Addendum_1_Exhibit_B-1_Rate_Sheet_Fillable.xlsx
XLSX spreadsheet 230 KB Posted
- Solicitation number
- 0000033392
- Issued by
- California
About this file
This is a rate sheet exhibit for high voltage equipment maintenance and repair services across multiple California Department of Corrections and Rehabilitation (CDCR) facilities. The document details comprehensive preventative maintenance, inspection, and testing services for switchgear, vacuum switches, circuit breakers, transformers, automatic transfer switches, circuit switchers, capacitor banks, load recording, and power poles across 27 different correctional facilities. Services include both scheduled maintenance and emergency repairs during and outside normal business hours. The services cover thousands of individual pieces of equipment including main switchgears ranging from 4.16kV to 15kV, relays, transformers, and associated components.
The rate sheet requires bidders to provide per-service costs and hourly rates for repairs, with estimated service quantities and hours provided for each facility. Each facility has a designated parts allowance ranging from $50,000 to $100,000 and equipment rental allowance of $30,000-$75,000 for the contract term. Bidders may bid on one or more locations but must include rates for all items within that location. Zero dollar amounts are acceptable and interpreted as no-cost services. The CDCR reserves the right to augment the master agreement amount by 25-100% of the total bid amount, and contractors may offer discounts for invoices paid within 30 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_4.pdf | ||
| Addendum_2.pdf | ||
| Addendum_3.pdf | ||
| Addendum_4_Exhibit_B-1_Rate_Sheet_Fillable.xlsx | XLSX spreadsheet | |
| Addendum_1.pdf | ||
| C5612448-D_-_High_Voltage_IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rate Sheet
| HIGH VOLTAGE EQUIPMENT MAINTENANCE AND REPAIR SERVICES | |
| Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells. | |
| The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel, per diem, fuel, and mileage), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide all identified services. | |
| Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State. | |
| Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services. | |
| Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State. | |
| All CDCR estimated quantities and Contractor provided rates are for the entire term of this agreement. | |
| Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations. | |
| The California Department of Corrections and Rehabilitation (CDCR) reserves the right to augment the Master Agreement dollar amount by 25% - 100% of the total bid amount. | |
| Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00. | |
| Discount offered on invoices paid within 30 days of receipt = | % |
| In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss. |
| There are no guarantees that any services will be requested from this agreement. | ||||||||
| 1. AVENAL STATE PRISON (ASP) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 15KV- Westinghouse | x | 1 | x | 3 | = | $ - 0 | |
| 2 | Switchgear 12KV - Westinghouse | x | 4 | x | 3 | = | $ - 0 | |
| 3 | Switchgear Filter, Lights, & Other Components | x | 26 | x | 3 | = | $ - 0 | |
| 4 | westinghouse 50/51 relays | x | 20 | x | 3 | = | $ - 0 | |
| 5 | ABB/ITE 32 relays | x | 1 | x | 3 | = | $ - 0 | |
| 6 | ABB/ITE 40 relays | x | 2 | x | 3 | = | $ - 0 | |
| 7 | ABB/ITE 46 relays | x | 2 | x | 3 | = | $ - 0 | |
| 8 | current transformers | x | 10 | x | 3 | = | $ - 0 | |
| 9 | potential transformers | x | 9 | x | 3 | = | $ - 0 | |
| 10 | megawatt meter (0-20) | x | 2 | x | 3 | = | $ - 0 | |
| 11 | megawatt meter (0-5) | x | 1 | x | 3 | = | $ - 0 | |
| 12 | ammeter (0-200) | x | 5 | x | 3 | = | $ - 0 | |
| 13 | ammeter (0-400) | x | 3 | x | 3 | = | $ - 0 | |
| 14 | ammeter (0-4000) | x | 2 | x | 3 | = | $ - 0 | |
| 15 | ammeter (0-3000) | x | 1 | x | 3 | = | $ - 0 | |
| 16 | kilovolt meter (range 0-15) | x | 5 | x | 3 | = | $ - 0 | |
| 17 | marathon battery charger | x | 1 | x | 3 | = | $ - 0 | |
| 18 | battery bank | x | 1 | x | 3 | = | $ - 0 | |
| 19 | Control and Instrument Switches | x | 15 | x | 3 | = | $ - 0 | |
| 20 | Time delay starting/closing relay | x | 20 | x | 3 | = | $ - 0 | |
| 21 | Interlocking relay | x | 15 | x | 3 | = | $ - 0 | |
| 22 | Rate of change relay | x | 2 | x | 3 | = | $ - 0 | |
| 23 | Distance relay | x | 1 | x | 3 | = | $ - 0 | |
| 24 | Monitor relay | x | 2 | x | 3 | = | $ - 0 | |
| 25 | Volz per hertz relay | x | 2 | x | 3 | = | $ - 0 | |
| 26 | Undervoltage relay | x | 1 | x | 3 | = | $ - 0 | |
| 27 | Static frequency relay | x | 2 | x | 3 | = | $ - 0 | |
| 28 | Directional power relay | x | 2 | x | 3 | = | $ - 0 | |
| 29 | Undercurrent/underpower relay | x | 2 | x | 3 | = | $ - 0 | |
| 30 | Field over/under excitation relay | x | 2 | x | 3 | = | $ - 0 | |
| 31 | Unit sequence starting relay | x | 1 | x | 3 | = | $ - 0 | |
| 32 | Reverse phase or Phase balance current relay | x | 2 | x | 3 | = | $ - 0 | |
| 33 | phase sequence or phase balance voltage relay | x | 2 | x | 3 | = | $ - 0 | |
| 34 | Incomplete sequence relay | x | 2 | x | 3 | = | $ - 0 | |
| 35 | Transformer thermal relay | x | 1 | x | 3 | = | $ - 0 | |
| 36 | Instantaneous overcurrent relay | x | 2 | x | 3 | = | $ - 0 | |
| 37 | AC inverse time overcurrent relay | x | 2 | x | 3 | = | $ - 0 | |
