradation policies. To maintain these standards, the WVDEP assigned specific tiers depending on the level of protection needed to maintain water quality and/or existing uses.
Tier 1 Waters – waters that maintains and protects existing uses of water body and the water quality conditions necessary to support such uses.
Tier 2 Waters – waters that maintains and protects “high quality” waters – water bodies where the level of water quality exceeds levels necessary to support recreation and wildlife and the propagation and maintenance of fish and other aquatic life.
Tier 3 Waters – means waters as otherwise identified in 47 CSR2-4.1.c and maintains and protects water quality in outstanding national resource waters.
Below is a list of the receiving waters that receive stormwater discharge from the site:
Kuhns Run – classified as a Tier 1.
5.11 WVDEP Construction General Permit, WV0115924
A copy of the WVDEP Construction General Permit, WV0115924 is included in Appendix 4.0.
5.12 Threatened and/or Endangered Species
To be eligible for coverage under the construction stormwater permit, facilities must provide documentation on whether a listed endangered or threatened species, or critical habitat, are found with the proximity of the project. The facility used The Endangered Species Guidance provided in the Notice of Intent to help determine the status of the site. The species that must be considered in the Parish where this site is located are:
__None_____________________________________________________
A visual inspection of the area indicated (Check One):
No endangered or threatened species and/or critical habitat located within the proximity of the facility.
The following species and/or critical habitat and findings were noted:
NOTE: Include documentation regarding authorization under the Endangered Species Act (ESA), comprehensive site assessments, and/or BMP’s that are protective of listed endangered and threatened species and/or critical habitat, where applicable.
5.13 Historical Determination
The adverse effects on historic properties must be considered before a facility can be covered by the construction general permit. The National Register of Historic Places web site was reviewed and revealed the following (Check One):
None of the listed sites are located in the vicinity of the facility or listed sites will not be affected by the facility.
The following sites are located in the vicinity of the facility (West Virginia State Historic Preservation written agreement included in Appendix A.)
NOTE: Include written agreement with the West Virginia State Historic Preservation Officer (SHPO) that outlines all measures to be undertaken to mitigate or prevent adverse effects to the historic property, where applicable.
5.14 Total Maximum Daily Loading (TMDL)
The WVDEP (Check One)
Currently, there is no TMDL established for the receiving stream that would regulate potential pollutants from the construction site.
The enhanced BMP’s chosen for this site and discussed in this SWPPP are expected to ensure that storm water discharges are protective of water quality standards.
6.0 EROSION AND SEDIMENT CONTROLS
This section includes descriptions of control measures that will be implemented to control pollutants in the storm water discharges. The control measures shall, at a minimum, be designed to effectively minimize the discharge of pollutants by design, installation, and maintenance, in order to meet effluent limitations required by 40 CFR 450.21. These limitations were incorporated into the reissued WV0115924, effective February 10, 2019.
6.1 Short and Long-Term Goals/Criteria
Retain sediment on-site to the extent practicable with consideration for local topography, soil type, and rainfall.
Select, install, and maintain control measures according to the manufacturer or designer’s specifications.
Remove sediment accumulations if sediment escapes the site at a frequency to minimize further negative effects and, whenever feasible, prior to the next storm event.
Remove sediment from sediment traps and sedimentation ponds no later than the time that the wet storage design capacity has been reduced by 50%.
Remove sediment from silt fences, silt socks, and straw wattles before reaching 50% of BMP height (above ground).
Address off-site material storage areas in erosion and sediment control efforts (overburden and dirt stockpiles, borrow areas).
6.2 Best Practicable Technology (BPT)
The chosen controls shall include designs that are effective at minimizing pollutants, and should be installed and maintained to:
Control storm water volume and velocity in ways that minimize soil erosion.
Control storm water runoff during peak flow and total storm runoff volume to minimize channel and stream bank erosion and scour around discharge points.
Minimize exposed soils generated during construction.
Preserve topsoil where feasible.
Minimize disturbance of steep slopes on site.
Minimize sediment discharge with erosion and sediment controls that are designed and installed to address:
o Duration, amount, frequency and intensity of precipitation, o Nature of resulting runoff, o Soil characteristics: range of particle sizes present.
