This document is an addendum to an Invitation to Bid (ITB) issued by St. Mary's County Public Schools (SMCPS) for the refurbishment of the wood gymnasium floor at Leonardtown High School. The addendum provides revised specifications for the wood floor refinishing work, including changes to the scope of work, pricing, and delivery requirements. The ITB was originally issued under #SMCPS-2020-M-GFLHS, with an eMMA solicitation number of BPM019428. The sealed bids are due on May 21, 2020 at 3:00 pm local time. The resulting contract will be awarded for a period of 35 days, with all work required to be completed by August 21, 2020.
The lump sum bid price shall include all labor, supplies, materials, equipment, disposal, and parts required to perform the specified services. Contractors may submit bids for the full scope of work or exclude the "5 dots (typ. of 20)" and "Numbers 130 (typ. of 4)" items. Hourly labor rates and material markup percentages are required for any approved change orders. SMCPS reserves the right to award the requirements of this bid in total or in part as is determined to be in the best interest of SMCPS, and to make multiple awards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB - LHS Gym Floor Refurbishment.pdf | ||
| Addendum 2 - Gym Floor at LHS.pdf | ||
| Attachment B Drawing.pdf | ||
| Attachment A Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
St. Mary’s County Public Schools 23160 Moakley Street, Suite 107 Leonardtown, Maryland 20650
ADDENDUM NO. 1
Addendum Date: May 12, 2020
ITB Name/Number: Department of Maintenance – Refurbishment of Gym
Floor at Leonardtown High School
ITB #SMCPS-2020-M-GFLHS
eMMA Solicitation No.: BPM019428
ITB Due Date/Time: May 21, 2020 at 3:00 p.m. local time
This addendum consists of nine (9) pages, including this signature acknowledgment sheet and two (2) attachments, for a total of 9 pages. Please incorporate the attached information in your proposal response.
This addendum cover page must be signed and returned with your proposal before the closing date and time shown above. Failure to fully execute all ITB documents may be cause for rejection of your proposal.
St. Mary’s County Public Schools (SMCPS) reserves the right to reject any or all offers and to accept the offer that is in the best interest of SMCPS.
Except as modified herein, all other terms and conditions of Invitation to Bid #SMCPS-2020-M-GFLHS shall remain in full force and effect.
Brynn Cosner Date Procurement Coordinator
ACKNOWLEDGMENT OF RECEIPT
COMPANY
NAME:__________________________________________________________
AUTHORIZED SIGNATURE: ________________________________________
Date
NAME AND TITLE: ________________________________________________
TELEPHONE NUMBER: (__________)_________________________________
5/12/20
ADDENDUM NO. I
Department of Maintenance
Refurbishment of Gym Floor at Leonardtown High School
ITB #SMCPS-2020-M-GFLHS
By order of this Addendum, the following information is added to ITB #SMCPS-
2020-M-GFLHS:
Changes
C1. Please see the attached revision to Attachment 4, Specifications, Pricing and Delivery Information Sheet. Vendors should submit the revised Attachment 4 with their bid response.
C2. Changes to Specifications:
09 6000 WOOD FLOOR REFINISHING: REPLACE Entire section with the attached revised 09 6000 WOOD FLOOR REFINISHING. See attached.
Questions and Answers
None.
ATTACHMENT 4 REVISED
SPECIFICATIONS, PRICING AND DELIVERY INFORMATION SHEET
ITB # SMCPS‐2020‐M‐GFLHS – GYM FLOOR REFURBISHMENT (LHS)
PURPOSE: The Board of Education of St. Mary’s County on behalf of St. Mary’s County Public Schools (SMCPS) is requesting sealed bids from experienced and qualified Contractors to perform refurbishment of a wooden gymnasium floor at Leonardtown High School (23995 Point Lookout Rd, Leonardtown MD 20650). SMCPS reserves the right to award the requirements of this bid in total or in part as is determined to be in the best interest of SMCPS. SMCPS reserves the right to make multiple awards. The resulting contract will be awarded for a period of 35 days, with all work being completed by August 21, 2020.
NOTES: Contractor shall perform services as detailed in Section VI “Specifications” and Attachment A (Specifications) and Attachment B (Drawing). The lump sum bid total entered below shall include all labor, supplies, materials, equipment, disposal and parts required to perform those services in accordance with the specifications.
Gym Floor Refurbishment – Leonardtown High School
Item Number
Description Lump Sum Bid
1 To perform the refurbishment of the wood gym floor at Leonardtown High School as specified in ITB #SMCPS‐2020‐M‐GFLHS.
2 To perform the refurbishment of the wood gym floor at Leonardtown High School as specified in ITB # SMCPS‐2020‐M‐ GFLHS, excluding the "5 dots (typ. of 20)" and "Numbers 1‐30 (typ.
of 4)".
Please state warranty period for material to be installed: _____________________________________________
Additional Work:
Services, repairs, materials and/or parts performed and/or supplied outside the scope of work and specifications must have the prior written approval of SMCPS to qualify as an extra cost item. The Contractor shall be paid only for work that is authorized and accepted by SMCPS as satisfactorily completed.