| 38 | Exciter or DC generator relay | x | 2 | x | 3 | = | $ - 0 | |
| 39 | Power factor relay | x | 2 | x | 3 | = | $ - 0 | |
| 40 | Field application relay | x | 2 | x | 3 | = | $ - 0 | |
| 41 | Rectification failure relay | x | 1 | x | 3 | = | $ - 0 | |
| 42 | Overvoltage relay | x | 2 | x | 3 | = | $ - 0 | |
| 43 | Voltage or current balance relay | x | 2 | x | 3 | = | $ - 0 | |
| 44 | Time delay stopping or opening relay | x | 12 | x | 3 | = | $ - 0 | |
| 45 | Ground detector relay | x | 2 | x | 3 | = | $ - 0 | |
| 46 | AC directional overcurrent relay | x | 3 | x | 3 | = | $ - 0 | |
| 47 | Blocking relay | x | 1 | x | 3 | = | $ - 0 | |
| 48 | Alarm relay | x | 11 | x | 3 | = | $ - 0 | |
| 49 | DC overcurrent relay | x | 3 | x | 3 | = | $ - 0 | |
| 50 | Phase angle measuring or out of step relay | x | 2 | x | 3 | = | $ - 0 | |
| 51 | AC closing relay | x | 2 | x | 3 | = | $ - 0 | |
| 52 | Frequency relay | x | 2 | x | 3 | = | $ - 0 | |
| 53 | DC reclosing relay | x | 2 | x | 3 | = | $ - 0 | |
| 54 | Automatic selective control or transfer relay | x | 2 | x | 3 | = | $ - 0 | |
| 55 | Lockout relay | x | 2 | x | 3 | = | $ - 0 | |
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 56 | Differential protective relay | x | 3 | x | 3 | = | $ - 0 | |
| 57 | Voltage directional relay | x | 2 | x | 3 | = | $ - 0 | |
| 58 | Voltage and power directional relay | x | 2 | x | 3 | = | $ - 0 | |
| 59 | Tripping or trip free relay | x | 2 | x | 3 | = | $ - 0 | |
| 60 | Busbar trip lockout relay | x | 2 | x | 3 | = | $ - 0 | |
| 61 | Voltage and ampere meters | x | 12 | x | 3 | = | $ - 0 | |
| 62 | Control transformers | x | 2 | x | 3 | = | $ - 0 | |
| 63 | Instrument transformers (CT's, PT's) | x | 2 | x | 3 | = | $ - 0 | |
| 64 | Potential transformers | x | 2 | x | 3 | = | $ - 0 | |
| 65 | Control and Instrument Switches | x | 6 | x | 3 | = | $ - 0 | |
| 66 | Position Switch | x | 6 | x | 3 | = | $ - 0 | |
| 67 | Position changing mechanism | x | 3 | x | 3 | = | $ - 0 | |
| 68 | Generator step up transformers | x | 1 | x | 3 | = | $ - 0 | |
| 69 | Battery charger | x | 3 | x | 3 | = | $ - 0 | |
| 70 | Batteries | x | 88 | x | 3 | = | $ - 0 | |
| 71 | Starter-motor control-voltage 480 | x | 2 | x | 3 | = | $ - 0 | |
| 72 | Main circuit breaker-voltage 480 | x | 2 | x | 3 | = | $ - 0 | |
| 73 | Circuit breaker- voltage 480 | x | 2 | x | 3 | = | $ - 0 | |
| 74 | Voltage Regulator | x | 2 | x | 3 | = | $ - 0 | |
| 75 | Miscellaneous | x | 25 | x | 1 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | Circuit Breaker - Voltage 15kv westinghouse vaccuum | x | 7 | x | 3 | = | $ - 0 | |
| 2 | Associated Components | x | 10 | x | 1 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | Main Oil-Filled Transformer - 2500kva & 3000kva | x | 2 | x | 3 | = | $ - 0 | |
| 2 | Oil-Filled Transformer - 75kva - 750 kva | x | 31 | x | 3 | = | $ - 0 | |
| 3 | Dry Type Transformer - 30kva-1000kva | x | 13 | x | 3 | = | $ - 0 | |
| 4 | Oil Sampling | x | 33 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch - 15kv, 200 amp | x | 2 | x | 3 | = | $ - 0 | |
| 2 | Bypass Isolation Switch - Voltage 15kva | x | 3 | x | 3 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | N/A | |||||||
| CAPACITOR BANK | ||||||||
| 1 | N/A | |||||||
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | PM Poles | x | 114 | x | 3 | = | $ - 0 | |
| 2 | PM Cut-outs | x | 21 | x | 3 | = | $ - 0 | |
| 3 | PM Medium Voltage Disconnect Switches | x | 22 | x | 3 | = | $ - 0 | |
| 4 | PM Pole Top Switches Air Loop | x | 9 | x | 3 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 150 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 60 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $75,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
ASP TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 2. CALIPATRIA STATE PRISON (CAL) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 15kV- Westinghouse | x | 1 | x | 3 | = | $ - 0 | |
| 2 | Main Switchgear 12.4kV- ASCO / CGI | x | 2 | x | 2 | = | $ - 0 | |
| 3 | Switchgear 480V - CGI | x | 1 | x | 2 | = | $ - 0 | |
| 4 | Switchgear Filter, Lights, & Other Components | x | 200 | x | 2 | = | $ - 0 | |
| 5 | Time Delay Starting/Closing Relay - 2 | x | 6 | x | 2 | = | $ - 0 | |
| 6 | Interlocking Relay - 3 | x | 8 | x | 2 | = | $ - 0 | |
| 7 | Voltz per Hertz Relay - 24 | x | 8 | x | 2 | = | $ - 0 | |
| 8 | Undervoltage Relay - 27 | x | 6 | x | 2 | = | $ - 0 | |
| 9 | Static Frequency Relay - 31 | x | 6 | x | 2 | = | $ - 0 | |
| 10 | Undercurrent/Underpower Relay - 37 | x | 6 | x | 2 | = | $ - 0 | |
| 11 | Field Over/Under Excitation Relay - 40 | x | 8 | x | 2 | = | $ - 0 | |
| 12 | Unit Sequence Starting Relay - 44 | x | 3 | x | 2 | = | $ - 0 | |
| 13 | Incomplete Sequence Relay - 48 | x | 6 | x | 2 | = | $ - 0 | |
| 14 | Transformer Thermal Relay - 49 | x | 8 | x | 2 | = | $ - 0 | |
| 15 | Instantaneous Overcurrent Relay - 50 | x | 12 | x | 2 | = | $ - 0 | |
| 16 | AC Inverse Time Overcurrent Relay - 51 | x | 12 | x | 2 | = | $ - 0 | |
| 17 | Exciter or DC Generator Relay - 53 | x | 4 | x | 2 | = | $ - 0 | |
| 18 | Power Factor Relay - 55 | x | 4 | x | 2 | = | $ - 0 | |
| 19 | Overvoltage Relay - 59 | x | 4 | x | 2 | = | $ - 0 | |
| 20 | Voltage or Current Balance Relay - 60 | x | 4 | x | 2 | = | $ - 0 | |
| 21 | Ground Detector Relay - 64 | x | 8 | x | 2 | = | $ - 0 | |
| 22 | Alarm Relay - 74 | x | 6 | x | 2 | = | $ - 0 | |