Use natural buffers around waters of the state and direct runoff to these areas, where feasible.
o Discharges to Outstanding Natural Resource Waters and impaired streams must have a 100-foot buffer zone, o Explain alternative practices where site constraints limit buffer zones.
Minimize soil compaction unless dictated by site development Utilize outlet structures that withdraw water from the surface of settling basins or impoundments.
6.3 Site-Specific Erosion and Sediment Controls
The erosion and sediment control methods used are listed in the “Erosion and Sediment Control Plan”. The plan for each lot, where applicable, is found in the “Individual Lot Information” section of the appendix. The sediment controls should address all the requirements in Sections 6.1 and
6.2 of this SWPPP.
SEE APPENDIX 6.3 (E & S Control Plan)
7.0 STABILIZATION PRACTICES
The site stabilization practices described in this SWPPP include temporary and permanent stabilization measures that ensure that disturbed portions of the site are stabilized, and that existing vegetation is preserved when possible. Final stabilization measures may include but are not limited to permanent protection such as pavement, compacted gravel, permeable pavements/pavers, buildings, stable waterways (riprap, concrete, grass or pipe), a healthy, vigorous stand of grass or natural vegetation that uniformly covers at least 70 percent of the ground, stable outlet channels with velocity dissipation that directs site runoff to a natural watercourse, and any other approved structure or material.
SEE APPENDIX 7.0 (Revegetation Plan)
7.1 Deadline to Initiate Stabilization Measures
The types of activities that constitute the initiation of stabilization include, but are not limited to:
Prepping soil for vegetative or non-vegetative stabilization Applying mulch or other non-vegetative product Seeding or planting Starting stabilization practices on a porting of the area to be stabilized Finalizing arrangements to have stabilization product fully installed.
Except as noted below, stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 4 days after the construction activity in that portion of the site has permanently ceased or 4 days for sites required to use enhanced BMP’s.
Where the initiation of stabilization measures by the 4th day, as applicable after construction activity temporarily or permanently ceases is precluded by natural causes, stabilization measures shall be initiated as soon as conditions allow.
Where construction activity will resume on a portion of the site within 14 days from when activities ceased, (i.e., the total time period that construction activity is temporarily halted is less than 14 days) then stabilization measures do not have to be initiated on that portion of the site by the fourth day after construction activities have temporarily ceased.
Areas where the seed has failed to germinate adequately (uniform perennial vegetative cover with a density of 70%) within 30 days after seeding and mulching must be reseeded immediately, or as soon as weather conditions allow.
7.2 Deadline to Complete Installation of Stabilization Measures
As soon as practicable, but no later than 4 days after initiation of soil stabilization measures, the site will have completed:
Vegetative Stabilization – initial seeding or planting, and/or Non-Vegetative – installation or application of stabilization measures.
With extenuating circumstances like frozen conditions, stabilization measures will be completed as soon as practicable. Routine inspections will be continued until final stabilization requirements are met.
7.3 Other Deadlines
Where the site is affected by circumstances beyond the control of the Stormwater Permittee, and vegetative stabilization measures are proposed, the following deadlines apply:
Immediately initiate, and within 4 days complete installation of temporary non-vegetative measures to prevent erosion.
As soon as conditions allow, the activities required to plant and initially establish vegetation will proceed.
The circumstances that led to the inability to complete the deadlines outlined in sections 7.1 and 7.2 of this SWPPP will be documented, with the outline of a schedule for initiating and completing stabilization.
7.4 Stabilization Records
The stabilization practices implemented will be recorded on the “Stabilization Practice Schedule” found in the appendix. If construction activities temporarily or permanently cease, then it will be noted in the Stabilization Practice Schedule.
Stabilization Practice Schedule
Address: WVDEP Office of Abandoned Mine Lands
Stabilization Practices
Location Time Frame*
* Time Frame: Includes dates of major grading activities, dates when construction activities temporarily or permanently cease on a portion of the site, and dates when stabilization measures are initiated.
SEE APPENDIX 7.4 (Stabilization Schedule)
8.0 STRUCTURAL CONTROLS
8.1 Structural Control Requirements
Sediment traps and sediment basins may be used to control solids in storm water runoff for drainage locations serving less than ten (10) acres.
