Addendum 5 26156.pdf

PDF 175 KB Posted

Attached to
472/26156. MDL; Chippewa C.F. Sanitary Sewer Upgrades
Solicitation number
RFQ 171 270000000012 8
Issued by
Chippewa County, Michigan

About this file

This is Construction Bid Addendum No. 5 issued by the Michigan Department of Technology, Management and Budget for the Chippewa Correctional Facility - Sanitary Sewer Pretreatment & Infrastructure Upgrade project. The project, located at 4269 West M-80 in Kincheloe, Michigan, involves construction of a new building to house a sewer pretreatment station, including site modifications, installation of bar screen equipment, heating/ventilation/exhaust systems, plumbing and utility connections, electrical service, power distribution, controls, and equipment connections. The pre-bid conference and mandatory walk-through was held on October 21, 2026, at 11:00 am, with questions accepted through October 28, 2026, at 2:00 pm. The bid opening date is November 11, 2026, at 2:00 pm ET. The approximate project start is May 2027 with substantial completion targeted for January 2028 (8 months) and final completion in February 2028 (30 days). Addendum 5 reissued Specification Section 00300-1 and updated the bid summary cover sheet to reflect the revised bid opening date. Bidders must acknowledge this addendum in the bid summary and bid form, as failure to do so may result in bid rejection.

This addendum requires a performance bond and payment bond for all bids exceeding $50,000.00, along with a five percent bid guarantee. Builders risk insurance is required to be provided by the contractor unless otherwise specified in the bidding documents. The file indicates bidders must submit bids electronically through the SIGMA VSS website and certify their status as a Qualified Disabled Veteran and Michigan-Based Business. Warranty review meetings are scheduled for six and twelve months after substantial completion. No additional site visits beyond the mandatory pre-bid walk-through are permitted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 5

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

11//2026

PROJECT NAME

Chippewa Correctional Facility – Sanitary Sewer Upgrade

FILE NUMBER

472/26156.MDL

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

Mike Lusk

BID OPENING DATE:

11/11/2026

ADDENDUM ITEMS:

1. Reissued Specification Section 00300 – 1, Updated bid summary cover sheet to reflect updated bid opening date of 11/11/2026.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Troy Thelen, Matrix DATE: 11/4/2026

APPROVED BY:

PROJECT DIRECTOR: Mike Lusk

DATE: 11/4/2026

STATE OF MICHIGAN (OWNER AND CONTRACTOR) BID SUMMARY

MICHSPEC™ DTMB 00300 - 1

SECTION 00300 − BID SUMMARY

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically through the SIGMA VSS website at SIGMA VSS

FILE NUMBER

472/26156.MDL

DEPARTMENT/AGENCY

Michigan Department of Corrections (MDOC)

CONTRACT TIME(S)

Pre-Bid Conference & Walk-Through: October 21, 2026, at 11:00 am Accepting Questions up to: October 28 2026, at 2:00 pm Last Addendum Issued: October 30, 2026 Approximate Project Start: May 2027 Approximate Substantial Completion: January 2028 (8 months) Approximate Final Completion: February 2028 (30 days) Warranty Review Meeting: 6 & 12 Months after Substantial Completion

PROJECT NAME

Chippewa Correctional Facility – Sanitary Sewer Pretreatment & Infrastructure Upgrade

LOCATION

4269 West M-80 Kincheloe, MI 49784

BID OPENING DATE

November 11, 2026 at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Project requires mandatory attendance at the pre-bid Walk-through. No additional site visits are permitted.

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE CONTRACTOR UNLESS

OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

Construction of a new building to house the new Sewer Pretreatment Station. Work includes, but is not limited to, construction of the new building; associated site modifications and upgrades; installation of new bar screen equipment; installation of heating, ventilation, and exhaust system; plumbing and utility connections; and providing the required lighting, electrical service, power distribution, controls, and equipment connections necessary to support the new building and associated equipment.