| 23 | Frequency Relay - 81 | x | 8 | x | 2 | = | $ - 0 | |
| 24 | Lockout Relay - 86 | x | 4 | x | 2 | = | $ - 0 | |
| 25 | Differential Protective Relay - 87 | x | 12 | x | 2 | = | $ - 0 | |
| 26 | Busbar Trip Lockout Relay - 96 | x | 8 | x | 2 | = | $ - 0 | |
| 27 | Voltage and Ampere Meters | x | 8 | x | 2 | = | $ - 0 | |
| 28 | Control Transformers | x | 10 | x | 2 | = | $ - 0 | |
| 29 | Instrument Transformers (CT’s, PT’s) | x | 30 | x | 2 | = | $ - 0 | |
| 30 | Potential Transformers | x | 6 | x | 2 | = | $ - 0 | |
| 31 | Control and Instrument Switches | x | 80 | x | 2 | = | $ - 0 | |
| 32 | Position Switch | x | 30 | x | 2 | = | $ - 0 | |
| 33 | Position Changing Mechanism | x | 6 | x | 2 | = | $ - 0 | |
| 34 | Generator Step-Up Transformers | x | 2 | x | 2 | = | $ - 0 | |
| 35 | Battery Charger | x | 8 | x | 3 | = | $ - 0 | |
| 36 | Batteries | x | 60 | x | 3 | = | $ - 0 | |
| 37 | Main Circuit Breaker - Voltage 12K | x | 5 | x | 2 | = | $ - 0 | |
| 38 | Circuit Breaker - Voltage 12K&480V | x | 25 | x | 2 | = | $ - 0 | |
| 39 | Voltage Regulator | x | 6 | x | 2 | = | $ - 0 | |
| 40 | LOAD SHARE SPEED CONTROL | x | 4 | x | 2 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | Liquid Insulated Selector Switches | x | 33 | x | 3 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | Circuit Breaker - Voltage 12K&480V | x | 29 | x | 3 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | Oil-Filled Transformer - Voltage 12k/480/208 V | x | 47 | x | 3 | = | $ - 0 | |
| 2 | Dry Type Transformer - Voltage 12K/480V | x | 3 | x | 3 | = | $ - 0 | |
| 3 | Oil Sampling | x | 85 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch - Voltage 12K/480V | x | 3 | x | 3 | = | $ - 0 | |
| 2 | Bypass Isolation Switch - Voltage 12K/480V | x | 3 | x | 3 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 3 | x | 2 | = | $ - 0 | |
| 2 | Load Interruptors/LOAD BREAK | x | 3 | x | 2 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | N/A | |||||||
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | N/A | |||||||
| TOTAL BID AMOUNT FOR SECTION (A) | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 200 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 200 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 100 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $75,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CAL TOTAL BASIS OF AWARD (A+B+C+D) $ - 0
| 3. CALIFORNIA CORRECTIONAL CENTER (CCC) (managed by High Desert State Prison) | |||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | |||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | X | ESTIMATED QUANTITY | X | ESTIMATED | ||||
| # OF SERVICES | = | TOTAL | |||||||
| SWITCHGEAR | |||||||||
| 1 | Main Switchgear 15kV- ASCO | x | 1 | x | 3 | = | $ - 0 | ||
| 2 | Switchgear 5kV - Oilfield Electric-Marine | x | 1 | x | 3 | = | $ - 0 | ||
| 9 | Voltz per Hertz Relay - 24 | x | 1 | x | 3 | = | $ - 0 | ||
| 10 | Undervoltage Relay - 27 | x | 2 | x | 3 | = | $ - 0 | ||
| 12 | Directional Power Relay - 32 | x | 2 | x | 3 | = | $ - 0 | ||
| 14 | Field Over/Under Excitation Relay - 40 | x | 1 | x | 3 | = | $ - 0 | ||
| 16 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 2 | x | 3 | = | $ - 0 | ||
| 19 | Transformer Thermal Relay - 49 | x | 1 | x | 3 | = | $ - 0 | ||
| 20 | Instantaneous Overcurrent Relay - 50/51 | x | 16 | x | 3 | = | $ - 0 | ||
| 21 | AC Inverse Time Overcurrent Relay - 51 | x | 12 | x | 3 | = | $ - 0 | ||
| 26 | Overvoltage Relay - 59 | x | 1 | x | 3 | = | $ - 0 | ||
| 36 | Frequency Relay - 81 | x | 1 | x | 3 | = | $ - 0 | ||
| 39 | Lockout Relay - 86 | x | 2 | x | 3 | = | $ - 0 | ||
| 40 | Differential Protective Relay - 87 | x | 2 | x | 3 | = | $ - 0 | ||
| 45 | Voltage and Ampere Meters | x | 53 | x | 3 | = | $ - 0 | ||
| 47 | Instrument Transformers CT’s | x | 33 | x | 3 | = | $ - 0 | ||
| 48 | Potential Transformers | x | 15 | x | 3 | = | $ - 0 | ||
| 49 | Control and Instrument Switches | x | 42 | x | 3 | = | $ - 0 | ||
| 50 | Position Switch | x | 12 | x | 3 | = | $ - 0 | ||
| 53 | Battery Charger ALCAD | x | 2 | x | 3 | = | $ - 0 | ||
| 54 | Batteries ALCAD M190P | x | 92 | x | 3 | = | $ - 0 | ||
| 56 | Main Circuit Breaker - Voltage 15KV | x | 2 | x | 3 | = | $ - 0 | ||
| 57 | Circuit Breaker - Voltage 15KV | x | 8 | x | 3 | = | $ - 0 | ||
| 58 | Voltage Regulator | x | 2 | x | 3 | = | $ - 0 | ||
| 59 | Main Circuit Breaker - Voltage 5KV | x | 1 | x | 3 | = | $ - 0 | ||
| 60 | Circuit Breaker - Voltage 5KV | x | 5 | x | 3 | = | $ - 0 | ||
| VACUUM SWITCHES | |||||||||
| 1 | N/A | ||||||||
| CIRCUIT BREAKER | |||||||||
| 1 | N/A | ||||||||
| TRANSFORMERS | |||||||||
| 1 | Oil-Filled Transformer - Voltage 12.5/480,208 | x | 38 | x | 1 | = | $ - 0 | ||
| 2 | Oil-Filled Transformer - Voltage 4160/480,208 | x | 26 | x | 1 | = | $ - 0 | ||
| 3 | Dry Type Transformer - Voltage 12.5/480 | x | 6 | x | 1 | = | $ - 0 | ||
| 4 | Dry Type Transformer - Voltage 4160/208,480 | x | 11 | x | 1 | = | $ - 0 | ||
| 5 | Oil Sampling | x | 38 | x | 1 | = | $ - 0 | ||
| AUTOMATIC TRANSFER SWITCHES | |||||||||
| 1 | Automatic Transfer Switch - Voltage 480 | x | 2 | x | 1 | = | $ - 0 | ||
| CIRCUIT SWITCHER | |||||||||
| 1 | 3-Phase High Voltage Switch | x | 21 | x | 1 | = | $ - 0 | ||
| CAPACITOR BANK | |||||||||
| 1 | KVAR Capacitor Bank - All Ratings | x | 2 | x | 1 | = | $ - 0 | ||
| CONTINUOUS LOAD RECORDING | |||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | ||