Sediment basins must utilize outlet structures that release water from the surface, unless infeasible.
At a minimum, super silt fence, belted reinforced silt fence, standard silt fences, 12” silt socks, or equivalent sediment controls are required for all down slope boundaries (and for those side slope boundaries deemed appropriate as dictated by individual site conditions) of the construction.
8.2 Site Structural Controls
The structural controls used on each lot are listed on the Structural Controls Sheet included in the Site Information Section of the appendix. These controls are used to divert flows away from exposed soils, to limit the contact of runoff with disturbed areas, or to lessen the off-site transport of eroded soils.
Structural Control Sheet
Address: WVDEP Office of Abandoned Mine Lands
Structural Control Selected
Rational
9.0 STORM WATER MANAGEMENT
If any permanent storm water controls (e.g. detention ponds, catch basin filter inserts, etc.) or velocity dissipation devices are installed during the construction process to control pollutants in storm water discharges and will remain in place after the completion of construction operations will be noted on the Structural Control Sheet found in the Site Information section of the appendix.
10.0 OTHER CONTROLS
10.1 Other Control Requirements
To minimize off-site tracking of sediments and generation of dust, typical controls may include stabilized construction entrances, shoveling and sweeping, watering for dust control, etc.
All construction and waste materials that pose a potential pollutant source to the storm water runoff from the construction site will be stored in such a manner so as to prevent or minimize storm water contact.
To demonstrate that all applicable state and local regulations governing waste disposal, sanitary sewer or septic systems are being obeyed, the following practices are in place:
The site will have the typical waste lumber, insulation, sheetrock, roofing, used paint supplies, etc. commonly found on a construction site. Either a roll off dumpster or wire fence containment will be provided for storing trash and rubbish until it can be properly disposed of. The dumpster or fence containment will be covered when not in use to prevent storm water from coming into contact with the trash and rubbish.
Any concrete or asphalt plants associated with the project will be permitted and operated under their appropriate stormwater pollution prevention control plans.
Any controls required for endangered or threatened species or their habitat, and/or those required by the State Historic Preservation Officer (SHPO) will be installed properly and maintained accordingly.
10.2 Other Controls at the Site:
If any other controls will be used, it will be described on the Other Control Sheet found in the Site Information in the appendix. For complex sites with more comprehensive controls, details are included in Appendix C.
Other Controls Sheet
Controls
Rationale
11.0 APPROVED LOCAL PLAN
The local requirements for an Erosion and Sediment Control Plan may or may not be met by the information contained in this SWPPP.
Additional information may be requested to fully comply with these local requirements.
12.0 MAINTENANCE
All erosion and sediment control measures and other protective measures identified in this SWPPP must be maintained in effective operating condition. If through inspections the permittee determines that BMPs are not operating effectively, maintenance must be performed within 24 hours.
for active construction sites and before the next anticipated storm event to maintain the continued effectiveness of storm water controls. If maintenance prior to the next anticipated storm event is impracticable, maintenance must be scheduled and accomplished as soon as practicable. Erosion and sediment controls that have been intentionally.
disabled, run over, removed, or otherwise rendered ineffective must be replaced or corrected immediately upon discovery.
Repairs or maintenance to BMPs shall be performed as soon as practicable after the inspection following the 0.25-inch rain event in a 24-hour period, and repairs shall be re-inspected no later than the next inspection date. If repairs cannot be completed within that 4- day period, that fact shall be explained on the inspection report and such explanation shall include an anticipated completion date.
13.0 INSPECTIONS OF CONTROLS
The permittee shall ensure site inspections are conducted by a Qualified Person in accordance with this section. The purpose of the inspection is to ensure compliance with the approved plan, and when the approved plan is not effective at protecting water quality, the inspection is to document that plan improvements are needed.
The person(s) inspecting the site may be a staff person or a third party hired to conduct such inspections as long as they meet the definition of a Qualified Person.
The site must be inspected as listed below, unless the site discharges to sensitive waters or the site qualifies for a reduction in the inspection frequency.
