This document is an Addendum for an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the Carter County Welcome Center Repairs and Upgrades project. The project is located along I-64 Westbound, Mile Marker 173.5 in Carter County, Kentucky.
The Addendum provides updates to the bid opening date, clarifications on previous addenda, changes to the specifications and drawings, and additional details for the plumbing, electrical, and site work. Notable changes include the removal of the requirement for public port-o-lets, the addition of solid surface countertops, and revisions to the restroom layouts. Bidders are instructed to use the updated drawings and specifications provided in the Addendum.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-267-23
FOR: Carter County Welcome Center Repairs and Upgrades I-64 Westbound, Mile Marker 173.5 Kentucky Transportation Cabinet Carter County, Kentucky
DATE: September 7, 2023
RFB-785-2400000044
ADDENDUM NO. Five (5)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Official Bid Opening has been moved to September 14, 2023 @ 2:00 pm Eastern Time, the conference call information will remain the same.
Item 2: Refer to Addendum No. 4, the attachments to this addendum were erroneously uploaded and sent out. Pages in this document were missing. This addendum contains the correct pages of Addendum No. 4, please use these pages in lieu of previously issued. The drawings in Addendum 4 were correct.
Item 3: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-267-23 For: Carter County Welcome Center Repairs and Upgrades I-64 Westbound, Mile Marker 173.5 Kentucky Transportation Cabinet Carter County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM 04 1
ADDENDUM 04 September 5, 2023
KYTC - Carter County Welcome Center Repairs and Upgrade Gallagher Office of Architecture, LLC I-64 Westbound, Mile Marker 173.5, Carter County, Kentucky 227 Miller Street Account No. 625-CA57-Z001-A34 Lexington, Kentucky 40507
Pre-Bid Meeting Held August 15 at 9:00 am Attendees:
Name Company Phone E-Mail
Ben Gallagher Gallagher Office of Arch 859-619-2079 ben@gallagheroa.com Chris Smith KYTC 502-564-3733 christophert.smith@ky.gov Chad Gore KYTC 502-229-8054 chad.gore@ky.gov John Mucci KYTC 502-330-9613 john.mucci@ky.gov David Utterback KYTC 606-776-5035 David.Utterback@ky.gov Kristi Gifford KYTC 606-849-1718 kristie.gifford@ky.gov Nathaniel Carty CPR Construction 606-474-2979 Buster Willis CPR Construction 606-474-2979 Scott Burnett KLM Electric 606-474-7000 Doug Roye KBR Solutions Group 502-750-1464 doug@kbrsolutionsgroup.com Blake Roberts KBR Solutions Group 859-321-4684 blake@kbrsolutionsgroup.com Christian Lamb Tekton Construction
Weather, 85 degrees, Sunny
Addendum 03
Item 1: Refer to Specifications, Section 10000 “Special Conditions” Item 6, note that the Contractor will only need to provide a single port-o-let for their use during construction. No public port-o-lets will need to be provided as the west bound facility will be closed to the public for the duration of the Contract.
Item 2: Refer to Specifications, Section 10000 “Special Conditions” Item 6, note that the Contractor will not be required to provide temporary signage for the project.
Item 3: The plan review fee has been paid for this project, Contractor will receive the building permit at no additional cost.
Item 4: Refer to Specifications, “Table of Contents”, references to Sections 312000 "Earth Moving", 321313 "Concrete Paving", 321373 "Concrete Paving Joint Sealants", 329200 "Turf and Grasses" but these sections were inadvertently omitted. These Sections are included as attachments to this addendum.
Item 5: Refer to Drawings, Sheet A2 “Floor Plan”, “Existing Exterior Soffit Note”, clarify that this note applies to exterior soffits on restroom building and vending building. Inner painted cedar plank ceiling at vending building to be patched using salvaged painted cedar plank soffit from exterior soffit on vending building. Paint inner cedar plank ceiling after patching.
Item 6: Refer to Drawings, Sheet A2 “Floor Plan”, “Door Schedule”, note that only Doors 102 through Door 110 are to be replaced with new hollow metal doors with grout slushed frames. Existing vending building doors are to remain.
Item 7: Refer to Specifications, Section 072100 “Thermal Insulation”, note that thermal insulation scope includes blown-in loose-fill fiberglass insulation in the attic and this work is only articulated in the specifications, not on the drawings.
