Addendum_4_Exhibit_B-1_Rate_Sheet_Fillable.xlsx

XLSX spreadsheet 190 KB Posted

Attached to
C5612448-D, High Voltage Equipment Maintenance and Repair Services
Solicitation number
0000033392
Issued by
California

About this file

This is a rate sheet exhibit for a High Voltage Equipment Maintenance and Repair Services contract with the California Department of Corrections and Rehabilitation (CDCR), detailing equipment and service requirements across 29 correctional facilities. The rate sheet outlines comprehensive preventative maintenance, inspection, and testing services for various high voltage equipment including switchgear, circuit breakers, transformers, automatic transfer switches, circuit switchers, and power poles, with service frequencies typically three times per year. The document specifies estimated quantities for each type of equipment and component requiring maintenance at each facility.

The rate sheet includes sections for scheduled repairs, emergency repairs during normal business hours, and emergency repairs outside normal business hours, with estimated hours provided for each facility. Each facility's section includes estimated amounts for parts ($50,000-$100,000) and equipment rental ($30,000-$75,000). Contractors may bid on one or more locations but must include rates for all items within that location. The contract includes a provision allowing CDCR to augment the Master Agreement amount by 25-100% of the total bid amount, and contractors may offer a discount of at least 1% (minimum $50) on invoices paid within 30 days.

View the file

Other files

File Type Posted
Addendum_4.pdf PDF
Addendum_2.pdf PDF
Addendum_3.pdf PDF
Addendum_1.pdf PDF
Addendum_1_Exhibit_B-1_Rate_Sheet_Fillable.xlsx XLSX spreadsheet
C5612448-D_-_High_Voltage_IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Sheet

HIGH VOLTAGE EQUIPMENT MAINTENANCE AND REPAIR SERVICES
Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel, per diem, fuel, and mileage), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide all identified services.
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
All CDCR estimated quantities and Contractor provided rates are for the entire term of this agreement.
Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations.
The California Department of Corrections and Rehabilitation (CDCR) reserves the right to augment the Master Agreement dollar amount by 25% - 100% of the total bid amount.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt =%
In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss.
There are no guarantees that any services will be requested from this agreement.
1. AVENAL STATE PRISON (ASP)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 15KV- Westinghousex1x3=$ - 0
2Switchgear 12KV - Westinghousex4x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx26x3=$ - 0
4westinghouse 50/51 relaysx20x3=$ - 0
5ABB/ITE 32 relaysx1x3=$ - 0
6ABB/ITE 40 relaysx2x3=$ - 0
7ABB/ITE 46 relaysx2x3=$ - 0
8current transformersx10x3=$ - 0
9potential transformersx9x3=$ - 0
10megawatt meter (0-20)x2x3=$ - 0
11megawatt meter (0-5)x1x3=$ - 0
12ammeter (0-200)x5x3=$ - 0
13ammeter (0-400)x3x3=$ - 0
14ammeter (0-4000)x2x3=$ - 0
15ammeter (0-3000)x1x3=$ - 0
16kilovolt meter (range 0-15)x5x3=$ - 0
17marathon battery chargerx1x3=$ - 0
18battery bankx1x3=$ - 0
19Control and Instrument Switchesx15x3=$ - 0
20Time delay starting/closing relayx20x3=$ - 0
21Interlocking relayx15x3=$ - 0
22Rate of change relayx2x3=$ - 0
23Distance relayx1x3=$ - 0
24Monitor relayx2x3=$ - 0
25Volz per hertz relayx2x3=$ - 0
26Undervoltage relayx1x3=$ - 0
27Static frequency relayx2x3=$ - 0
28Directional power relayx2x3=$ - 0
29Undercurrent/underpower relayx2x3=$ - 0
30Field over/under excitation relayx2x3=$ - 0
31Unit sequence starting relayx1x3=$ - 0
32Reverse phase or Phase balance current relayx2x3=$ - 0
33phase sequence or phase balance voltage relayx2x3=$ - 0
34Incomplete sequence relayx2x3=$ - 0
35Transformer thermal relayx1x3=$ - 0
36Instantaneous overcurrent relayx2x3=$ - 0
37AC inverse time overcurrent relayx2x3=$ - 0
38Exciter or DC generator relayx2x3=$ - 0
39Power factor relayx2x3=$ - 0
40Field application relayx2x3=$ - 0
41Rectification failure relayx1x3=$ - 0
42Overvoltage relayx2x3=$ - 0
43Voltage or current balance relayx2x3=$ - 0
44Time delay stopping or opening relayx12x3=$ - 0
45Ground detector relayx2x3=$ - 0
46AC directional overcurrent relayx3x3=$ - 0
47Blocking relayx1x3=$ - 0
48Alarm relayx11x3=$ - 0
49DC overcurrent relayx3x3=$ - 0
50Phase angle measuring or out of step relayx2x3=$ - 0
51AC closing relayx2x3=$ - 0
52Frequency relayx2x3=$ - 0
53DC reclosing relayx2x3=$ - 0
54Automatic selective control or transfer relayx2x3=$ - 0
55Lockout relayx2x3=$ - 0
56Differential protective relayx3x3=$ - 0
57Voltage directional relayx2x3=$ - 0
58Voltage and power directional relayx2x3=$ - 0
59Tripping or trip free relayx2x3=$ - 0
60Busbar trip lockout relayx2x3=$ - 0
61Voltage and ampere metersx12x3=$ - 0
62Control transformersx2x3=$ - 0
63Instrument transformers (CT's, PT's)x2x3=$ - 0
64Potential transformersx2x3=$ - 0
65Control and Instrument Switchesx6x3=$ - 0
66Position Switchx6x3=$ - 0
67Position changing mechanismx3x3=$ - 0
68Generator step up transformersx1x3=$ - 0
69Battery chargerx3x3=$ - 0
70Batteriesx88x3=$ - 0
71Starter-motor control-voltage 480x2x3=$ - 0
72Main circuit breaker-voltage 480x2x3=$ - 0
73Circuit breaker- voltage 480x2x3=$ - 0
74Voltage Regulatorx2x3=$ - 0
75Miscellaneousx25x1=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 15kv westinghouse vaccuumx7x3=$ - 0
2Associated Componentsx10x1=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - 2500kva & 3000kvax2x3=$ - 0
2Oil-Filled Transformer - 75kva - 750 kvax31x3=$ - 0
3Dry Type Transformer - 30kva-1000kvax13x3=$ - 0
4Oil Samplingx33x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 15kv, 200 ampx2x3=$ - 0
2Bypass Isolation Switch - Voltage 15kvax3x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1PM Polesx114x3=$ - 0
2PM Cut-outsx21x3=$ - 0
3PM Medium Voltage Disconnect Switchesx22x3=$ - 0
4PM Pole Top Switches Air Loopx9x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx60=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$75,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