Hourly labor rate for approved change orders only: $__________/hour Mark‐up % for additional materials required: _________%
Hourly rates offered by Contractor shall be fixed rates for service throughout the entire term of the contract.
AUTHORIZED SIGNATURE, TITLE AND DATE
Bid price shall be valid for ninety (90) days after bid opening date. All bids shall include F.O.B. destination.
09 6000
WOOD FLOOR REFINISHING
ADDENDUM #1 – 12 MAY 20
TCA LEONARDTOWN HIGH SCHOOL
1.00 GENERAL
1.01 Scope
Work includes all labor, materials, equipment, and services required for the refinishing of the existing wood floor in the main Gymnasium. All areas of existing wood floor in the main Gymnasium shall be sanded and refinished in accordance with this section.
1.02 Submittals
A. Descriptive literature: Submit copies of manufacturer's descriptive literature and recommended installation procedures for wood flooring system including all components and materials specified and required.
B. Samples: Submit samples of the sealer, all paint colors, and finish on the removed portions of the existing gym floor and of the vented rubber base. If a piece of the removed flooring is not available, the contractor shall seal, paint and finish an area of the floor approximately 3’x3’ for review before proceeding. Paint samples shall be on actual flooring, not printed reproductions.
C. Shop drawing: Submit copies of floor layout of all game lines in Gymnasium for approval. Shop drawing shall include all dimensions and colors.
D. Gymnasium floor logo: Submit graphic logo, lettering and graphic for Architect and Owner review.
The lettering shall match the architectural drawing. The graphic logo shall be provided to the contractor by the Owner.
E. Maintenance and repair data: Submit copies of maintenance and repair instructions for Owner's maintenance manuals.
1.03 Qualifications of installers
Installer shall furnish Architect with evidence that they are experienced and expert at the installation of the specified wood flooring products and shall be approved by the manufacturer.
1.04 Warranty
Furnish manufacturer's warranty against defects in materials and workmanship for a period of one year from date of substantial completion of the project.
1.05 Job conditions
A. Permanent heat, light, air conditioning and ventilation shall be installed and be operational during and after installation.
B. After floors are finished secure area to allow cure time for finish.
1.06 Delivery, storage and handling
A. Room temperature shall be 55-80ºF and relative humidity of 35-50% are to be maintained during and after installation.
2 09 6000
LEONARDTOWN HIGH SCHOOL TCA
B. Materials shall not be stored at the installation location if the above conditions cannot be met or maintained thereafter.
1.07 Material standards
A. Wood flooring system shall meet Maple Flooring Manufacturers Association (MFMA) specifications for maple, beech and birch flooring with respect to materials, design, fabrication, testing, performance, and installation.
B. All hard maple flooring grades shall be certified by the MFMA. Each piece shall be indented on back with MFMA trademark and each bundle shall be clearly marked with MFMA grade.
C. All wood shall be certified to be in compliance with the standards endorsed by the Forest
Stewardship Council (FSC). Provide all documentation that demonstrates that all the submitted wood products are FSC certified as defined in the LEED for Schools Reference Guide.
1.08 Replacement
For bidding purposes, work shall include the replacement of 150 SF of wood flooring system, comprised of up to three [3] separate areas. Types of damage may include [but shall not be limited to]: “dead” spots, water damage, and surface irregularities. Locations of damaged areas will be identified and located by the Contractor and confirmed by the Architect and Owner prior to the start of refinishing operations.
2.00 PRODUCTS
2.01 Gymnasium wood flooring system
Patch and repair areas of existing wood floor with a new wood floor component system comprised of materials that are compatible with the existing flooring and provides a smooth and level floor surface when completed.
A. Vented rubber base
Provide new vented rubber base throughout Gymnasium. Base shall be 4”H x 3”W Furnish base with matching outside corners as required by layout. Color of base shall be black.
B. Finishing materials
1. Sealer and finish coats:
a. Sealer coats: Water-based wood sealer, fast-drying, low odor, VOC less than
275 g/L, light in color, minimizes sidebonding. Provide SuperSport Seal by Bona, Hydroline Sealer by Basic Coatings, Court Guard by Hillyard, Sport Tone by Advantage Coatings Technologies, or approved equal.
b. Finish coats: Two-Component, high solids, water-based wood floor coating, fast-drying, VOC less than 275 g/L, very light in color, high gloss, and low odor. Provide SuperSport HD by Bona, StreetShoe NXT or GymShoe by Basic
Coatings, Trophy H2O by Hillyard, Defense by Advantage Coatings
Technologies, or approved equal.
2. The game line paint and logo paint shall be water based, high gloss, highly adhesive and compatible with the sealer and finish coats. Colors for the game lines shall be as selected by the Architect from manufacturer’s range of both standard and custom colors not less than ten (10) colors.