Item 8: Refer to Specifications, Section 123661 “Solid Surface Countertops” was omitted from the specifications and the “Table of Contents”. Section 123661 is included as an attachment to this addendum. Further clarify that the new reception counter in Lobby 101 and the lavatory vanity counters in Men 103 and Women 104 receive
ADDENDUM 04 2
solid surface countertops. The kitchenette cabinets in Mechanical/Break 102 receive plastic laminate countertops per specification section 123530 “Residential Casework”.
Item 9: Refer to Drawings, Sheet P-301 “Plumbing Schedules and Details”, “Plumbing Fixture and Plumbing Specialties Schedule”, note that fixture L-1A “Solid Surface by Architect” is the typical of seven new lavatories installed in Men 103 and Women 104 at the new solid surface vanity countertops. Fixture L-1A is to be an undermount solid surface sink equal to Corian 810P and shall be solvent welded to the countertop from below for a seamless installation.
Item 10: Refer to Specifications, Section 087100 “Door Hardware”, delete reference to Door 111, it does not exist.
Item 11: Refer to Drawings, Sheet P-101 “Waste & Vent Demolition Plan”, clarify that the 4” waste line from the drinking fountain Lobby 101 and the 4” waste line from Men 103 and Women 104 are to be abandoned in place as they route across the building to the west. This clarification is to avoid unnecessary demolition of quarry tile and building slab. New waste piping shown on Sheet P-201 routes across the plumbing chase and should not be impacted by the abandoned 4” waste lines.
Item 12: Refer to Drawings, Sheet SE-101 “Site Electrical Plans”, “Site Electrical Demolition Plan”, clarify that the western most pole light and base to be demolished does not exist and is to be deleted from the demolition scope.
See attached 8.5”x11” Drawing, “SE-101 Site Electrical New Work Plan”.
Item 13: Refer to Drawings, Sheet E-201 “Electrical New Work Plan”, clarify that the new arrangement of water closets, urinals in Men’s 103 and Women’s 104. See attached 8.5”x11” Drawing, “E-201 Electrical New Work Plan”
Item 14: Refer to Drawings, Sheet P-201 “Plumbing New Work Waste Plan”, clarify that the new arrangement of water closets, floor drains, urinals in Men’s 103 and Women’s 104. See attached 8.5”x11” Drawing, “P-201 Plumbing Waste New Work Plan”
Item 15: Refer to Drawings, Sheet P-202 “New Work Domestic Water Plan”, clarify that the new arrangement of water closets, floor drains, urinals, hose bibbs in Men’s 103 and Women’s 104. See attached 8.5”x11” Drawing, “P-202 Plumbing Water New Work Plan”
Item 16: Refer to Drawings, Sheet P-301 Plumbing Schedules and Details, Waste Riser”, clarify that the new arrangement of water closets, floor drains, urinals in Men’s 103 and Women’s 104. See attached 8.5”x11” Drawing, “P-301 Waste Riser”.
Item 17: Refer to Drawings, Sheet P-301 Plumbing Schedules and Details, Water Riser”, clarify that the new arrangement of water closets, floor drains, urinals, hose bibbs in Men’s 103 and Women’s 104. See attached 8.5”x11” Drawing, “P-301 Water Riser”.
Item 18: Refer to Drawings, Sheet SE-101 “Site Electrical Plan”, add requirement for a new Unistrut Panel Support be constructed at the existing panel located near the Storage Building. See attached 8.5”x11” Drawing, “SE-101 Unistrut Panel Support Detail”
Attachments 01 Drawing 24”x36”, Sheet A1 “Demolition Plan” 02 Drawing 24”x36”, Sheet A2 “Floor Plan” 03 Drawing 24”x36”, Sheet A3 “Interior Elevations” 04 Drawing 8.5”x11”, Sheet P-201 “Plumbing Waste New Work Plan” 05 Drawing 8.5”x11”, Sheet P-202 “Plumbing Water New Work Plan” 06 Drawing 8.5”x11”, Sheet P-301 “Waste Riser” 07 Drawing 8.5”x11”, Sheet P-301 “Water Riser” 08 Drawing 8.5”x11”, Sheet SE-101 “Site Electrical Demo Plan” 09 Drawing 8.5”x11”, Sheet SE-101 “Site Electrical New Work Plan” 10 Drawing 8.5”x11”, Sheet SE-101 “Unistrut Panel Support Detail” 11 Drawing 8.5”x11”, Sheet E-201 “Electrical New Work Plan”
12 Specifications, Section 123661 “Solid Surfacing Countertops” 13 Specifications, Section 321000 “Earth Moving”
ADDENDUM 04 3
14 Specifications, Section 32131 “Concrete Paving” 15 Specifications, Section 321373 “Concrete Paving Joint Sealants” 16 Specifications, Section 329200 “Turf and Grasses”
End of Addendum 04
KYTC - Carter County Welcome Center Repairs and Upgrade Account No. 625-CA57-Z001-A34
SOLID SURFACING COUNTERTOPS 123661 - 1
SECTION 123661 - SOLID SURFACING COUNTERTOPS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Solid surface material countertops.