At least once every four (4) calendar days and Within 24 hours of the occurrence of a precipitation event of 0.25 inches or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge.
Reductions in inspection frequency may occur in accordance with the following:
Stabilized areas:
The permittee may reduce the frequency of inspections to twice per month, no more than 14 calendar days apart, in any area of the site where final stabilization has been completed. If construction activity resumes in this portion of the site at a later date, the inspection frequency immediately increases to that required previous to the reduced frequency. The beginning and ending dates of this period must be recorded in the inspection report.
Exceptions:
For “linear projects”, where disturbed portions have undergone final stabilization at the same time active construction continues elsewhere, the permittee may reduce the frequency of inspections to twice per month no more than 14 calendar days apart, in any area of the site where the final stabilization has been completed. Inspect once more within 24 hours of the occurrence of a precipitation event of 0.25 inches or greater. If there are no issues or evidence of stabilization problems, further inspections may be suspended. If “wash-out” of stabilization materials and/or sediment is observed, following re-stabilization, the reduced inspection frequency is suspended. Inspections must continue until final stabilization is visually confirmed following a precipitation event of 0.25 inches or greater.
Frozen conditions:
If the permittee suspends construction activities due to frozen conditions, inspections on the site may be temporarily suspended until thawing conditions begin to occur if:
Runoff is unlikely due to continuous frozen conditions that are likely to continue at the site for at least three (3) months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, the permittee must immediately resume the regular inspection frequency as applicable;
Land disturbances have been suspended and all disturbed areas of the site have been stabilized.
If still conducting construction activities during frozen conditions, the permittee may reduce the inspection frequency to once per month if:
Runoff is unlikely due to continuous frozen conditions that are likely to continue at the site for at least three (3) months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, the permittee must immediately resume the regular inspection frequency; and
Except for areas undergoing construction activities, disturbed areas of the site have been stabilized, the beginning and ending dates of this period must be documented in the inspection report.
14.0 CONTRACTORS AND SUBCONTRACTORS’ RESPONSIBILITY
Each control measure implemented on site is identified along with the person responsible for implementing that measure in the Erosion and Sediment Control Plan found in the “Site Information” section of the appendix.
A list of contractors and subcontractors and the control measures their operations impact is listed in the “Site Information” section of the appendix. If the contractor is unknown at this time, this requirement may be waived.
All contractors and subcontractors working at the site are informed of the terms and conditions of the SWPPP and their obligation to follow the plan. In doing so, they agree not to perform their operations counter to the plan without first contacting the Permittee in order that the necessary adjustments to the SWPPP plan can be made to assure that pollutants are not discharged from the site in the storm water runoff.
15.0 UTILITY COMPANIES
Each control measure relating to the installation of utility service, is listed in the “Erosion and Sediment Control Plan” found in the “Site Information” section in the appendix.
16.0 EMERGENCY NOTIFICATION
In the event of an unauthorized discharge that causes an emergency condition, the operator shall notify the hotline (WVDEP24-hour Elkview Emergency Response Unit) by telephone at 1-(304) 558-5938 or 1-(800) 642-3074 and the National Response Center at 1-(800)-424-8802 no later than one hour after learning of the discharge. Notification will be made regardless of the amount of the discharge. A written notification shall be provided within five (5) calendar days after the telephone notification, in accordance with the general permit requirements. The written submission shall contain a description of the noncompliance and its cause; the period of noncompliance, including exact dates and time, and if, the noncompliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the noncompliance.
17. EMPLOYEE TRAINING
Describe an employee training program for all on-site personnel directly involved with construction activities at all levels of responsibility that reiterates the components and goal of the SWPPP.
Training should address topics such as spill and leak response and internal reporting, good housekeeping, and routine inspection and maintenance.
Training shall be on a quarterly basis while construction activities are occurring.
A list of attendees and topics covered at each training session shall be documented and maintained in the SWPPP.