ASP TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

2. CALIPATRIA STATE PRISON (CAL)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 15kV- Westinghousex1x3=$ - 0
2Main Switchgear 12.4kV- ASCO / CGIx2x3=$ - 0
3Switchgear 480V - CGIx1x3=$ - 0
4Switchgear Filter, Lights, & Other Componentsx200x3=$ - 0
5Time Delay Starting/Closing Relay - 2x6x3=$ - 0
6Interlocking Relay - 3x8x3=$ - 0
7Voltz per Hertz Relay - 24x8x3=$ - 0
8Undervoltage Relay - 27x6x3=$ - 0
9Static Frequency Relay - 31x6x3=$ - 0
10Undercurrent/Underpower Relay - 37x6x3=$ - 0
11Field Over/Under Excitation Relay - 40x8x3=$ - 0
12Unit Sequence Starting Relay - 44x3x3=$ - 0
13Incomplete Sequence Relay - 48x6x3=$ - 0
14Transformer Thermal Relay - 49x8x3=$ - 0
15Instantaneous Overcurrent Relay - 50x12x3=$ - 0
16AC Inverse Time Overcurrent Relay - 51x12x3=$ - 0
17Exciter or DC Generator Relay - 53x4x3=$ - 0
18Power Factor Relay - 55x4x3=$ - 0
19Overvoltage Relay - 59x4x3=$ - 0
20Voltage or Current Balance Relay - 60x4x3=$ - 0
21Ground Detector Relay - 64x8x3=$ - 0
22Alarm Relay - 74x6x3=$ - 0
23Frequency Relay - 81x8x3=$ - 0
24Lockout Relay - 86x4x3=$ - 0
25Differential Protective Relay - 87x12x3=$ - 0
26Busbar Trip Lockout Relay - 96x8x3=$ - 0
27Voltage and Ampere Metersx8x3=$ - 0
28Control Transformersx10x3=$ - 0
29Instrument Transformers (CT’s, PT’s)x30x3=$ - 0
30Potential Transformersx6x3=$ - 0
31Control and Instrument Switchesx80x3=$ - 0
32Position Switchx30x3=$ - 0
33Position Changing Mechanismx6x3=$ - 0
34Generator Step-Up Transformersx2x3=$ - 0
35Battery Chargerx8x3=$ - 0
36Batteriesx60x3=$ - 0
37Main Circuit Breaker - Voltage 12Kx5x3=$ - 0
38Circuit Breaker - Voltage 12K&480Vx25x3=$ - 0
39Voltage Regulatorx6x3=$ - 0
40LOAD SHARE SPEED CONTROLx4x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Selector Switchesx33x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 12K&480Vx29x3=$ - 0
TRANSFORMERS
1Oil-Filled Transformer - Voltage 12k/480/208 Vx47x3=$ - 0
2Dry Type Transformer - Voltage 12K/480Vx3x3=$ - 0
3Oil Samplingx85x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 12K/480Vx3x3=$ - 0
2Bypass Isolation Switch - Voltage 12K/480Vx3x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx3x3=$ - 0
2Load Interruptors/LOAD BREAKx3x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx200=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx200=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx100=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$75,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CAL TOTAL BASIS OF AWARD (A+B+C+D) $ - 0

