Addendum Freezer.pdf
PDF 11 KB Posted
- Attached to
- NEW WALK IN FREEZER AT POWER MS
- Solicitation number
- RFP FPS 210000000076 1
- Issued by
- Berrien County, Edmore Village, Michigan
About this file
This is an addendum to construction plans and specifications issued by Wakely Associates, Inc., architects for Farmington Public Schools in Michigan, regarding a new walk-in freezer installation at Power Middle School. The addendum, dated October 13, 2020, modifies the original plans and specifications dated October 5, 2020, for Architect's Project No. 201872. The document addresses modifications to Specification Section 11400 Food Service Equipment, requiring contractors to replace the original issued specification section with a revised version. No drawings are being issued with this addendum; only the revised specification section for food service equipment is provided as part of the contract documents.
The addendum represents a clarification or modification to the food service equipment specifications for the walk-in freezer project but does not include pricing information, funding details, or other financial terms in this document. The revision was issued to ensure all bidders and contractors work from the current specification requirements for the food service equipment component of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NewWalk in Freezer BID21.00001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAKELY ASSOCIATES, INC. ADDENDUM NO. ONE
ARCHITECTS FARMINGTON PUBLIC SCHOOLS
30500 Van Dyke Ave. - Suite 209 NEW WALK-IN FREEZER AT Warren, Michigan, 48093 POWER MIDDLE SCHOOL Page 1 of 1 (write up only)
October 13, 2020
ADDENDUM NO. ONE to the plans and specifications for the FARMINGTON
PUBLIC SCHOOLS, NEW WALK-IN FREEZER AT POWER MIDDLE SCHOOL,
Architect’s Project No. 201872, dated October 5, 2020.
The above plans and specifications are modified, supplemented or augmented as follows, and this ADDENDUM NO. ONE is hereby made a part of the contract documents.
No Drawings are being issued with this Addendum.
Specification Section 11400 Food Service Equipment is being issued with this Addendum.
Specification Items:
ITEM NO. SP1: Refer to Specification Section 11400 Food Service
Equipment (Re-Issued):
1. Replace the original issued Specification Section 11400 with this REVISED Specification Section 11400.
END OF ADDENDUM NO. ONE
Cc: Felicia Venable, FPS
Addenda File
File details come from the government source that posted it. Updated .