18. CONSTRUCTION DRAWINGS
SEE APPENDIX 18
19. STORMWATER CALCULATIONS
SEE APPENDIX 19
APPENDIX 4.0
General Permit WV0115924 aep
STATE OF WEST VIRGINIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
DIVISION OF WATER AND WASTE MANAGEMENT
601 57th STREET SE
CHARLESTON, WV 25304-2345
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
WATER POLLUTION CONTROL PERMIT
Permit No. WVO 115924 Issue Date: January 10, 2019 Effective Date: February 9, 2019 Expiration Date: February 9, 2024
Subject: Stormwater Associated with Construction Activities
To Whom It May Concern:
This is to certify that any establishment with discharges composed entirely of stormwater associated with construction activities disturbing one acre or greater ofland area which may be regulated under the terms and conditions of this general permit, has satisfied the registration requirements, and which has not been required by the Director of the Division of Water and Waste Management to apply for an individual permit, is hereby eligible to allow stormwater discharges into the surface waters of the State under this General WV /NPDES Water Pollution Control Permit. Authorization to discharge under this permit must be provided by the Director.
Construction activities are land disturbing operations such as clearing, grubbing, grading, filling and excavation operations during site development for residential, commercial or industrial purposes. The following are not eligible for coverage under this NPDES General Permit:
1. Operations that result in the disturbance of less than one acre of total land area, which are not part of a larger common plan of development or sale.
2. Stormwater discharges associated with land disturbing activities that may reasonably be expected to be causing or contributing to a violation of a water quality standard as determined by the Director.
Permit No. WVOl 15924
3. Land disturbance activities already governed by other Department of Environmental Protection NPDES permits. This includes Division of Mining and Reclamation permits for coal mining and non-metallic quarries.
4. Landfills, except in the preparation of a new landfill and/or clay borrow areas.
5. Other activities exempt from NPDES permitting requirements as set forth in 40
C.F.R. 122.3 and 47 C.S.R. 10-3.2.b.4 (NPDES Program).
6. Land disturbing activities related to oil and gas activities as required by the Energy
Policy Act of 2005. These activities include but are not limited to construction of drilling sites, waste management pits, and access roads, as well as construction of the transportation and treatment infrastructure such as pipelines, natural gas treatment plants, natural gas pipeline compressor stations, and crude oil pumping stations.
7. Construction activities that result in a discharge of a reportable quantity release or that contribute pollutants ( other than non-contaminated sediments) to a violation of a water quality standard are still subject to permit coverage.
This General WV /NPDES Water Pollution Control Permit is to allow stormwater discharges into the surface waters of the State while protecting water quality and is subject to the following terms and conditions:
The information submitted on and with the application form will hereby be made terms and conditions of the General Permit with like effect as if all such information were set forth herein, and other pertinent conditions set forth in Parts I, II, III, and IV and appendices A, B, and C.
Site Registration Applications approved from February 9, 2018 through February 9, 2019 must file the Notice of Termination for completed projects where all disturbed lands have been permanently stabilized, or, a signed certification of agreement to abide by the terms and conditions of this reissued General Permit within 90 days of the effective date. Additional application fees do not apply to the certification; however, annual fees still apply. Where any incomplete projects have disturbed lands that have not been permanently stabilized, status maps are required with the certification. The map may be in PDF format and is not required to conform to the specifications ofll.H.1.a. The status map shall show disturbed areas and the Limits of Disturbance (LOD), which is the area approved under the registration for land disturbance. Projects that have not disturbed any lands are not required to provide the status map. Additionally, the certification will contain an updated timeline for major activities as required by Part II.H.1.
Existing registrations under the Notice of Intent approved from February 9, 2018 through February 9, 2019 shall submit the Notice of Termination if all disturbed lands are permanently stabilized. If construction is not complete and all disturbed lands are not permanently stabilized, such projects may retain permit coverage through the expiration date of this General Permit by submittal of the certification described above within 90 days of the effective date of this reissued General Permit.
Projects discharging to Waters of the State with an approved sediment-related Total Maximum Daily Load (TMDL) with registrations that were approved for one year only with approval dates from February 9, 2018 through February 9, 2019 that have not completed construction and stabilized disturbed areas at the effective date of this permit are required to submit the above described certification. Such projects shall agree to implement Enhanced best management practices (BMP's ). Submittal of the certification will remove the I-year time constraint and the registration will be valid until the expiration of this reissued General Permit unless site stabilization and termination of the registration occur first. Projects required to submit Discharge Monitoring Reports under the 2012 permit with approval dates from February 9, 2018 through February 9, 2019 must submit the above described certification agreeing to implement Enhanced BMPs within 90 days of the effective date of this General Permit, which has eliminated monitoring.