3. CALIFORNIA CORRECTIONAL CENTER (CCC) (managed by High Desert State Prison)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICEXESTIMATED QUANTITYXESTIMATED
NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 15kV- ASCOx1x3=$ - 0
2Switchgear 5kV - Oilfield Electric-Marinex1x3=$ - 0
9Voltz per Hertz Relay - 24x1x3=$ - 0
10Undervoltage Relay - 27x2x3=$ - 0
12Directional Power Relay - 32x2x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x2x3=$ - 0
19Transformer Thermal Relay - 49x1x3=$ - 0
20Instantaneous Overcurrent Relay - 50/51x16x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x12x3=$ - 0
26Overvoltage Relay - 59x1x3=$ - 0
36Frequency Relay - 81x1x3=$ - 0
39Lockout Relay - 86x2x3=$ - 0
40Differential Protective Relay - 87x2x3=$ - 0
45Voltage and Ampere Metersx53x3=$ - 0
47Instrument Transformers CT’sx33x3=$ - 0
48Potential Transformersx15x3=$ - 0
49Control and Instrument Switchesx42x3=$ - 0
50Position Switchx12x3=$ - 0
53Battery Charger ALCADx2x3=$ - 0
54Batteries ALCAD M190Px92x3=$ - 0
56Main Circuit Breaker - Voltage 15KVx2x3=$ - 0
57Circuit Breaker - Voltage 15KVx8x3=$ - 0
58Voltage Regulatorx2x3=$ - 0
59Main Circuit Breaker - Voltage 5KVx1x3=$ - 0
60Circuit Breaker - Voltage 5KVx5x3=$ - 0
TRANSFORMERS
1Oil-Filled Transformer - Voltage 12.5/480,208x38x3=$ - 0
2Oil-Filled Transformer - Voltage 4160/480,208x26x3=$ - 0
3Dry Type Transformer - Voltage 12.5/480x6x3=$ - 0
4Dry Type Transformer - Voltage 4160/208,480x11x3=$ - 0
5Oil Samplingx38x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 480x2x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx21x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx2x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx233x3=$ - 0
2Fusesx191x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx240=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx80=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00
CCC TOTAL BASIS OF AWARD (A+B+C+D)=$ - 0
4. CALIFORNIA CORRECTIONAL INSTITUTION (CCI)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED
NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear - 4,160 V Russ Electricx1x3=$ - 0
2Switchgear Industrial Electric, RSE sierra 4,160 Vx1x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx10x3=$ - 0
4Time Delay Starting/Closing Relay - 2x5x3=$ - 0
5Interlocking Relay - 3x5x3=$ - 0
6Rate of Change Relay - 7x5x3=$ - 0
7Distance Relay 21x5x3=$ - 0
8Monitor Relay - 25x5x3=$ - 0
9Voltz per Hertz Relay - 24x5x3=$ - 0
10Undervoltage Relay - 27x5x3=$ - 0
11Static Frequency Relay - 31x5x3=$ - 0
12Directional Power Relay - 32x5x3=$ - 0
13Undercurrent/Underpower Relay - 37x5x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
15Unit Sequence Starting Relay - 44x5x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x2x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x5x3=$ - 0
18Incomplete Sequence Relay - 48x5x3=$ - 0
19Transformer Thermal Relay - 49x5x3=$ - 0
20Instantaneous Overcurrent Relay - 50x5x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x5x3=$ - 0
22Exciter or DC Generator Relay - 53x2x3=$ - 0
23Power Factor Relay - 55x2x3=$ - 0
24Field Application Relay - 56x2x3=$ - 0
25Rectification Failure Relay - 58x2x3=$ - 0
26Overvoltage Relay - 59x2x3=$ - 0
27Voltage or Current Balance Relay - 60x2x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x5x3=$ - 0
29Ground Detector Relay - 64x2x3=$ - 0
30AC Directional Overcurrent Relay - 64x2x3=$ - 0
31Blocking Relay - 68x2x3=$ - 0
32Alarm Relay - 74x2x3=$ - 0
33DC Overcurrent Relay - 76x2x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x5x3=$ - 0
36Frequency Relay - 81x2x3=$ - 0
37DC Reclosing Relay - 82x5x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x2x3=$ - 0
39Lockout Relay - 86x5x3=$ - 0
40Differential Protective Relay - 87x2x3=$ - 0
41Voltage Directional Relay - 91x2x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x2x3=$ - 0
45Voltage and Ampere Metersx4x3=$ - 0
46Control Transformersx3x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x3x3=$ - 0
48Potential Transformersx3x3=$ - 0
49Control and Instrument Switchesx10x3=$ - 0
50Position Switchx5x3=$ - 0
51Position Changing Mechanismx5x3=$ - 0
52Generator Step-Up Transformersx1x3=$ - 0
53Battery Chargerx2x3=$ - 0
54Batteriesx24x3=$ - 0
55Main Circuit Breaker - 4160x4x3=$ - 0
56Circuit Breaker - Voltage 4160x1x3=$ - 0
57Voltage Regulatorx2x3=$ - 0
VACUUM SWITCHES
3Bypass Isolation Switchx2x3=$ - 0
4Knife Switchx8x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 4160vx5x3=$ - 0
2Associated Componentsx5x3=$ - 0
TRANSFORMERS
1Pad Mounted Oil-Filled Transformer - 12 kVx22x3=$ - 0
2Pole Mounted Oil-Filled Transformer - 12 kVx3x3=$ - 0
3Dry Type Transformer - 4,160 Vx15x3=$ - 0
4Dry Type Transformer - 2,400 Vx5x3=$ - 0
5Pad mounted Oil-Filled Transformer - 2,400 Vx11x3=$ - 0
6Pad mounted Oil-Filled Transformer - 4,160 Vx4x3=$ - 0
7Pole mounted Oil-Filled Transformer - 2,400 Vx2x3=$ - 0
8Pole mounted Oil-Filled Transformer- 4,160 Vx12x3=$ - 0
9Oil Samplingx54x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 4,160 Vx2x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switch (Air)x1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Arms (Poles)x105x3=$ - 0
2Fuses (Cut outs)x41x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx200=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx200=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx100=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00
CCI TOTAL BASIS OF AWARD (A+B+C+D) =$ - 0
5. CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICEXESTIMATED QUANTITYXESTIMATED
NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 12kV- General Electricx1x4=$ - 0
2Energize and/or De-Energize 12kv Switchgear Circuit Breakersx6x16=$ - 0
3Switchgear Filter, Lights, & Other Componentsx2x3=$ - 0
4Time Delay Starting/Closing Relay - 2x2x3=$ - 0
5Interlocking Relay - 3x1x3=$ - 0
6Rate of Change Relay - 7x1x3=$ - 0
7Distance Relay 21x1x3=$ - 0
8Monitor Relay - 25x12x3=$ - 0
9Volts per Hertz Relay - 24x12x3=$ - 0
10Under voltage Relay - 27x12x3=$ - 0
11Static Frequency Relay - 31x12x3=$ - 0
12Directional Power Relay - 32x12x3=$ - 0
13Undercurrent/Under power Relay - 37x12x3=$ - 0
14Field Over/Under Excitation Relay - 40x12x3=$ - 0
15Unit Sequence Starting Relay - 44x12x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x12x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x12x3=$ - 0
18Incomplete Sequence Relay - 48x12x3=$ - 0
19Transformer Thermal Relay - 49x12x3=$ - 0
20Instantaneous Overcurrent Relay - 50x12x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x12x3=$ - 0
22Exciter or DC Generator Relay - 53x12x3=$ - 0
23Power Factor Relay - 55x12x3=$ - 0
24Field Application Relay - 56x12x3=$ - 0
25Rectification Failure Relay - 58x12x3=$ - 0
26Overvoltage Relay - 59x12x3=$ - 0
27Voltage or Current Balance Relay - 60x12x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x12x3=$ - 0
29Ground Detector Relay - 64x12x3=$ - 0
30AC Directional Overcurrent Relay - 64x12x3=$ - 0
31Blocking Relay - 68x12x3=$ - 0
32Alarm Relay - 74x12x3=$ - 0
33DC Overcurrent Relay - 76x2x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x4x3=$ - 0
36Frequency Relay - 81x12x3=$ - 0
37DC Reclosing Relay - 82x4x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x4x3=$ - 0
39Lockout Relay - 86x4x3=$ - 0
40Differential Protective Relay - 87x12x3=$ - 0
41Voltage Directional Relay - 91x12x3=$ - 0
42Voltage and Power Directional Relay - 92x12x3=$ - 0
43Tripping or Trip-Free Relay - 94x12x3=$ - 0
44Bus bar Trip Lockout Relay - 96x12x3=$ - 0
45Voltage and Ampere Metersx12x3=$ - 0
46Control Transformersx4x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x12x3=$ - 0
48Potential Transformersx12x3=$ - 0
49Control and Instrument Switchesx12x3=$ - 0
50Position Switchx30x3=$ - 0
51Position Changing Mechanismx12x3=$ - 0
52Generator Step-Up Transformersx1x3=$ - 0
53Battery Chargerx2x3=$ - 0
54Batteriesx48x3=$ - 0
55Main Circuit Breaker - Voltage 15 KVx1x3=$ - 0
56Breaker 1200 AMP GE Mod V81138-500x6x3=$ - 0
VACUUM SWITCHES
1Gas Insulated Vacuum Switchx18x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 480x150x3=$ - 0
2Associated Componentsx150x3=$ - 0
TRANSFORMERS
1Oil-Filled Transformer - Voltage 15 KVx50x3=$ - 0
2Oil Samplingx50x3=$ - 0
3Fusesx150x3=$ - 0
4Other Componentsx50x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 15 KVx1x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx1x3=$ - 0
2Load Interrupters ( Load Breaks )x300x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx160=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx160=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CCWF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