| POWER POLES | |||||||||
| 1 | Cross Arms | x | 233 | x | 1 | = | $ - 0 | ||
| 2 | Fuses | x | 191 | x | 1 | = | $ - 0 | ||
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 240 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 80 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CCC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 4. CALIFORNIA CORRECTIONAL INSTITUTION (CCI) | |||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | |||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED | ||||
| # OF SERVICES | = | TOTAL | |||||||
| SWITCHGEAR | |||||||||
| 1 | Main Switchgear - 4,160 V Russ Electric | x | 1 | x | 3 | = | $ - 0 | ||
| 2 | Switchgear Industrial Electric, RSE sierra 4,160 V | x | 1 | x | 3 | = | $ - 0 | ||
| 3 | Switchgear Filter, Lights, & Other Components | x | 10 | x | 3 | = | $ - 0 | ||
| 4 | Time Delay Starting/Closing Relay - 2 | x | 5 | x | 3 | = | $ - 0 | ||
| 5 | Interlocking Relay - 3 | x | 5 | x | 3 | = | $ - 0 | ||
| 6 | Rate of Change Relay - 7 | x | 5 | x | 3 | = | $ - 0 | ||
| 7 | Distance Relay 21 | x | 5 | x | 3 | = | $ - 0 | ||
| 8 | Monitor Relay - 25 | x | 5 | x | 3 | = | $ - 0 | ||
| 9 | Voltz per Hertz Relay - 24 | x | 5 | x | 3 | = | $ - 0 | ||
| 10 | Undervoltage Relay - 27 | x | 5 | x | 3 | = | $ - 0 | ||
| 11 | Static Frequency Relay - 31 | x | 5 | x | 3 | = | $ - 0 | ||
| 12 | Directional Power Relay - 32 | x | 5 | x | 3 | = | $ - 0 | ||
| 13 | Undercurrent/Underpower Relay - 37 | x | 5 | x | 3 | = | $ - 0 | ||
| 14 | Field Over/Under Excitation Relay - 40 | x | 1 | x | 3 | = | $ - 0 | ||
| 15 | Unit Sequence Starting Relay - 44 | x | 5 | x | 3 | = | $ - 0 | ||
| 16 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 2 | x | 3 | = | $ - 0 | ||
| 17 | Phase-Sequence or Phase-Balance Voltage Relay - 47 | x | 5 | x | 3 | = | $ - 0 | ||
| 18 | Incomplete Sequence Relay - 48 | x | 5 | x | 3 | = | $ - 0 | ||
| 19 | Transformer Thermal Relay - 49 | x | 5 | x | 3 | = | $ - 0 | ||
| 20 | Instantaneous Overcurrent Relay - 50 | x | 5 | x | 3 | = | $ - 0 | ||
| 21 | AC Inverse Time Overcurrent Relay - 51 | x | 5 | x | 3 | = | $ - 0 | ||
| 22 | Exciter or DC Generator Relay - 53 | x | 2 | x | 3 | = | $ - 0 | ||
| 23 | Power Factor Relay - 55 | x | 2 | x | 3 | = | $ - 0 | ||
| 24 | Field Application Relay - 56 | x | 2 | x | 3 | = | $ - 0 | ||
| 25 | Rectification Failure Relay - 58 | x | 2 | x | 3 | = | $ - 0 | ||
| 26 | Overvoltage Relay - 59 | x | 2 | x | 3 | = | $ - 0 | ||
| 27 | Voltage or Current Balance Relay - 60 | x | 2 | x | 3 | = | $ - 0 | ||
| 28 | Time-Delay Stopping or Opening Relay - 62 | x | 5 | x | 3 | = | $ - 0 | ||
| 29 | Ground Detector Relay - 64 | x | 2 | x | 3 | = | $ - 0 | ||
| 30 | AC Directional Overcurrent Relay - 64 | x | 2 | x | 3 | = | $ - 0 | ||
| 31 | Blocking Relay - 68 | x | 2 | x | 3 | = | $ - 0 | ||
| 32 | Alarm Relay - 74 | x | 2 | x | 3 | = | $ - 0 | ||
| 33 | DC Overcurrent Relay - 76 | x | 2 | x | 3 | = | $ - 0 | ||
| 34 | Phase-Angle Measuring or Out-of-Step Relay - 78 | x | 2 | x | 3 | = | $ - 0 | ||
| 35 | AC Closing Relay - 79 | x | 5 | x | 3 | = | $ - 0 | ||
| 36 | Frequency Relay - 81 | x | 2 | x | 3 | = | $ - 0 | ||
| 37 | DC Reclosing Relay - 82 | x | 5 | x | 3 | = | $ - 0 | ||
| 38 | Automatic Selective Control or Transfer Relay - 83 | x | 2 | x | 3 | = | $ - 0 | ||
| 39 | Lockout Relay - 86 | x | 5 | x | 3 | = | $ - 0 | ||
| 40 | Differential Protective Relay - 87 | x | 2 | x | 3 | = | $ - 0 | ||
| 41 | Voltage Directional Relay - 91 | x | 2 | x | 3 | = | $ - 0 | ||
| 42 | Voltage and Power Directional Relay - 92 | x | 2 | x | 3 | = | $ - 0 | ||
| 43 | Tripping or Trip-Free Relay - 94 | x | 2 | x | 3 | = | $ - 0 | ||
| 44 | Busbar Trip Lockout Relay - 96 | x | 2 | x | 3 | = | $ - 0 | ||
| 45 | Voltage and Ampere Meters | x | 4 | x | 3 | = | $ - 0 | ||
| 46 | Control Transformers | x | 3 | x | 3 | = | $ - 0 | ||
| 47 | Instrument Transformers (CT’s, PT’s) | x | 3 | x | 3 | = | $ - 0 | ||
| 48 | Potential Transformers | x | 3 | x | 3 | = | $ - 0 | ||
| 49 | Control and Instrument Switches | x | 10 | x | 3 | = | $ - 0 | ||
| 50 | Position Switch | x | 5 | x | 3 | = | $ - 0 | ||
| 51 | Position Changing Mechanism | x | 5 | x | 3 | = | $ - 0 | ||
| 52 | Generator Step-Up Transformers | x | 1 | x | 3 | = | $ - 0 | ||
| 53 | Battery Charger | x | 2 | x | 3 | = | $ - 0 | ||
| 54 | Batteries | x | 24 | x | 3 | = | $ - 0 | ||
| 55 | Main Circuit Breaker - 4160 | x | 4 | x | 3 | = | $ - 0 | ||
| 56 | Circuit Breaker - Voltage 4160 | x | 1 | x | 3 | = | $ - 0 | ||
| 57 | Voltage Regulator | x | 2 | x | 3 | = | $ - 0 | ||
| VACUUM SWITCHES | |||||||||
| 3 | Bypass Isolation Switch | x | 2 | x | 1 | = | $ - 0 | ||
| 4 | Knife Switch | x | 8 | x | 1 | = | $ - 0 | ||
| CIRCUIT BREAKER | |||||||||
| 1 | Circuit Breaker - Voltage 4160v | x | 5 | x | 1 | = | $ - 0 | ||
| 2 | Associated Components | x | 5 | x | 1 | = | $ - 0 | ||
| TRANSFORMERS | |||||||||
| 1 | Pad Mounted Oil-Filled Transformer - 12 kV | x | 22 | x | 1 | = | $ - 0 | ||
| 2 | Pole Mounted Oil-Filled Transformer - 12 kV | x | 3 | x | 1 | = | $ - 0 | ||
| 3 | Dry Type Transformer - 4,160 V | x | 15 | x | 1 | = | $ - 0 | ||
| 4 | Dry Type Transformer - 2,400 V | x | 5 | x | 1 | = | $ - 0 | ||
| 5 | Pad mounted Oil-Filled Transformer - 2,400 V | x | 11 | x | 1 | = | $ - 0 | ||
| 6 | Pad mounted Oil-Filled Transformer - 4,160 V | x | 4 | x | 1 | = | $ - 0 | ||