C. Floor repair components:
1. Wood strip flooring shall be second and better grade hard maple complying with Maple
Flooring Manufacturers Association [MFMA] grading rules. Thickness, face width and tongue and groove configuration shall match existing flooring and may require custom milling of solid maple stock in order to achieve the required profile. Flooring shall be furnished with continuous tongue and groove edges, end matched, and kiln dried per MFMA grading rules. Flooring may require a stain in order to match existing floor.
Samples to be produced for evaluation prior to start of work.
2. Other system components such as steel channels, wood sleepers, plywood substrate, anchors and underlayment/moisture proofing, shall all comply with floor system manufacturer and shall match existing floor system components.
3.00 EXECUTION
3.01 Product handling
A. Protection
1. The existing Gymnasium wood flooring system shall be protected from all unnecessary foot traffic, high humidity, direct moisture, and other conditions that may prove to be damaging to the final refinished wood floor system.
2. Protect new wood flooring system from damage and moisture during transit, delivery, and storage. Do not deliver flooring until all permanent heating and ventilating system is operational.
B. Storage
Flooring shall be stored in a dry, well-ventilated area, not in contact with masonry or concrete, to acclimate to building conditions. Allow flooring material to remain in area installation for one week prior to installation. Room conditions during this period shall approximate those during occupancy.
3.02 Substrate and environmental conditions
The Contractor shall notify Architect of any conditions preventing satisfactory installation of wood flooring system. By beginning work the installer acknowledges that existing conditions, as listed below, are satisfactory.
4 09 6000
A. Dryness
The building shall be dry and closed-in. Maintenance of proper temperature and relative humidity shall be the responsibility of the Contractor using heating, ventilation, and air conditioning as required.
B. Moisture content of flooring
New and existing wood flooring shall test at an average of 8% moisture content prior to repairs or refinishing.
3.03 Installation
A. Wood flooring and vented rubber base shall be installed in accordance with flooring manufacturer's approved instructions and recommendations for the application indicated but not less than MFMA and WSFI standards.
B. Install vented rubber base in accordance with manufacturer's recommendations. Miter inside corners as required and provide remanufactured one-piece outside corners. Bond sections of base together so that completed installation forms a monolithic base free of gaps and loose sections.
3.04 Replacement
A. Existing areas of flooring to be replaced will be marked and confirmed by the Contractor prior to start of any floor refinishing or actual replacement work. Areas shall be dimensionally located on a plan and submitted for review by the Architect.
B. Areas marked for replacement shall be carefully removed so that no damage is made to adjacent floor areas that are to remain. Attention shall given existing tongue and groove edges of adjacent wood flooring members so they are not damaged during removal process.
C. Existing moisture barrier shall be left in place and restored as necessary.
D. Install new wood flooring in accordance with floor system manufacturer’s instructions and approved submittals, followed by necessary game stripping, sealing, sanding and finishing.
3.05 Finishing
A. Environmental Conditions
Follow the sealer and finish manufacturer’s instructions regarding operation and temporary shut-down of heating, cooling and dehumidification system(s) before, during and after the application of sanding sealer coats and finish coats.
B. Sanding
Sand wood flooring with drum sander, edger, buffer, and hand scraper. Floor is to be sanded to bare wood using a minimum four (4) cuts using coarse, medium and two (2) fine until surface is completely smooth. Additional cuts shall be completed if the surface is not completely smooth.
Any additional sanding required to the floor above the initial four cut process shall be completed at no additional cost.
C. Screening
After sanding, buff entire floor using 100 grit sanding screen with a heavy-duty buffing machine.
D. Tack
After screening, the floor shall be vacuumed and tacked to ensure that the surface is completely free of all dust and particles that may prove deleterious to the final floor finish.
E. Inspection
After sanding, screening and tack is completed, Owner shall inspect floor before finishing begins.
F. Finishing
1. Apply number of coats of primer/sealer per manufacturer’s instructions.
2. After each coat has cured, screen sealer with 100-grit discs, followed by vacuum and tack as described above.
3. Apply game lines and logos accurately and in colors as shown and dimensioned on drawings. Lines shall be straight with sharp edges. Allow curing time for painted game lines per manufacturer. Painted gym floor logo shall be painted in center jump circle.
Design of logo, lettering and graphic shall be provided by the Contractor for Architect and Owner review. Logo shall include up to five (5) separate colors for logo, lettering and graphic.
4. After the paint has dried completely, screen sealer with 100-grit discs, followed by vacuum and tack as described above.
5. Apply final finish consisting of number of coats of finish per manufacturer’s instructions.
Buff out the finish coats between each coat with previously used screens or new 180 grit screens.
3.06 Protection
After flooring systems are finished, Contractor is responsible for keeping areas free of traffic for a period of not less than 72 hours, or as required to allow finishes to cure. Protection of finished floor until acceptance by Owner shall be the complete responsibility of the Contractor.
END OF SECTION
6 09 6000
THIS PAGE INTENTIONALLY LEFT BLANK