6. CENTINELA STATE PRISON (CEN)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 15 kV- CGIx1x3=$ - 0
2Switchgear Filter, Lights, & Other Componentsx26x3=$ - 0
3Time Delay Starting/Closing Relay - 2x2x3=$ - 0
4Undervoltage Relay - 27x4x3=$ - 0
5Phase-Sequence or Phase-Balance Voltage Relay- 47x1x3=$ - 0
6Instantaneous Overcurrent Relay - 50x40x3=$ - 0
7AC Inverse Time Overcurrent Relay - 51x13x3=$ - 0
8Frequency Relay - 81x36x3=$ - 0
9Lockout Relay - 86x4x3=$ - 0
10Differential Protective Relay - 87x12x3=$ - 0
11Tripping or Trip-Free Relay - 94x1x3=$ - 0
12Voltage and Ampere Metersx16x3=$ - 0
13Control Transformersx1x3=$ - 0
14Instrument Transformers (CT’s, PT’s)x4x3=$ - 0
15Control and Instrument Switchesx14x3=$ - 0
16Position Changing Mechanismx15x3=$ - 0
17Generator Step-Up Transformersx1x3=$ - 0
18Battery Chargerx2x3=$ - 0
19Batteriesx24x3=$ - 0
20Starter - Motor Control - 24 VDCx2x3=$ - 0
21Voltage Regulatorx2x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - 12 Kvx12x3=$ - 0
TRANSFORMERS
1Dry Type Transformer - 12,500 Kv to 480 Vx48x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx100=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx100=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx100=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00
CEN TOTAL BASIS OF AWARD (A+B+C+D)=$ - 0
7. CALIFORNIA HEALTH CARE FACILITY (CHCF)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR BUILDING
1489 Generator Management Relaysx6x3=$ - 0
2735 Feeder Potection Relaysx17x3=$ - 0
3750 Feeder Management Relaysx1x3=$ - 0
412 KV Breakers and Associated PT’s and CT’sx24x3=$ - 0
5ASCO Touchscreen Monitors and Associated Parts (power supply, etc.)x2x3=$ - 0
6DC Battery Chargersx2x3=$ - 0
7DC Batteriesx112x3=$ - 0
8Oil Filled Transformer 12kvx58x3=$ - 0
9Oil Samplingx58x3=$ - 0
10Automatic Transfer Switch 480vx75x3=$ - 0
HIGH VOLTAGE YARD
1112 KV Breakerx1x3=$ - 0
12Circuit Switcherx1x3=$ - 0
13Air Switchx1x3=$ - 0
14Voltage Regulatorsx3x3=$ - 0
15DC Batteriesx24x3=$ - 0
16Battery Chargerx1x3=$ - 0
17Oil Samplingx1x3=$ - 0
18509 ITM Intelligent Transformer Monitorx1x3=$ - 0
19Transformer 115kvx1x3=$ - 0
20Schweitzer Engineering Labratories SEL-735 Power Quality & Revenue Meterx1x3=$ - 0
21Schweitzer Engineering Laboratories SEL-351 Protection Systemx3x3=$ - 0
22Schweitzer Engineering Laboratories SEL-387 Current Differential Relayx1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1Scheduled - Normal Business Hoursx300=$ - 0
2Emergency Repairsx75=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CHCF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