| 7 | Pole mounted Oil-Filled Transformer - 2,400 V | x | 2 | x | 1 | = | $ - 0 | ||
| 8 | Pole mounted Oil-Filled Transformer- 4,160 V | x | 12 | x | 1 | = | $ - 0 | ||
| 9 | Oil Sampling | x | 54 | x | 1 | = | $ - 0 | ||
| AUTOMATIC TRANSFER SWITCHES | |||||||||
| 1 | Automatic Transfer Switch - 4,160 V | x | 2 | x | 1 | = | $ - 0 | ||
| CIRCUIT SWITCHER | |||||||||
| 1 | 3-Phase High Voltage Switch (Air) | x | 1 | x | 1 | = | $ - 0 | ||
| CAPACITOR BANK | |||||||||
| N/A | |||||||||
| CONTINUOUS LOAD RECORDING | |||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | ||
| POWER POLES | |||||||||
| 1 | Cross Arms (Poles) | x | 105 | x | 1 | = | $ - 0 | ||
| 2 | Fuses (Cut outs) | x | 41 | x | 1 | = | $ - 0 | ||
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 200 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 200 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 100 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CCI TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 5. CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) | |||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | |||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | X | ESTIMATED QUANTITY | X | ESTIMATED | ||||
| # OF SERVICES | = | TOTAL | |||||||
| SWITCHGEAR | |||||||||
| 1 | Main Switchgear 12kV- General Electric | x | 1 | x | 4 | = | $ - 0 | ||
| 2 | Energize and/or De-Energize 12kv Switchgear Circuit Breakers | x | 6 | x | 16 | = | $ - 0 | ||
| 3 | Switchgear Filter, Lights, & Other Components | x | 2 | x | 1 | = | $ - 0 | ||
| 4 | Time Delay Starting/Closing Relay - 2 | x | 2 | x | 1 | = | $ - 0 | ||
| 5 | Interlocking Relay - 3 | x | 1 | x | 1 | = | $ - 0 | ||
| 6 | Rate of Change Relay - 7 | x | 1 | x | 1 | = | $ - 0 | ||
| 7 | Distance Relay 21 | x | 1 | x | 1 | = | $ - 0 | ||
| 8 | Monitor Relay - 25 | x | 12 | x | 1 | = | $ - 0 | ||
| 9 | Volts per Hertz Relay - 24 | x | 12 | x | 1 | = | $ - 0 | ||
| 10 | Under voltage Relay - 27 | x | 12 | x | 1 | = | $ - 0 | ||
| 11 | Static Frequency Relay - 31 | x | 12 | x | 1 | = | $ - 0 | ||
| 12 | Directional Power Relay - 32 | x | 12 | x | 1 | = | $ - 0 | ||
| 13 | Undercurrent/Under power Relay - 37 | x | 12 | x | 1 | = | $ - 0 | ||
| 14 | Field Over/Under Excitation Relay - 40 | x | 12 | x | 1 | = | $ - 0 | ||
| 15 | Unit Sequence Starting Relay - 44 | x | 12 | x | 1 | = | $ - 0 | ||
| 16 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 12 | x | 1 | = | $ - 0 | ||
| 17 | Phase-Sequence or Phase-Balance Voltage Relay - 47 | x | 12 | x | 1 | = | $ - 0 | ||
| 18 | Incomplete Sequence Relay - 48 | x | 12 | x | 1 | = | $ - 0 | ||
| 19 | Transformer Thermal Relay - 49 | x | 12 | x | 1 | = | $ - 0 | ||
| 20 | Instantaneous Overcurrent Relay - 50 | x | 12 | x | 1 | = | $ - 0 | ||
| 21 | AC Inverse Time Overcurrent Relay - 51 | x | 12 | x | 1 | = | $ - 0 | ||
| 22 | Exciter or DC Generator Relay - 53 | x | 12 | x | 1 | = | $ - 0 | ||
| 23 | Power Factor Relay - 55 | x | 12 | x | 1 | = | $ - 0 | ||
| 24 | Field Application Relay - 56 | x | 12 | x | 1 | = | $ - 0 | ||
| 25 | Rectification Failure Relay - 58 | x | 12 | x | 1 | = | $ - 0 | ||
| 26 | Overvoltage Relay - 59 | x | 12 | x | 1 | = | $ - 0 | ||
| 27 | Voltage or Current Balance Relay - 60 | x | 12 | x | 1 | = | $ - 0 | ||
| 28 | Time-Delay Stopping or Opening Relay - 62 | x | 12 | x | 1 | = | $ - 0 | ||
| 29 | Ground Detector Relay - 64 | x | 12 | x | 1 | = | $ - 0 | ||
| 30 | AC Directional Overcurrent Relay - 64 | x | 12 | x | 1 | = | $ - 0 | ||
| 31 | Blocking Relay - 68 | x | 12 | x | 1 | = | $ - 0 | ||
| 32 | Alarm Relay - 74 | x | 12 | x | 1 | = | $ - 0 | ||
| 33 | DC Overcurrent Relay - 76 | x | 2 | x | 1 | = | $ - 0 | ||
| 34 | Phase-Angle Measuring or Out-of-Step Relay - 78 | x | 2 | x | 1 | = | $ - 0 | ||
| 35 | AC Closing Relay - 79 | x | 4 | x | 1 | = | $ - 0 | ||
| 36 | Frequency Relay - 81 | x | 12 | x | 1 | = | $ - 0 | ||
| 37 | DC Reclosing Relay - 82 | x | 4 | x | 1 | = | $ - 0 | ||
| 38 | Automatic Selective Control or Transfer Relay - 83 | x | 4 | x | 1 | = | $ - 0 | ||
| 39 | Lockout Relay - 86 | x | 4 | x | 1 | = | $ - 0 | ||
| 40 | Differential Protective Relay - 87 | x | 12 | x | 1 | = | $ - 0 | ||
| 41 | Voltage Directional Relay - 91 | x | 12 | x | 1 | = | $ - 0 | ||
| 42 | Voltage and Power Directional Relay - 92 | x | 12 | x | 1 | = | $ - 0 | ||
| 43 | Tripping or Trip-Free Relay - 94 | x | 12 | x | 1 | = | $ - 0 | ||
| 44 | Bus bar Trip Lockout Relay - 96 | x | 12 | x | 1 | = | $ - 0 | ||
| 45 | Voltage and Ampere Meters | x | 12 | x | 1 | = | $ - 0 | ||
| 46 | Control Transformers | x | 4 | x | 1 | = | $ - 0 | ||
| 47 | Instrument Transformers (CT’s, PT’s) | x | 12 | x | 1 | = | $ - 0 | ||
| 48 | Potential Transformers | x | 12 | x | 1 | = | $ - 0 | ||
| 49 | Control and Instrument Switches | x | 12 | x | 1 | = | $ - 0 | ||
| 50 | Position Switch | x | 30 | x | 1 | = | $ - 0 | ||
| 51 | Position Changing Mechanism | x | 12 | x | 1 | = | $ - 0 | ||
| 52 | Generator Step-Up Transformers | x | 1 | x | 1 | = | $ - 0 | ||
| 53 | Battery Charger | x | 2 | x | 1 | = | $ - 0 | ||
| 54 | Batteries | x | 48 | x | 1 | = | $ - 0 | ||
| 55 | Main Circuit Breaker - Voltage 15 KV | x | 1 | x | 3 | = | $ - 0 | ||
| 56 | Breaker 1200 AMP GE Mod V81138-500 | x | 6 | x | 1 | = | $ - 0 | ||
| VACUUM SWITCHES | |||||||||
| 1 | Gas Insulated Vacuum Switch | x | 18 | x | 1 | = | $ - 0 | ||
| CIRCUIT BREAKER | |||||||||