2. Solid surface material backsplashes.
3. Solid surface material end splashes.
4. Solid surface material apron fronts.
5. Solid surface material sinks.
1.2 ACTION SUBMITTALS
A. Product Data: For countertop materials and sinks.
B. Shop Drawings: For countertops. Show materials, finishes, edge and backsplash profiles, methods of joining, and cutouts for plumbing fixtures.
C. Samples: For each type of material exposed to view.
PART 2 - PRODUCTS
2.1 SOLID SURFACE COUNTERTOP MATERIALS
A. Solid Surface Material: Homogeneous-filled plastic resin complying with ICPA SS-1.
1. Manufacturers:
a. Formica Corporation
b. Du Pont Corporation
c. Wilsonart, LLC
2. Type: Provide Standard type.
3. Integral Sink Bowls: Comply with CSA B45.5/IAPMO Z124.
4. Colors and Patterns: As selected by Architect from manufacturer's full range.
B. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue.
2.2 COUNTERTOP FABRICATION
A. Fabricate countertops according to solid surface material manufacturer's written instructions and to the AWI/AWMAC/WI's "Architectural Woodwork Standards."
1. Grade: Premium.
SOLID SURFACING COUNTERTOPS 123661 - 2
B. Configuration:
1. Front: Non-drip edge (marine edge) with separate apron, 6 inches high, recessed 1/4-inch behind front edge.
2. Backsplash: Straight, slightly eased at corner.
3. End Splash: Matching backsplash (where countertop terminates to a side wall).
C. Countertops: 1/2-inch-thick, solid surface material with front edge built up with same material.
D. Backsplashes: 1/2-inch-thick, solid surface material.
E. Joints: Fabricate countertops in sections for joining in field, with joints at locations indicated in Shop Drawings.
2.3 INSTALLATION MATERIALS
A. Adhesive: Product recommended by solid surface material manufacturer.
B. Sealant for Countertops: Comply with applicable requirements in Section 079200 "Joint Sealants."
PART 3 - EXECUTION
3.1 INSTALLATION
A. Fasten countertops by screwing through corner blocks of base units into underside of countertop. Predrill holes for screws as recommended by manufacturer.
B. Fasten subtops to cabinets by screwing through subtops into cornerblocks of base cabinets.
Shim as needed to align subtops in a level plane.
C. Secure countertops to subtops with adhesive according to solid surface material manufacturer's written instructions.
D. Bond joints with adhesive and draw tight as countertops are set. Mask areas of countertops adjacent to joints to prevent adhesive smears.
E. Install backsplashes and end splashes by adhering to wall and countertops with adhesive.
F. Install aprons to backing and countertops with adhesive.
G. Apply sealant to gaps at walls; comply with Section 079200 "Joint Sealants."
END OF SECTION 123661
EARTH MOVING 312000 - 1
SECTION 312000 - EARTH MOVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Preparing subgrades for slabs-on-grade, walks, pavements, turf and grasses.
2. Drainage course for concrete slabs-on-grade.
3. Subbase course for concrete walks and pavements.
4. Excavating and backfilling for utility trenches (downspout drains).
1.2 DEFINITIONS
A. Backfill: Soil material used to fill an excavation.
1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.
F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.
G. Fill: Soil materials used to raise existing grades.
H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
EARTH MOVING 312000 - 2
I. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.
J. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.
K. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.
1.3 PROJECT CONDITIONS
A. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth moving operations.
B. Report of Geotechnical Exploration: Report of Geotechnical Exploration (the Geotechnical Report) for this Project has been included with the bid documents. This report provides valuable information concerning the site and recommendations for construction. All Contractors shall familiarize themselves thoroughly with it in order to fully understand the design intent of the Construction Documents.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487, or a combination of these groups; free of rock or gravel larger than 3 inches (75
mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487, or a combination of these groups.