8. CALIFORNIA INSTITUTION FOR MEN (CIM)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 5kV- Brand N/Ax3x3=$ - 0
2Switchgear 2400kV - Brand N/Ax27x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx27x3=$ - 0
4Time Delay Starting/Closing Relay - 2x3x3=$ - 0
5Interlocking Relay - 3x3x3=$ - 0
6Rate of Change Relay - 7x2x3=$ - 0
7Distance Relay 21x6x3=$ - 0
8Monitor Relay - 25x6x3=$ - 0
9Voltz per Hertz Relay - 24x4x3=$ - 0
10Undervoltage Relay - 27x4x3=$ - 0
11Static Frequency Relay - 31x4x3=$ - 0
12Directional Power Relay - 32x6x3=$ - 0
13Field Over/Under Excitation Relay - 40x4x3=$ - 0
14Unit Sequence Starting Relay - 44x3x3=$ - 0
15Reverse-phase or Phase-Balance Current Relay - 46x1x3=$ - 0
16Incomplete Sequence Relay - 48x6x3=$ - 0
17Transformer Thermal Relay - 49x6x3=$ - 0
18Instantaneous Overcurrent Relay - 50x6x3=$ - 0
19AC Inverse Time Overcurrent Relay - 51x3x3=$ - 0
20Exciter or DC Generator Relay - 53x3x3=$ - 0
21Power Factor Relay - 55x3x3=$ - 0
22Field Application Relay - 56x3x3=$ - 0
23Rectification Failure Relay - 58x3x3=$ - 0
24Overvoltage Relay - 59x6x3=$ - 0
25Voltage or Current Balance Relay - 60x6x3=$ - 0
26Time-Delay Stopping or Opening Relay - 62x3x3=$ - 0
27Ground Detector Relay - 64x6x3=$ - 0
28AC Directional Overcurrent Relay - 64x3x3=$ - 0
29Blocking Relay - 68x3x3=$ - 0
30Alarm Relay - 74x3x3=$ - 0
31DC Overcurrent Relay - 76x3x3=$ - 0
32Phase-Angle Measuring or Out-of-Step Relay - 78x1x3=$ - 0
33AC Closing Relay - 79x3x3=$ - 0
34Frequency Relay - 81x3x3=$ - 0
35DC Reclosing Relay - 82x3x3=$ - 0
36Automatic Selective Control or Transfer Relay - 83x1x3=$ - 0
37Lockout Relay - 86x3x3=$ - 0
38Differential Protective Relay - 87x3x3=$ - 0
39Voltage Directional Relay - 91x3x3=$ - 0
40Voltage and Power Directional Relay - 92x3x3=$ - 0
41Tripping or Trip-Free Relay - 94x3x3=$ - 0
42westinghouse/siemans 50/51 relaysx77x3=$ - 0
43ABB/ITE 32 relaysx8x3=$ - 0
44ABB/ITE 40 relaysx8x3=$ - 0
45ABB/ITE 46 relaysx8x3=$ - 0
46current transformersx6x3=$ - 0
47potential transformersx12x3=$ - 0
48megawatt meter (0-20)x3x3=$ - 0
49megawatt meter (0-5)x3x3=$ - 0
50ammeter (0-200)x3x3=$ - 0
51ammeter (0-400)x3x3=$ - 0
52ammeter (0-4000)x3x3=$ - 0
53ammeter (0-3000)x3x3=$ - 0
54kilovolt meter (range 0-15)x3x3=$ - 0
55Battery chargerx6x3=$ - 0
56Batteryx6x3=$ - 0
57Control and Instrument Switchesx13x3=$ - 0
VACUUM SWITCHES
1Pad Mounted Sectionalizing Isolation Switch 2400Vx27x3=$ - 0
2Load Breaksx54x3=$ - 0
CIRCUIT BREAKER
1H. V. vacuum breakers 2400Vx15x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - Voltage 12.4 KV/2400Vx1x3=$ - 0
2Oil-Filled Transformer - 2400Vx3x3=$ - 0
3Dry Type Transformer - Voltage 25KVA/500KVAx15x3=$ - 0
4Oil Samplingx3x3=$ - 0
5Instrument Transformers (CT’s, PT’s)x6x6=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltagex3x3=$ - 0
2Bypass Isolation Switch - Voltage 12400V/2400Vx3x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx29x3=$ - 0
2Load Interruptorsx27x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - (1500KVAR 5-STEP)x3x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx174x3=$ - 0
2Fuses cut outsx38x3=$ - 0
3load break w/operating handle (air switches) 2400Vx13x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx260=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx180=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx80=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CIM TOTAL BASIS OF AWARD (A+B+C+D) $ - 0