| 1 | Circuit Breaker - Voltage 480 | x | 150 | x | 1 | = | $ - 0 | ||
| 2 | Associated Components | x | 150 | x | 1 | = | $ - 0 | ||
| TRANSFORMERS | |||||||||
| 1 | Oil-Filled Transformer - Voltage 15 KV | x | 50 | x | 1 | = | $ - 0 | ||
| 2 | Oil Sampling | x | 50 | x | 1 | = | $ - 0 | ||
| 3 | Fuses | x | 150 | x | 1 | = | $ - 0 | ||
| 4 | Other Components | x | 50 | x | 1 | = | $ - 0 | ||
| AUTOMATIC TRANSFER SWITCHES | |||||||||
| 1 | Automatic Transfer Switch - Voltage 15 KV | x | 1 | x | 1 | = | $ - 0 | ||
| CIRCUIT SWITCHER | |||||||||
| 1 | 3-Phase High Voltage Switch | x | 1 | x | 1 | = | $ - 0 | ||
| 2 | Load Interrupters ( Load Breaks ) | x | 300 | x | 1 | = | $ - 0 | ||
| CAPACITOR BANK | |||||||||
| 1 | N/A | ||||||||
| CONTINUOUS LOAD RECORDING | |||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | ||
| POWER POLES | |||||||||
| 1 | N/A | ||||||||
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 160 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 160 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CCWF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 6. CENTINELA STATE PRISON (CEN) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 15 kV- CGI | x | 1 | x | 1 | = | $ - 0 | |
| 2 | Switchgear Filter, Lights, & Other Components | x | 26 | x | 1 | = | $ - 0 | |
| 3 | Time Delay Starting/Closing Relay - 2 | x | 2 | x | 1 | = | $ - 0 | |
| 4 | Undervoltage Relay - 27 | x | 4 | x | 1 | = | $ - 0 | |
| 5 | Phase-Sequence or Phase-Balance Voltage Relay- 47 | x | 1 | x | 1 | = | $ - 0 | |
| 6 | Instantaneous Overcurrent Relay - 50 | x | 40 | x | 1 | = | $ - 0 | |
| 7 | AC Inverse Time Overcurrent Relay - 51 | x | 13 | x | 1 | = | $ - 0 | |
| 8 | Frequency Relay - 81 | x | 36 | x | 1 | = | $ - 0 | |
| 9 | Lockout Relay - 86 | x | 4 | x | 1 | = | $ - 0 | |
| 10 | Differential Protective Relay - 87 | x | 12 | x | 1 | = | $ - 0 | |
| 11 | Tripping or Trip-Free Relay - 94 | x | 1 | x | 1 | = | $ - 0 | |
| 12 | Voltage and Ampere Meters | x | 16 | x | 1 | = | $ - 0 | |
| 13 | Control Transformers | x | 1 | x | 1 | = | $ - 0 | |
| 14 | Instrument Transformers (CT’s, PT’s) | x | 4 | x | 1 | = | $ - 0 | |
| 15 | Control and Instrument Switches | x | 14 | x | 1 | = | $ - 0 | |
| 16 | Position Changing Mechanism | x | 15 | x | 1 | = | $ - 0 | |
| 17 | Generator Step-Up Transformers | x | 1 | x | 1 | = | $ - 0 | |
| 18 | Battery Charger | x | 2 | x | 1 | = | $ - 0 | |
| 19 | Batteries | x | 24 | x | 1 | = | $ - 0 | |
| 20 | Starter - Motor Control - 24 VDC | x | 2 | x | 1 | = | $ - 0 | |
| 21 | Voltage Regulator | x | 2 | x | 1 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | N/A | x | x | = | ||||
| CIRCUIT BREAKER | ||||||||
| 1 | Circuit Breaker - 12 Kv | x | 12 | x | 1 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | Dry Type Transformer - 12,500 Kv to 480 V | x | 48 | x | 1 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | N/A | x | x | = | ||||
| CIRCUIT SWITCHER | ||||||||
| 1 | N/A | x | x | = | ||||
| CAPACITOR BANK | ||||||||
| 1 | N/A | x | x | = | ||||
| POWER POLES | ||||||||
| 1 | N/A | x | x | = | ||||
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 100 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 100 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 100 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CEN TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 7. CALIFORNIA HEALTH CARE FACILITY (CHCF) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR BUILDING | ||||||||
| 1 | 489 Generator Management Relays | x | 6 | x | 2 | = | $ - 0 | |
| 2 | 735 Feeder Potection Relays | x | 17 | x | 2 | = | $ - 0 | |
| 3 | 750 Feeder Management Relays | x | 1 | x | 2 | = | $ - 0 | |
| 4 | 12 KV Breakers and Associated PT’s and CT’s | x | 24 | x | 2 | = | $ - 0 | |
| 5 | ASCO Touchscreen Monitors and Associated Parts (power supply, etc.) | x | 2 | x | 2 | = | $ - 0 | |
| 6 | DC Battery Chargers | x | 2 | x | 2 | = | $ - 0 | |
| 7 | DC Batteries | x | 112 | x | 2 | = | $ - 0 | |
| 8 | Oil Filled Transformer 12kv | x | 58 | x | 2 | = | $ - 0 | |
| 9 | Oil Sampling | x | 58 | x | 2 | = | $ - 0 | |
| 10 | Automatic Transfer Switch 480v | x | 75 | x | 2 | = | $ - 0 | |
| HIGH VOLTAGE YARD | ||||||||
| 11 | 12 KV Breaker | x | 1 | x | 2 | = | $ - 0 | |
| 12 | Circuit Switcher | x | 1 | x | 2 | = | $ - 0 | |
| 13 | Air Switch | x | 1 | x | 2 | = | $ - 0 | |
| 14 | Voltage Regulators | x | 3 | x | 2 | = | $ - 0 | |
| 15 | DC Batteries | x | 24 | x | 2 | = | $ - 0 | |
| 16 | Battery Charger | x | 1 | x | 2 | = | $ - 0 | |
| 17 | Oil Sampling | x | 1 | x | 2 | = | $ - 0 | |
| 18 | 509 ITM Intelligent Transformer Monitor | x | 1 | x | 2 | = | $ - 0 | |
| 19 | Transformer 115kv | x | 1 | x | 2 | = | $ - 0 | |
| 20 | Schweitzer Engineering Labratories SEL-735 Power Quality & Revenue Meter | x | 1 | x | 2 | = | $ - 0 | |
| 21 | Schweitzer Engineering Laboratories SEL-351 Protection System | x | 3 | x | 2 | = | $ - 0 | |
| 22 | Schweitzer Engineering Laboratories SEL-387 Current Differential Relay | x | 1 | x | 2 | = | $ - 0 | |
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | Scheduled - Normal Business Hours | x | 300 | = | $ - 0 | |
| 2 | Emergency Repairs | x | 75 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CHCF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 8. CALIFORNIA INSTITUTION FOR MEN (CIM) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 5kV- Brand N/A | x | 3 | x | 3 | = | $ - 0 | |