1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.
2. Asphalt millings may not be used as fill for structures.
D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.
E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.
EARTH MOVING 312000 - 3
F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.
G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1-inch (25-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.
H. Drainage Course: Narrowly graded mixture of crushed stone, or crushed or uncrushed gravel;
ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-
mm) sieve and 0 to 5 percent passing a No. 8 (2.36-mm) sieve.
2.2 ACCESSORIES
A. Detectable Warning Tape: Acid- and alkali-resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches (150
mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of the utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches (750 mm) deep; colored to comply with local practice or requirements of authorities having jurisdiction.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth moving operations.
B. Protect and maintain erosion and sedimentation controls during earth moving operations.
C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.
3.2 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.
1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.
EARTH MOVING 312000 - 4
3.3 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.
3.4 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.
B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit unless otherwise indicated.
C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits. Remove projecting stones and sharp objects along trench subgrade.
1. Excavate trenches 6 inches (150 mm) deeper than elevation required in rock or other unyielding bearing material, 4 inches (100 mm) deeper elsewhere, to allow for bedding course.
3.5 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Architect.
1. Fill unauthorized excavations under other construction, pipe, or conduit as directed by Architect.
3.6 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.
Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.
3.7 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.
B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.
EARTH MOVING 312000 - 5
C. Trenches under Footings: Backfill trenches excavated under footings and within 18 inches (450
mm) of bottom of footings with satisfactory soil; fill with concrete to elevation of bottom of footings. Concrete is specified in Division 03 Section "Cast-in-Place Concrete”.
D. Place and compact initial backfill of satisfactory soil, free of particles larger than 1 inch (25
mm) in any dimension, to a height of 12 inches (300 mm) over the pipe or conduit.
1. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of piping or conduit to avoid damage or displacement of piping or conduit. Coordinate backfilling with utilities testing.
E. Place and compact final backfill of satisfactory soil to final subgrade elevation.
F. Install warning tape directly above utilities, 12 inches (300 mm) below finished grade, except 6 inches (150 mm) below subgrade under pavements and slabs.
3.8 SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.
B. Place and compact fill material in layers to required elevations as follows:
1. Under grass and planted areas, use satisfactory soil material.
2. Under walks and pavements, use satisfactory soil material.
3. Under steps and ramps, use satisfactory soil material.
4. Under building slabs, use satisfactory soil material.
5. Under footings and foundations, use satisfactory soil material.
3.9 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.
1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.
2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.
3.10 DEWATERING
A. Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.
EARTH MOVING 312000 - 6
3.11 COMPACTION OF SOIL BACKFILLS AND FILLS
A. Place backfill and fill soil materials in layers not more than 8 inches (200 mm) in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches (100 mm) in loose depth for material compacted by hand-operated tampers.
B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.
C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 698:
1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches (300 mm) of existing subgrade and each layer of backfill or fill soil material at 95 percent.
2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 92 percent.
3. Under turf or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 85 percent.
4. For utility trenches, compact each layer of initial and final backfill soil material at 85 percent.
3.12 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.
B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent ponding.
Finish subgrades to required elevations within the following tolerances:
1. Turf or Unpaved Areas: Plus or minus 1 inch (25 mm).
2. Walks: Plus or minus 1 inch (25 mm).
3. Pavements: Plus or minus 1/2 inch (13 mm).
C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch (13 mm) when tested with a 10-foot (3-m) straightedge.
D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch (13 mm) of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future.
3.13 SUBBASE AND BASE COURSES UNDER PAVEMENTS AND WALKS
A. Place subbase course and base course on subgrades free of mud, frost, snow, or ice.
B. On prepared subgrade, place subbase course and base course under pavements and walks as follows:
EARTH MOVING 312000 - 7
1. Shape subbase course and base course to required crown elevations and cross-slope grades.
2. Place subbase course and base course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150
mm) thick or less than 3 inches (75 mm) thick.
3. Compact subbase course and base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 698.
3.14 DRAINAGE COURSE UNDER CONCRETE SLABS-ON-GRADE
A. Place drainage course on subgrades free of mud, frost, snow, or ice.
B. On prepared subgrade, place and compact drainage course under cast-in-place concrete slabs-on-grade as follows:
1. Place drainage course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than 3 inches (75 mm) thick.
2. Compact each layer of drainage course to required cross sections and thicknesses to not less than 95 percent of maximum dry unit weight according to ASTM D 698.