9. CALIFORNIA INSTITUTION FOR WOMEN (CIW)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 4,160 V- G.E.x4x3=$ - 0
2Switchgear kV - Brand see attachmentx3x3=$ - 0
3Switchgear Filter, Lights, & Other Components ( 3 sets)x3x3=$ - 0
4Time Delay Starting/Closing Relay - 2x3x3=$ - 0
5Interlocking Relay - 3x13x3=$ - 0
6Monitor Relay - 25x3x3=$ - 0
7Voltz per Hertz Relay - 24x4x3=$ - 0
8Undervoltage Relay - 27x2x3=$ - 0
9Static Frequency Relay - 31x4x3=$ - 0
10Undercurrent/Underpower Relay - 37x2x3=$ - 0
11Field Over/Under Excitation Relay - 40x3x3=$ - 0
12Reverse-phase or Phase-Balance Current Relay - 46x1x3=$ - 0
13Instantaneous Overcurrent Relay - 50x18x3=$ - 0
14Power Factor Relay - 55x3x3=$ - 0
15Voltage or Current Balance Relay - 60x3x3=$ - 0
16Time-Delay Stopping or Opening Relay - 62x3x3=$ - 0
17Alarm Relay - 74x3x3=$ - 0
18AC Closing Relay - 79x8x3=$ - 0
19Frequency Relay - 81x3x3=$ - 0
20Automatic Selective Control or Transfer Relay - 83x4x3=$ - 0
21Lockout Relay - 86x9x3=$ - 0
22Tripping or Trip-Free Relay - 94x6x3=$ - 0
23Voltage and Ampere Metersx4x3=$ - 0
24Control Transformersx3x3=$ - 0
25Instrument Transformers (CT’s, PT’s)x3x3=$ - 0
26Potential Transformersx3x3=$ - 0
27Control and Instrument Switchesx6x3=$ - 0
28Position Switchx6x3=$ - 0
29Battery Chargerx1x3=$ - 0
30Batteriesx18x3=$ - 0
31Starter - Motor Controlx3x3=$ - 0
32Main Circuit Breaker - see attachmentx1x3=$ - 0
33Circuit Breaker - Voltagex17x3=$ - 0
34Voltage Regulatorx3x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switchx6x3=$ - 0
2Bypass Isolation Switchx6x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage see attachmentx18x3=$ - 0
TRANSFORMERS
2Oil-Filled Transformerx23x3=$ - 0
3Dry Type Transformerx1x3=$ - 0
4Oil Samplingx23x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 277-480 Vx3x3=$ - 0
2Bypass Isolation Switch - 277-480 Vx6x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx3x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx80=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00
CIW TOTAL BASIS OF AWARD (A+B+C+D)=$ - 0
10. CALIFORNIA MEN'S COLONY (CMC)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgearx4x3=$ - 0
2Switchgear Filter, Lights, & Other Componentsx4x3=$ - 0
3Control Transformersx5x3=$ - 0
4Starter - Motor Controlx15x3=$ - 0
5Main Circuit Breakerx25x3=$ - 0
6Circuit Breakerx25x3=$ - 0
7Voltage Regulatorx25x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformerx7x3=$ - 0
2Oil-Filled Transformerx18x3=$ - 0
3Dry Type Transformerx20x3=$ - 0
4Oil Samplingx25x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switchx8x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx6x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx65x3=$ - 0
2Fusesx195x3=$ - 0
3Other Componentsx200x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx60=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx80=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$100,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CMC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