| 2 | Switchgear 2400kV - Brand N/A | x | 27 | x | 1 | = | $ - 0 | |
| 3 | Switchgear Filter, Lights, & Other Components | x | 27 | x | 1 | = | $ - 0 | |
| 4 | Time Delay Starting/Closing Relay - 2 | x | 3 | x | 1 | = | $ - 0 | |
| 5 | Interlocking Relay - 3 | x | 3 | x | 1 | = | $ - 0 | |
| 6 | Rate of Change Relay - 7 | x | 2 | x | 1 | = | $ - 0 | |
| 7 | Distance Relay 21 | x | 6 | x | 1 | = | $ - 0 | |
| 8 | Monitor Relay - 25 | x | 6 | x | 1 | = | $ - 0 | |
| 9 | Voltz per Hertz Relay - 24 | x | 4 | x | 1 | = | $ - 0 | |
| 10 | Undervoltage Relay - 27 | x | 4 | x | 1 | = | $ - 0 | |
| 11 | Static Frequency Relay - 31 | x | 4 | x | 1 | = | $ - 0 | |
| 12 | Directional Power Relay - 32 | x | 6 | x | 1 | = | $ - 0 | |
| 13 | Field Over/Under Excitation Relay - 40 | x | 4 | x | 1 | = | $ - 0 | |
| 14 | Unit Sequence Starting Relay - 44 | x | 3 | x | 1 | = | $ - 0 | |
| 15 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 1 | x | 1 | = | $ - 0 | |
| 16 | Incomplete Sequence Relay - 48 | x | 6 | x | 1 | = | $ - 0 | |
| 17 | Transformer Thermal Relay - 49 | x | 6 | x | 1 | = | $ - 0 | |
| 18 | Instantaneous Overcurrent Relay - 50 | x | 6 | x | 1 | = | $ - 0 | |
| 19 | AC Inverse Time Overcurrent Relay - 51 | x | 3 | x | 1 | = | $ - 0 | |
| 20 | Exciter or DC Generator Relay - 53 | x | 3 | x | 1 | = | $ - 0 | |
| 21 | Power Factor Relay - 55 | x | 3 | x | 1 | = | $ - 0 | |
| 22 | Field Application Relay - 56 | x | 3 | x | 1 | = | $ - 0 | |
| 23 | Rectification Failure Relay - 58 | x | 3 | x | 1 | = | $ - 0 | |
| 24 | Overvoltage Relay - 59 | x | 6 | x | 3 | = | $ - 0 | |
| 25 | Voltage or Current Balance Relay - 60 | x | 6 | x | 3 | = | $ - 0 | |
| 26 | Time-Delay Stopping or Opening Relay - 62 | x | 3 | x | 1 | = | $ - 0 | |
| 27 | Ground Detector Relay - 64 | x | 6 | x | 3 | = | $ - 0 | |
| 28 | AC Directional Overcurrent Relay - 64 | x | 3 | x | 1 | = | $ - 0 | |
| 29 | Blocking Relay - 68 | x | 3 | x | 1 | = | $ - 0 | |
| 30 | Alarm Relay - 74 | x | 3 | x | 1 | = | $ - 0 | |
| 31 | DC Overcurrent Relay - 76 | x | 3 | x | 1 | = | $ - 0 | |
| 32 | Phase-Angle Measuring or Out-of-Step Relay - 78 | x | 1 | x | 1 | = | $ - 0 | |
| 33 | AC Closing Relay - 79 | x | 3 | x | 1 | = | $ - 0 | |
| 34 | Frequency Relay - 81 | x | 3 | x | 3 | = | $ - 0 | |
| 35 | DC Reclosing Relay - 82 | x | 3 | x | 1 | = | $ - 0 | |
| 36 | Automatic Selective Control or Transfer Relay - 83 | x | 1 | x | 1 | = | $ - 0 | |
| 37 | Lockout Relay - 86 | x | 3 | x | 1 | = | $ - 0 | |
| 38 | Differential Protective Relay - 87 | x | 3 | x | 1 | = | $ - 0 | |
| 39 | Voltage Directional Relay - 91 | x | 3 | x | 1 | = | $ - 0 | |
| 40 | Voltage and Power Directional Relay - 92 | x | 3 | x | 1 | = | $ - 0 | |
| 41 | Tripping or Trip-Free Relay - 94 | x | 3 | x | 1 | = | $ - 0 | |
| 42 | westinghouse/siemans 50/51 relays | x | 77 | x | 3 | = | $ - 0 | |
| 43 | ABB/ITE 32 relays | x | 8 | x | 1 | = | $ - 0 | |
| 44 | ABB/ITE 40 relays | x | 8 | x | 1 | = | $ - 0 | |
| 45 | ABB/ITE 46 relays | x | 8 | x | 1 | = | $ - 0 | |
| 46 | current transformers | x | 6 | x | 3 | = | $ - 0 | |
| 47 | potential transformers | x | 12 | x | 3 | = | $ - 0 | |
| 48 | megawatt meter (0-20) | x | 3 | x | 3 | = | $ - 0 | |
| 49 | megawatt meter (0-5) | x | 3 | x | 3 | = | $ - 0 | |
| 50 | ammeter (0-200) | x | 3 | x | 3 | = | $ - 0 | |
| 51 | ammeter (0-400) | x | 3 | x | 3 | = | $ - 0 | |
| 52 | ammeter (0-4000) | x | 3 | x | 3 | = | $ - 0 | |
| 53 | ammeter (0-3000) | x | 3 | x | 3 | = | $ - 0 | |
| 54 | kilovolt meter (range 0-15) | x | 3 | x | 3 | = | $ - 0 | |
| 55 | Battery charger | x | 6 | x | 3 | = | $ - 0 | |
| 56 | Battery | x | 6 | x | 1 | = | $ - 0 | |
| 57 | Control and Instrument Switches | x | 13 | x | 3 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | Pad Mounted Sectionalizing Isolation Switch 2400V | x | 27 | x | 3 | = | $ - 0 | |
| 2 | Load Breaks | x | 54 | x | 3 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | H. V. vacuum breakers 2400V | x | 15 | x | 3 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | Main Oil-Filled Transformer - Voltage 12.4 KV/2400V | x | 1 | x | 1 | = | $ - 0 | |
| 2 | Oil-Filled Transformer - 2400V | x | 3 | x | 3 | = | $ - 0 | |
| 3 | Dry Type Transformer - Voltage 25KVA/500KVA | x | 15 | x | 3 | = | $ - 0 | |
| 4 | Oil Sampling | x | 3 | x | 1 | = | $ - 0 | |
| 5 | Instrument Transformers (CT’s, PT’s) | x | 6 | x | 6 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch - Voltage | x | 3 | x | 1 | = | $ - 0 | |
| 2 | Bypass Isolation Switch - Voltage 12400V/2400V | x | 3 | x | 1 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 29 | x | 1 | = | $ - 0 | |
| 2 | Load Interruptors | x | 27 | x | 1 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | KVAR Capacitor Bank - (1500KVAR 5-STEP) | x | 3 | x | 1 | = | $ - 0 | |
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | Cross Arms | x | 174 | x | 1 | = | $ - 0 | |
| 2 | Fuses cut outs | x | 38 | x | 3 | = | $ - 0 | |
| 3 | load break w/operating handle (air switches) 2400V | x | 13 | x | 1 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 260 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 180 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 80 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CIM TOTAL BASIS OF AWARD (A+B+C+D) $ - 0
| 9. CALIFORNIA INSTITUTION FOR WOMEN (CIW) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 4,160 V- G.E. | x | 4 | x | 3 | = | $ - 0 | |