3.15 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified geotechnical engineering testing agency to perform tests and inspections.
B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earth moving only after test results for previously completed work comply with requirements.
C. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Architect.
D. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompact and retest until specified compaction is obtained.
3.16 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.
B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.
EARTH MOVING 312000 - 8
C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.
1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.
3.17 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.
END OF SECTION 312000
CONCRETE PAVING 321313 - 1
SECTION 321313 - CONCRETE PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Walks.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Other Action Submittals:
1. Design Mixtures: For each concrete paving mixture. Include alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1.3 QUALITY ASSURANCE
A. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
B. ACI Publications: Comply with ACI 301 (ACI 301M) unless otherwise indicated.
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, fabricated from as-drawn steel wire into flat sheets.
B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice" from steel wire, plastic, or precast concrete of greater compressive strength than concrete specified.
2.2 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of same type, brand, and source throughout Project:
CONCRETE PAVING 321313 - 2
1. Portland Cement: ASTM C 150, portland cement Type I
a. Fly Ash: ASTM C 618, Class F.
b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.
B. Normal-Weight Aggregates: ASTM C 33, Class 1N, uniformly graded. Provide aggregates from a single source.
C. Water: Potable and complying with ASTM C 94/C 94M.
D. Air-Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material.
2.3 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 3, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. dry.
B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
C. Water: Potable.
D. Evaporation Retarder: Waterborne, monomolecular, film forming, manufactured for application to fresh concrete.
E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.
F. White, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 2, Class B, dissipating.
2.4 PAVEMENT MARKINGS
A. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT-P-1952, Type II, with drying time of less than 45 minutes.
1. Color: Verify with Architect
2.5 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, with the following properties:
1. Compressive Strength (28 Days): 3500 psi .
2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.50.
3. Slump Limit: 4 inches , plus or minus 1 inch.
CONCRETE PAVING 321313 - 3
4. Air Content: 4-1/2 percent plus or minus 1.5 percent.
B. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
2.6 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Furnish batch certificates for each batch discharged and used in the Work.
2.7 PAVEMENT MARKINGS
A. Pavement-Marking Paint: MPI #97 Latex Traffic Marking Paint.
1. Color: White and Blue, as indicated.
2.8 WHEEL STOPS
A. Wheel Stops: Precast, air-entrained concrete.
1. Color: Gray.
2. Dowels: Galvanized steel, 3/4 inch in diameter, 10-inch minimum length.
PART 3 - EXECUTION
3.1 EXAMINATION AND PREPARATION
A. Proof-roll prepared subbase surface below concrete paving to identify soft pockets and areas of excess yielding.
B. Remove loose material from compacted subbase surface immediately before placing concrete.
3.2 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.
B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.
3.3 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.
CONCRETE PAVING 321313 - 4
3.4 JOINTS
A. General: Form construction, isolation, and contraction joints and tool edges true to line, with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline unless otherwise indicated.
B. Construction Joints: Set construction joints at side and end terminations of paving and at locations where paving operations are stopped for more than one-half hour unless paving terminates at isolation joints.
C. Isolation Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, other fixed objects, and where indicated.
D. Contraction Joints: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness.
E. Edging: After initial floating, tool edges of paving, gutters, curbs, and joints in concrete with an edging tool to a 1/4-inch radius. Repeat tooling of edges after applying surface finishes.
Eliminate edging-tool marks on concrete surfaces.
3.5 CONCRETE PLACEMENT
A. Moisten subbase to provide a uniform dampened condition at time concrete is placed.
B. Comply with ACI 301 requirements for measuring, mixing, transporting, placing, and consolidating concrete.
C. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.
D. Screed paving surface with a straightedge and strike off.
E. Commence initial floating using bull floats or darbies to impart an open-textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments.
3.6 FLOAT FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.
B. Float Finish: Begin the second floating operation when bleed-water sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture.
CONCRETE PAVING 321313 - 5
1. Medium-to-Coarse-Textured Broom Finish: Provide a coarse finish by striating float-finished concrete surface 1/16 to 1/8 inch deep with a stiff-bristled broom, perpendicular to line of traffic.
3.7 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
B. Comply with ACI 306.1 for cold-weather protection.
C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete but before float finishing.
D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
E. Curing Methods: Cure concrete by moisture curing, moisture-retaining-cover curing, curing compound, or a combination of these.