All projects approved under the 2012 permit's Site Registration Application or Notice of Intent with an approval date prior to February 9, 2018 must submit the Notice of Termination if all disturbed areas are permanently stabilized. All other projects that have not been stabilized shall submit an application for continuing coverage within 90 days of the effective date of this General Permit.
Compliance with other laws and statutes
Nothing in this General Permit shall be construed as relieving the permittee from compliance with any applicable federal, state, or local statutes, ordinances, or regulations.
Continuation of this general permit
If this general permit is not reissued or replaced prior to the expiration date, it will be administratively continued in accordance with 47 C.S.R. 10 and remain in force and effect. If you were authorized to discharge under this general permit prior to the expiration date, any discharges authorized under this permit will automatically remain covered by this general permit until the earliest of:
• Your authorization for coverage under a reissued general permit or a replacement of this general permit following your timely and appropriate submittal of a complete application requesting authorization to discharge under the new general permit and compliance with the requirements of the new permit; or
• Your submittal of notification of termination that the facility has ceased operations;
or
• Issuance or denial of an individual permit for the facility's discharge; or
• A formal permit decision by DWWM not to reissue this general permit, at which time DWWM will identify a reasonable time period of covered dischargers to seek coverage under an alternative general permit or individual permit. Coverage under this permit will cease at the end of this time period.
PART I. INTRODUCTION
I.A. TERMS OF PERMIT
LB. COMPLIANCE REQUIREMENT
J.C. WATERQUALITY
I.D. REQUIRED REPORTING
I.E. DIRECTOR'S AUTHORITY TO REQUIRE OTHER PERMITS
I.F. ALLOWABLE DISCHARGES
I.G. PROHIBITED DISCHARGES
PART II PRE-CONSTRUCTION REQUIREMENTS
II.A. APPLICATIONS
II.B. POSTING SIGN OR NOTICE
II.C. INCOMPLETE OR INCORRECT APPLICATIONS
II.D. PUBLIC NOTICING OF APPLICATIONS
ILE. AUTHORIZATION TO DISCHARGE
II.F. INSTALLATION OF EROSION AND SEDIMENT CONTROLS
ILG. QUALIFIED PERSON TO INSPECT EROSION AND SEDIMENT
CONTROLS
II.H. STORMW ATER POLLUTION PREVENTION PLAN (SWPPP)
COMPONENTS
II.I. GROUNDWATER PROTECTION PLAN (GPP)
II.J. CONSISTENCY WITH OTHER PLANS
PART III. REQUIREMENTS DURING CONSTRUCTION
III.A. COMPLY WITH APPROVED PLAN
III.B. INSPECTIONS BY QUALIFIED PERSON
III.C. IMPLEMENT ADDITIONAL BMPS TO PROTECT WATER QUALITY
III.D. FEES
PART IV. REQUIREMENTS AFTER CONSTRUCTION
IV.A. VERIFY ALL DISTURBED AREAS ARE STABILIZED ......... ·
IV.B. RECORDS INSPECTIONS
IV.C. PREPARE FOR TERMINATION
IV.D. TERMINATION OF COVERAGE
Director's Signature Page Appendix A
Appendix B
Appendix C
PART I. INTRODUCTION
I.A. TERMS OF PERMIT
Discharges from sites covered under this General Permit shall not cause or contribute to a violation of 47 C.S.R. 2 (Requirements Governing Water Quality Standards) or 47 C.S.R.
12, (Requirements Governing Groundwater Standards) of the West Virginia Legislative Rules pursuant to Chapter 22, Article 11 and Article 12. Discharges that are not in compliance with these standards are not authorized.
LB. COMPLIANCE REQUIREMENT
Compliance with this General Permit, the approved Stormwater Pollution Prevention Plan and the Groundwater Protection Plan is required upon the beginning of the construction project.
LC. WATER QUALITY
Subject to 47 WV C.S.R.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .