Addendum.1~1.docx
DOCX document 40 KB Posted
- Attached to
- US395C Crack Seal Project
- Solicitation number
- S-73000-00012320
- Issued by
- Hood River County, Oregon
About this file
This is an Addendum No. 1 issued by the Oregon Department of Transportation (ODOT) for ITB No. S-73000-00012320, regarding the US 395C Crack Seal Project. The addendum extends the bid closing date from January 14, 2025, at 10:00 AM to January 21, 2025, at 11:00 AM. Additionally, it modifies the specifications in Attachment A, specifically removing language from Section General, paragraph 1 that required the contractor to mark the quantity of cracks completed in spray paint on the shoulder in half-mile sections for verification purposes prior to the end of each day.
The project involves crack sealing work on US 395C from Milepost 49.1 to 61.6 and from milepost 67.3 to 67.61, with ODOT supplying the crack seal material. Requests for clarification, changes, and protests of this Addendum are due by January 15, 2025, at 5:00 PM. The buyer contact is Dave Dethloff, who can be reached at William.d.dethloff@odot.oregon.gov or 503-569-8793.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Attachment_G_2015_Matrix.pdf | ||
| Attachment A (Specifications)~1.docx | DOCX document | |
| Invitation.To.Bid~2.docx | DOCX document | |
| 00012320 Intent To Award.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DATE: |
| 01/13/2025 |
| OREGON DEPARTMENT OF TRANSPORTATION |
INVITATION TO BID
ADDENDUM NO. 1
| ITB NO.: |
| S-73000-00012320 |
| CLOSING DATE: |
| 01/14/2025 |
| TIME: |
| 10:00 AM |
| DESCRIPTION: |
| US 395C Crack Seal Project |
| BUYER: |
| Dave Dethloff |
| EMAIL: |
| William.d.dethloff@odot.oregon.gov |
| PHONE: |
| 503-569-8793 |
Requests for clarification, requests for change, and protests of this Addendum are due no later than:
01/15/2025 @ 5:00 PM.
This Addendum modifies the Invitation To Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Acknowledge receipt of this Addendum by indicating its number in the spaces provided ITB Section H – Addenda Acknowledgement. Failure to do so may result in Bid rejection. See the ITB regarding pre-opening modifications of Bids, where to send Bid modifications, requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.
THE PURPOSE OF THIS ADDENDUM IS TO:
· Make corrections to required work in Attachment A Specifications
· Extend the bid closing date for this solicitation in OregonBuys to 01/21/2025 @ 11:00 AM
DESCRIPTION OF CHANGES
Removal of scope of work in Attachment A Specifications.
· Document labelled “ Attachment A (Specifications).docx” Section General, paragraph 1 is amended as follows. New language is Bold and Underlined; deleted language is struck through.
General - The Contractor shall always have a responsible party on the job while work is in progress, capable and with authority to make job-site decision as an official Contractor's representative. The Contractor shall provide the contact person with a summarization of activities and work performed daily if requested. The Contractor shall mark the quantity of cracks completed in spray paint on the shoulder in half mile sections for verification purposes prior to the end of each day.
· Extend bid closing date from 01/14/2025 @ 10:00 AM to 01/21/2025 @ 11:00.
ITB_ADDENDUM, S006-G031521
image1.wmf
File details come from the government source that posted it. Updated .