3.8 PAVEMENT MARKING
A. Sweep and clean surface to eliminate loose material and dust.
B. Apply paint with mechanical equipment to produce markings of dimensions indicated with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
3.9 REPAIRS AND PROTECTION
A. Remove and replace concrete paving that is broken, damaged, or defective or that does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by Architect.
B. Protect concrete paving from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur.
C. Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep paving not more than two days before date scheduled for Substantial Completion inspections.
END OF SECTION 321313
CONCRETE PAVING JOINT SEALANTS 321373 - 1
SECTION 321373 - CONCRETE PAVING JOINT SEALANTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cold-applied joint sealants.
2. Joint-sealant backer materials.
3. Primers.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each kind and color of joint sealant required.
C. Paving-Joint-Sealant Schedule: Include the following information:
1. Joint-sealant application, joint location, and designation.
2. Joint-sealant manufacturer and product name.
3. Joint-sealant formulation.
4. Joint-sealant color.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
2.2 COLD-APPLIED JOINT SEALANTS
A. Single Component, Nonsag, Urethane, Elastomeric Joint Sealant: ASTM C 920, Type S, Grade NS, Class 25, for Use T.
1. Sika USA, Sikaflex 1A,
2. Tremco, Dymonic FC
3. BASF, Masterseal TX 1
CONCRETE PAVING JOINT SEALANTS 321373 - 2
2.3 JOINT-SEALANT BACKER MATERIALS
A. Backer Strips for Cold- and Hot-Applied Joint Sealants: ASTM D 5249; Type 2; of thickness and width required to control joint-sealant depth, prevent bottom-side adhesion of sealant, and fill remainder of joint opening under sealant.
2.4 PRIMERS
A. Primers: Product recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated.
PART 3 - EXECUTION
3.1 INSTALLATION OF JOINT SEALANTS
A. Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated unless more stringent requirements apply.
B. Cleaning of Joints: Clean out joints immediately to comply with joint-sealant manufacturer's written instructions.
C. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint-sealant manufacturer.
D. Joint-Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions.
E. Install joint-sealant backings to support joint sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of joint-sealant backings.
2. Do not stretch, twist, puncture, or tear joint-sealant backings.
3. Remove absorbent joint-sealant backings that have become wet before sealant application and replace them with dry materials.
F. Install joint sealants immediately following backing installation, using proven techniques that comply with the following:
1. Place joint sealants so they fully contact joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
G. Tooling of Nonsag Joint Sealants: Immediately after joint-sealant application and before skinning or curing begins, tool sealants according to the following requirements to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint:
CONCRETE PAVING JOINT SEALANTS 321373 - 3
1. Remove excess joint sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by joint-sealant manufacturer and that do not discolor sealants or adjacent surfaces.
3. Mask adjacent surfaces to achieve a clean finished appearance.
H. Provide joint configuration to comply with joint-sealant manufacturer's written instructions unless otherwise indicated.
I. Clean off excess joint sealant as the Work progresses, by methods and with cleaning materials approved in writing by joint-sealant manufacturers.
END OF SECTION 321373
TURF AND GRASSES 329200 - 1
SECTION 329200 - TURF AND GRASSES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Seeding.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Certification of grass seed.
1. Certification of each seed mixture for turfgrass sod.
C. Product certificates.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable.
PART 2 - PRODUCTS
2.1 SEED
A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed Technology; Rules for Testing Seeds" for purity and germination tolerances.
B. Grass Seed Mix: Proprietary seed mix as follows:
1. Products: Subject to compliance with requirements, provide the following (or approved equal):
a. Scotts, “Snap” Sun & Shade Mix Grass Seed.
2.2 PLANTING SOILS
A. Planting Soil: Verify suitability of soil to produce viable planting soil. Clean soil of roots, plants, sod, stones, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or
TURF AND GRASSES 329200 - 2
chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth.
PART 3 - EXECUTION
3.1 TURF AREA PREPARATION
A. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 4 inches. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.
B. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future.
C. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.
3.2 SEEDING
A. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal quantities in two directions at right angles to each other. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.
B. Sow seed at a total rate of 2 lb/1000 sq. ft..
C. Rake seed lightly into top 1/8 inch of soil, roll lightly, and water with fine spray.
D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment.
3.3 SATISFACTORY TURF
A. Turf installations shall meet the following criteria as determined by Architect:
1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. and bare spots not exceeding 5 by 5 inches.
