ADDENDUM A - DRES Verkada Camera Installation Project 11.06.2026.pdf
PDF 216 KB Posted
- Solicitation number
- 39708
- Issued by
- Middlesex County, Connecticut
About this file
This Addendum A document pertains to the Deep River School District's Request for Proposals for Verkada Camera System Installation at Deep River Elementary School in Connecticut, issued on November 6, 2026. The addendum provides clarifications and modifications to the original solicitation following the mandatory in-person walkthrough held on November 3, 2026, at the school site. Five prospective bidders attended the walkthrough: Samuel Arroyo (StarkTech), Richard Barrett (CMS), Seo Park (Eastern Datacomm), John Santry (Security 101), and Thomas Riggio (CT Comp). The addendum revises equipment installation heights for the Main Entrance Intercom and River Street Intercom to 5.00 feet (previously listed as 10 feet) and specifies Rooftop installation for the Roof Overview camera, with a tolerance of plus or minus 2.00 feet from stated heights to be reflected in proposed costs. Sealed proposals were due on November 12, 2026, at 2:00 p.m. at the Office of the Superintendent, 1 Winthrop Road, Deep River, Connecticut 06417.
The addendum addresses seven vendor questions and clarifications, including confirmation that the original statement of work was modified by a third-party consultant based on Board and Administration input, clarification regarding the River Street Multi Head camera configuration (a single Four-Camera Multisensor unit), and confirmation that the school building contains asbestos in certain areas with additional information available to bidders. All existing equipment and wiring will be replaced, the current door access control system uses KERI System with badge card access, and IT closets are located in the Main East Hallway and between the Main Entrance and River Street Entrance on the first floor. Regarding the Northeast Hallway Corridor camera placement, the school confirmed through third-party consultant review that the CD63 camera meets Verkada's People Analytics requirements and maintains the Bill of Materials and Statement of Work as originally outlined, while reserving the right to negotiate change orders with the successful vendor during installation if adjustments are necessary.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEEP RIVER SCHOOL DISTRICT
REQUEST FOR PROPOSALS
VERKADA CAMERA SYSTEM INSTALLATION
AT DEEP RIVER ELEMENTARY SCHOOL
November 6, 2026
Company Name: _________________________________________
Name:__________________________________________________
Street: _________________________________________________
City/State/Zip: ___________________________________________
The respondent hereby acknowledges receipt of the Addenda listed below and further acknowledges that the provisions of the Addendum have been included in the preparation of this proposal:
Addendum A: November 6, 2026
Signature:_______________________________________________
Date:___________________________________________________
ADDENDUM A
November 6, 2026
1. WALKTHROUGH ATTENDEES
The following prospective bidders attended the mandatory in person walkthrough held on
Tuesday, November 3, 2026, at Deep River Elementary School:
• Samuel Arroyo, StarkTech
• Richard Barrett, CMS
• Seo Park, Eastern Datacomm
• John Santry, Security 101
• Thomas Riggio, CT Comp
2. CLARIFICATION ON LISTED CAMERA HEIGHTS
It was brought to the school’s attention that throughout Attachment 1, the camera and intercom heights in the diagrams were all listed at 10 feet. Prospective vendors should be advised that the installed height for the following pieces of equipment is hereby revised as stated:
• Main Entrance Intercom: 5.00 feet
• River Street Intercom: 5.00 feet
• Roof Overview: Rooftop
Prospective vendors should also be advised that in all locations, vendors should anticipate a tolerance of plus or minus +/- 2.00 feet from the stated height in the diagrams to the final installed height. Proposed costs should reflect this tolerance.
3. VENDOR QUESTIONS & ANSWERS
1. Was the statement of work developed internally, by Verkada, or by a third-party?
The original scope was taken from a previous RFP issued in October 2025, which did not go forward. That scope was modified by a third-party consultant based on Board of
Education and Administration input, to develop the scope and statement of work for this
RFP.
2. The camera descriptions, part numbers, and license information is missing in Attachment
2: Bill of Materials, for three items with the location of River Street Multi Head. Please clarify.
This is correct, because there will be a single Four-Camera Multisensor unit in this location, as listed in the space above the three blank lines, so the additional camera details and licenses are already covered by that single line with all of the required equipment as outlined.
3. Does the school have any known asbestos or asbestos containing materials?
Yes, the school does contain asbestos in areas of the building. Additional information can be provided to the prospective bidder.
4. Will any existing equipment or wiring be reinstalled or remain in place?
No, it is expected that all existing equipment and wiring will need to be replaced with the new installations.
5. What is the current door access control system?
Doors are all controlled by the KERI System with badge card access.
6. Where are the IT closets in the school?
As noted during the walkthrough, there is an IDF closet in the Main East Hallway and a main
IT closet between the Main Entrance and the River Street Entrance, both being on the first floor.
7. Is the camera listed at the corner of the Northeast Hallway Corridor appropriate for this location, based upon height, potential ceiling obstructions, and viewing angles for two hallways meeting at a 90-degree angle?
Subsequent to the walkthrough, the school discussed this matter and sought advice from our third-party consultant. The consultant confirmed that the pixels per foot at the farthest intended coverage point in each hallway exceed Verkada’s People Analytics guide requirements for person detection on the CD63 camera by 2.5 times. The consultant further confirmed that the ceiling-mounted lights, signage, and other objects are above the intended mounting and viewing area.
Based upon these recommendations, the school will maintain the Bill of Materials and
Statement of Work as originally outlined; however, the school reserves the right to negotiate change orders with the successful vendor during installation should changes be required to maximize viewing and sightlines.
END OF ADDENDUM A