11. CALIFORNIA MEDICAL FACILITY (CMF)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 12kV- Eatonx1x3=$ - 0
2Switchgear 4160v - Eatonx1x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx3x3=$ - 0
4Time Delay Starting/Closing Relay - 2x1x3=$ - 0
5Interlocking Relay - 3x4x3=$ - 0
6Rate of Change Relay - 7x2x3=$ - 0
7Distance Relay 21x21x3=$ - 0
8Monitor Relay - 25x1x3=$ - 0
9Voltz per Hertz Relay - 24x2x3=$ - 0
10Undervoltage Relay - 27x2x3=$ - 0
11Static Frequency Relay - 31x2x3=$ - 0
12Directional Power Relay - 32x1x3=$ - 0
13Undercurrent/Underpower Relay - 37x1x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
15Unit Sequence Starting Relay - 44x1x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x1x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x1x3=$ - 0
18Incomplete Sequence Relay - 48x1x3=$ - 0
19Transformer Thermal Relay - 49x1x3=$ - 0
20Instantaneous Overcurrent Relay - 50x14x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x1x3=$ - 0
22Exciter or DC Generator Relay - 53x8x3=$ - 0
23Power Factor Relay - 55x1x3=$ - 0
24Field Application Relay - 56x6x3=$ - 0
25Rectification Failure Relay - 58x3x3=$ - 0
26Overvoltage Relay - 59x2x3=$ - 0
27Voltage or Current Balance Relay - 60x2x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x6x3=$ - 0
29Ground Detector Relay - 64x9x3=$ - 0
30AC Directional Overcurrent Relay - 64x3x3=$ - 0
31Blocking Relay - 68x1x3=$ - 0
32Alarm Relay - 74x1x3=$ - 0
33DC Overcurrent Relay - 76x1x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x3x3=$ - 0
36Frequency Relay - 81x1x3=$ - 0
37DC Reclosing Relay - 82x3x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x1x3=$ - 0
39Lockout Relay - 86x1x3=$ - 0
40Differential Protective Relay - 87x1x3=$ - 0
41Voltage Directional Relay - 91x1x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x1x3=$ - 0
45Voltage and Ampere Metersx1x3=$ - 0
46Control Transformersx6x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x2x3=$ - 0
48Potential Transformersx2x3=$ - 0
49Control and Instrument Switchesx2x3=$ - 0
50Position Switchx2x3=$ - 0
51Position Changing Mechanismx3x3=$ - 0
52Generator Step-Up Transformersx3x3=$ - 0
53Battery Chargerx9x3=$ - 0
54Batteriesx36x3=$ - 0
SWITCHGEAR
55Starter - Motor Control - Voltage 120vx1x3=$ - 0
56Main Circuit Breaker - Voltage 4160vx1x3=$ - 0
57Circuit Breaker - Voltage 208vx1x3=$ - 0
58Voltage Regulatorx1x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switchx6x3=$ - 0
2Bypass Isolation Switchx1x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 4160vx1x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - Voltage 12k/4160vx2x3=$ - 0
2Oil-Filled Transformer - Voltage 4160/480x10x3=$ - 0
3Dry Type Transformer - Voltage 480/208/120x26x3=$ - 0
4Oil Samplingx12x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 4160vx1x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx3x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx2x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx30x90=$ - 0
2Fusesx3x9=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx60=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CMF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

12. CALIFORNIA STATE PRISON, CORCORAN (COR)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 12KV - GEx1x3=$ - 0
2General Electric Overcurrent Relay IFC 50/51x31x3=$ - 0
3General Electric Overcurrent Relay IFC 50/51Gx1x3=$ - 0
4Ammeterx13x3=$ - 0
5Kilowatt Meterx5x3=$ - 0
6Kilovoltmeterx2x3=$ - 0
7Beckwith Single Phase Programmable Relay M3420, #2299x1x3=$ - 0
8General Electric Overcurrent Relay 121AV51D1Ax1x3=$ - 0
9General Electric Differential Relay Type STD 87Tx3x3=$ - 0
10Emergency Switchgear 5KV - GEx1x3=$ - 0
11Mold Case Circuit Breaker Panelx1x3=$ - 0
12BBC Reverse Poser Relay 32Rx3x3=$ - 0
13BBC Negative Sequence Overcurrent Relay 46Qx3x3=$ - 0
14BBC Loss of Excitationx3x3=$ - 0
15BBC Differential Relay 87Mx3x3=$ - 0
16Basler BEI-51/27 R Relayx3x3=$ - 0
17Basler Ground Fault Overvoltage Relay 59Nx3x3=$ - 0
18AC Voltmetersx3x3=$ - 0
19Frequency Metersx5x3=$ - 0
20Synch Scope Relayx3x3=$ - 0
21Basler BEI-25 Synch Check Relayx1x3=$ - 0
22Basler BEI-51 Overcurrent Relayx1x3=$ - 0
23Basler BEI-59N Ground Fault Relayx1x3=$ - 0
24BBC Transformer Differential Relay 871x3x3=$ - 0
25Westinghouse-Ampgard 250 h.p., 4160 Volt Starterx1x3=$ - 0
26BBC Ground Fault Relay 6R-20x1x3=$ - 0
27Relay – Differential – Phase (Westinghouse)x3x3=$ - 0
28Relay – Over current (Westinghouse)x5x3=$ - 0
29Relay – Distance (Westinghouse)x1x3=$ - 0
30Relay – Reclosing (Westinghouse)x2x3=$ - 0
31Relay – Distance Timing (Westinghouse)x1x3=$ - 0
32Relay – Tripping (General Electric)x1x3=$ - 0
33Switch – Circuit Switcher (Electro-Switch)x1x3=$ - 0
34Switch – Manuel/Automatic Transfer (Electro-Switch)x1x3=$ - 0
35Meter – AMP 12 KV (Westinghouse)x1x3=$ - 0
36Relay – Reverse Power (Basler Electric)x1x3=$ - 0
37Meter – Demand Ampere (Sangamo)x1x3=$ - 0
38Substation Load Tap Changerx1x3=$ - 0
393 Phase High Voltage (12 KV) Mechanical Disconnectsx1x3=$ - 0
40Current Transformers/Potential Transformersx6x3=$ - 0
41Charger - Power Conversion Product Inc.” Mod# -FD-48-12B Ser#30405-1001x1x3=$ - 0
42Batteries – Keystone Mod# - PLA-120SLAx8x3=$ - 0
43Charger- Hindle Power Mod# 1SCRF048-12 Ser# 10055/490470 CIx1x3=$ - 0
44Batteries – Power Safe – C Cat# - 610127 - CWx8x3=$ - 0
45Charger-C&D Technologies Mod#-ARE-M13012A Ser#-HPS1252561x1x3=$ - 0
46Batteries-C&D Technologies Mod#-3DJ-110x20x3=$ - 0
CIRCUIT BREAKER
1General Electric 12KV Power VAC Circuit Breakerx8x3=$ - 0
2General Electric 5KV Power VAC Circuit Breakerx4x3=$ - 0
3Klochner Moeller – Series 200 480VAC 3 PHx1x3=$ - 0
TRANSFORMERS
1General Electric Heavy Duty Electric, Oil Filled Transformer (HV=115,000 GRDY/ 66,400 LV=12470Y/7200 X 4160Y/2400)x1x3=$ - 0
2General Electric Oil Filled Transformer (12.5KV/7.2-4 16KV)x1x3=$ - 0
3Westinghouse Oil Filled Transformer (12.5KV/7.2-4 16KV)x1x3=$ - 0
4MGM Oil Filled Transformer (4160 480y/277 750 KVA)x1x3=$ - 0
5PDT/USS OIL FILLED TRANSFORMER (KV/480)x75x3=$ - 0
610KVA GE Sub Polarity (HV-12470/2160Y – LV-277/480Y)x27x3=$ - 0
715KVA GE 1Phase Class – OA-237LB (HV – 12470/2160Y – LV – 277/480Y)x11x3=$ - 0
8Oil Samplingx117x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1ASCO Automatic Transfer Switch, AMP 1200, 480V - Hospitalx1x3=$ - 0
2ASCO Bypass Isolation Switch, AMP 400, 480V - Hospitalx1x3=$ - 0
3ASCO Bypass Isolation Switch, AMP 150, 480V - Hospitalx1x3=$ - 0
4Onan Transfer Switch Model OTCU400-6-146,277/400, 400 AMPx1x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
5Westinghouse Automatic Transfer Switch, Style No. 5T0326, 400AMP, 3PH Water Plantx1x3=$ - 0
6Square D Automatic Transfer Switch 260 A, 460V, Class 8901Cat#8901AG0360-3-480x1x3=$ - 0
7Asco Automatic Transfer Switchx1x3=$ - 0
CIRCUIT SWITCHER
1121 KV 3PH High Voltage Switchx1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx1x3=$ - 0
2Fusesx196x3=$ - 0
3Other Componentsx1x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx60=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

