Addendum 3 26156.pdf

PDF 121 KB Posted

Attached to
472/26156. MDL; Chippewa C.F. Sanitary Sewer Upgrades
Solicitation number
RFQ 171 270000000012 8
Issued by
Chippewa County, Michigan

About this file

This is a Construction Bid Addendum issued by the Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division for the Chippewa Correctional Facility Sanitary Sewer Upgrade project (File Number 472/26156.MDL). The addendum provides clarification regarding the sewer bypass system requirements, specifying that pumps will be required to handle average flow of 0.35 million gallons per day (MGD), peak day flow of 0.90 MGD, and peak hourly flow of 1.5 MGD. The contractor is responsible for determining the routing of bypass piping as part of a bypass plan required for submittal during construction, with the plans indicating the upstream manhole and downstream lift station as reference points. The addendum was issued on October 30, 2026, with a bid opening date of November 4, 2026. Bidders are required to acknowledge receipt of this addendum in the Bid Summary and Bid Form, as failure to acknowledge may result in bid rejection.

The professional overseeing the project is Matrix Consulting Engineers, with Mike Lusk serving as Project Director and Troy Thelen as the approving professional. This addendum becomes part of the contract documents upon issuance. No pricing terms, set-asides, incumbent information, or funding sources are specified in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 3

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/30/2026

PROJECT NAME

Chippewa Correctional Facility – Sanitary Sewer Upgrade

FILE NUMBER

472/26156.MDL

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

Mike Lusk

BID OPENING DATE:

11/4/2026

ADDENDUM ITEMS:

1. Clarification: Pumps will be required for the sewer by pass system. 0.35 MGD average flow, 0.90 MGD peak day flow, and 1.5 MGD peak hourly flow. The routing of the bypass piping will be determined by the contractor, as part of the by-pass plan that is required for submittal during construction. The plans indicate the upstream manhole and downstream lift station for reference.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Troy Thelen, Matrix DATE: 10/30/2026

APPROVED BY:

PROJECT DIRECTOR: Mike Lusk

DATE: 10/30/2026