B. Use specified materials to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory.
END OF SECTION 329200
| Addendum Five |
| 00 Carter Co Rest Area Addendum 04 |
| 12 123661 SF - Solid Surfacing Countertops |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Solid surface material countertops. |
| 2. Solid surface material backsplashes. |
| 3. Solid surface material end splashes. |
| 4. Solid surface material apron fronts. |
| 5. Solid surface material sinks. |
| 1.2 ACTION SUBMITTALS |
| A. Product Data: For countertop materials and sinks. |
| B. Shop Drawings: For countertops. Show materials, finishes, edge and backsplash profiles, methods of joining, and cutouts for plumbing fixtures. |
| C. Samples: For each type of material exposed to view. |
| PART 2 - PRODUCTS |
| 2.1 SOLID SURFACE COUNTERTOP MATERIALS |
| A. Solid Surface Material: Homogeneous-filled plastic resin complying with ICPA SS-1. |
| 1. Manufacturers: |
| a. Formica Corporation |
| b. Du Pont Corporation |
| c. Wilsonart, LLC |
| 2. Type: Provide Standard type. |
| 3. Integral Sink Bowls: Comply with CSA B45.5/IAPMO Z124. |
| 4. Colors and Patterns: As selected by Architect from manufacturer's full range. |
B. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue.
| 2.2 COUNTERTOP FABRICATION |
| A. Fabricate countertops according to solid surface material manufacturer's written instructions and to the AWI/AWMAC/WI's "Architectural Woodwork Standards." |
| 1. Grade: Premium. |
| B. Configuration: |
| 1. Front: Non-drip edge (marine edge) with separate apron, 6 inches high, recessed 1/4-inch behind front edge. |
| 2. Backsplash: Straight, slightly eased at corner. |
| 3. End Splash: Matching backsplash (where countertop terminates to a side wall). |
| C. Countertops: 1/2-inch-thick, solid surface material with front edge built up with same material. |
| D. Backsplashes: 1/2-inch-thick, solid surface material. |
| E. Joints: Fabricate countertops in sections for joining in field, with joints at locations indicated in Shop Drawings. |
| 2.3 INSTALLATION MATERIALS |
| A. Adhesive: Product recommended by solid surface material manufacturer. |
| B. Sealant for Countertops: Comply with applicable requirements in Section 079200 "Joint Sealants." |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| A. Fasten countertops by screwing through corner blocks of base units into underside of countertop. Predrill holes for screws as recommended by manufacturer. |
| B. Fasten subtops to cabinets by screwing through subtops into cornerblocks of base cabinets. Shim as needed to align subtops in a level plane. |
| C. Secure countertops to subtops with adhesive according to solid surface material manufacturer's written instructions. |
| D. Bond joints with adhesive and draw tight as countertops are set. Mask areas of countertops adjacent to joints to prevent adhesive smears. |
| E. Install backsplashes and end splashes by adhering to wall and countertops with adhesive. |
| F. Install aprons to backing and countertops with adhesive. |
| G. Apply sealant to gaps at walls; comply with Section 079200 "Joint Sealants." |
| 13 312000 SF - Earth Moving |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Preparing subgrades for slabs-on-grade, walks, pavements, turf and grasses. |
| 2. Drainage course for concrete slabs-on-grade. |
| 3. Subbase course for concrete walks and pavements. |
| 4. Excavating and backfilling for utility trenches (downspout drains). |
| 1.2 DEFINITIONS |
| A. Backfill: Soil material used to fill an excavation. |
| 1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe. |
| 2. Final Backfill: Backfill placed over initial backfill to fill a trench. |
| B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. |
| C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe. |
| D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill. |
| E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water. |
| F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated. |
| 1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect. Authorized additional excavation and replacement material will be paid for according to Contract provisions ... |
| 2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation. |
| G. Fill: Soil materials used to raise existing grades. |
| H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface. |
| I. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk. |
| J. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials. |
| K. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings. |
| 1.3 PROJECT CONDITIONS |
| A. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth moving operations. |
| B. Report of Geotechnical Exploration: Report of Geotechnical Exploration (the Geotechnical Report) for this Project has been included with the bid documents. This report provides valuable information concerning the site and recommendations for const... |
| PART 2 - PRODUCTS |
| 2.1 SOIL MATERIALS |
| A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations. |
| B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487, or a combination of these groups; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation... |
| C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487, or a combination of these groups. |