COR TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

13. CALIFORNIA REALITY BASED TRAINING CENTER (CRBTC)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgear 12kVx2x3=$ - 0
2Switchgear 12kV - Squre Dx1x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx40=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx1=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx40=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM$30,000.00

CRBTC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

14. CALIFORNIA REHABILITATION CENTER (CRC)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
SWITCHGEAR
1Main Switchgearx2x3=$ - 0
2Switchgearx3x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx2x3=$ - 0
4Time Delay Starting/Closing Relay - 2x4x3=$ - 0
5Rate of Change Relay - 7x4x3=$ - 0
6Monitor Relay - 25x2x3=$ - 0
7Directional Power Relay - 32x4x3=$ - 0
8Undercurrent/Underpower Relay - 37x1x3=$ - 0
9Field Over/Under Excitation Relay - 40x2x3=$ - 0
10Reverse-phase or Phase-Balance Current Relay - 46x4x3=$ - 0
11Incomplete Sequence Relay - 48x1x3=$ - 0
12Transformer Thermal Relay - 49x12x3=$ - 0
13Rectification Failure Relay - 58x2x3=$ - 0
14Voltage or Current Balance Relay - 60x2x3=$ - 0
15Time-Delay Stopping or Opening Relay - 62x2x3=$ - 0
16Alarm Relay - 74x1x3=$ - 0
17DC Overcurrent Relay - 76x2x3=$ - 0
18AC Closing Relay - 79x18x3=$ - 0
19Frequency Relay - 81x10x3=$ - 0
20Automatic Selective Control or Transfer Relay - 83x4x3=$ - 0
21Lockout Relay - 86x4x3=$ - 0
22Voltage and Ampere Metersx8x3=$ - 0
23Control Transformersx12x3=$ - 0
24Instrument Transformers (CT’s, PT’s)x4x3=$ - 0
25Potential Transformersx15x3=$ - 0
26Control and Instrument Switchesx4x3=$ - 0
27Position Switchx12x3=$ - 0
28Main Circuit Breakerx22x3=$ - 0
29Circuit Breakerx15x3=$ - 0
30Air Switchesx2x3=$ - 0
VACUUM SWITCHES
1Bypass Isolation Switchx8x3=$ - 0
2Air Switchesx20x3=$ - 0
TRANSFORMERS
1Dry Type Transformerx15x3=$ - 0
2Oil Samplingx1x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx16x3=$ - 0
2Relaysx10x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx25x3=$ - 0
2Fusesx10x3=$ - 0
3F6-PA-LS control Reclosurex2x3=$ - 0
TOTAL BID AMOUNT FOR SECTION (A)=$ - 0
B. REPAIRS
SERVICE DESCRIPTIONHOURLY RATExESTIMATE NUMBER OF HOURS=TOTAL
1High Voltage Routine Repairs - Scheduledx120=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx90=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx90=$ - 0
TOTAL BID AMOUNT FOR SECTION (B)=$ - 0
C. PARTS
ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM$50,000.00
D. EQUIPMENT RENTAL
ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING CONTRACT TERM$30,000.00

CRC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0

15. R.A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)
A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES
EQUIPMENT DESCRIPTIONCOST PER SERVICExESTIMATED QUANTITYxESTIMATED NUMBER OF SERVICES=TOTAL
CIRCUIT BREAKER
1Circuit Breaker - Voltage 480x6x3=$ - 0
2Associated Componentsx6x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 277-480x1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0