| 2 | Switchgear kV - Brand see attachment | x | 3 | x | 3 | = | $ - 0 | |
| 3 | Switchgear Filter, Lights, & Other Components ( 3 sets) | x | 3 | x | 3 | = | $ - 0 | |
| 4 | Time Delay Starting/Closing Relay - 2 | x | 3 | x | 3 | = | $ - 0 | |
| 5 | Interlocking Relay - 3 | x | 13 | x | 3 | = | $ - 0 | |
| 6 | Monitor Relay - 25 | x | 3 | x | 3 | = | $ - 0 | |
| 7 | Voltz per Hertz Relay - 24 | x | 4 | x | 3 | = | $ - 0 | |
| 8 | Undervoltage Relay - 27 | x | 2 | x | 3 | = | $ - 0 | |
| 9 | Static Frequency Relay - 31 | x | 4 | x | 3 | = | $ - 0 | |
| 10 | Undercurrent/Underpower Relay - 37 | x | 2 | x | 3 | = | $ - 0 | |
| 11 | Field Over/Under Excitation Relay - 40 | x | 3 | x | 3 | = | $ - 0 | |
| 12 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 1 | x | 3 | = | $ - 0 | |
| 13 | Instantaneous Overcurrent Relay - 50 | x | 18 | x | 3 | = | $ - 0 | |
| 14 | Power Factor Relay - 55 | x | 3 | x | 3 | = | $ - 0 | |
| 15 | Voltage or Current Balance Relay - 60 | x | 3 | x | 3 | = | $ - 0 | |
| 16 | Time-Delay Stopping or Opening Relay - 62 | x | 3 | x | 3 | = | $ - 0 | |
| 17 | Alarm Relay - 74 | x | 3 | x | 3 | = | $ - 0 | |
| 18 | AC Closing Relay - 79 | x | 8 | x | 3 | = | $ - 0 | |
| 19 | Frequency Relay - 81 | x | 3 | x | 3 | = | $ - 0 | |
| 20 | Automatic Selective Control or Transfer Relay - 83 | x | 4 | x | 3 | = | $ - 0 | |
| 21 | Lockout Relay - 86 | x | 9 | x | 3 | = | $ - 0 | |
| 22 | Tripping or Trip-Free Relay - 94 | x | 6 | x | 3 | = | $ - 0 | |
| 23 | Voltage and Ampere Meters | x | 4 | x | 3 | = | $ - 0 | |
| 24 | Control Transformers | x | 3 | x | 3 | = | $ - 0 | |
| 25 | Instrument Transformers (CT’s, PT’s) | x | 3 | x | 3 | = | $ - 0 | |
| 26 | Potential Transformers | x | 3 | x | 3 | = | $ - 0 | |
| 27 | Control and Instrument Switches | x | 6 | x | 3 | = | $ - 0 | |
| 28 | Position Switch | x | 6 | x | 3 | = | $ - 0 | |
| 29 | Battery Charger | x | 1 | x | 3 | = | $ - 0 | |
| 30 | Batteries | x | 18 | x | 3 | = | $ - 0 | |
| 31 | Starter - Motor Control | x | 3 | x | 3 | = | $ - 0 | |
| 32 | Main Circuit Breaker - see attachment | x | 1 | x | 3 | = | $ - 0 | |
| 33 | Circuit Breaker - Voltage | x | 17 | x | 3 | = | $ - 0 | |
| 34 | Voltage Regulator | x | 3 | x | 3 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | Liquid Insulated Vacuum Switch | x | 6 | x | 3 | = | $ - 0 | |
| 2 | Bypass Isolation Switch | x | 6 | x | 3 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | Circuit Breaker - Voltage see attachment | x | 18 | x | 3 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 2 | Oil-Filled Transformer | x | 23 | x | 3 | = | $ - 0 | |
| 3 | Dry Type Transformer | x | 1 | x | 3 | = | $ - 0 | |
| 4 | Oil Sampling | x | 23 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch - 277-480 V | x | 3 | x | 3 | = | $ - 0 | |
| 2 | Bypass Isolation Switch - 277-480 V | x | 6 | x | 3 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 3 | x | 3 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | KVAR Capacitor Bank - All Ratings | x | 1 | x | 3 | = | $ - 0 | |
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | N/A | |||||||
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 150 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 80 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CIW TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 10. CALIFORNIA MEN'S COLONY (CMC) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear | x | 4 | x | 3 | = | $ - 0 | |
| 2 | Switchgear Filter, Lights, & Other Components | x | 4 | x | 3 | = | $ - 0 | |
| 3 | Control Transformers | x | 5 | x | 3 | = | $ - 0 | |
| 4 | Starter - Motor Control | x | 15 | x | 3 | = | $ - 0 | |
| 5 | Main Circuit Breaker | x | 25 | x | 3 | = | $ - 0 | |
| 6 | Circuit Breaker | x | 25 | x | 3 | = | $ - 0 | |
| 7 | Voltage Regulator | x | 25 | x | 3 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | N/A | |||||||
| CIRCUIT BREAKER | ||||||||
| 1 | N/A | |||||||
| TRANSFORMERS | ||||||||
| 1 | Main Oil-Filled Transformer | x | 7 | x | 3 | = | $ - 0 | |
| 2 | Oil-Filled Transformer | x | 18 | x | 3 | = | $ - 0 | |
| 3 | Dry Type Transformer | x | 20 | x | 3 | = | $ - 0 | |
| 4 | Oil Sampling | x | 25 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch | x | 8 | x | 3 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 6 | x | 3 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | N/A | |||||||
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | Cross Arms | x | 65 | x | 3 | = | $ - 0 | |
| 2 | Fuses | x | 195 | x | 3 | = | $ - 0 | |
| 3 | Other Components | x | 200 | x | 3 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 150 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 60 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 80 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $100,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CMC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 11. CALIFORNIA MEDICAL FACILITY (CMF) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 12kV- Eaton | x | 1 | x | 3 | = | $ - 0 | |
| 2 | Switchgear 4160v - Eaton | x | 1 | x | 3 | = | $ - 0 | |
| 3 | Switchgear Filter, Lights, & Other Components | x | 3 | x | 3 | = | $ - 0 | |
| 4 | Time Delay Starting/Closing Relay - 2 | x | 1 | x | 3 | = | $ - 0 | |
| 5 | Interlocking Relay - 3 | x | 4 | x | 3 | = | $ - 0 | |
| 6 | Rate of Change Relay - 7 | x | 2 | x | 3 | = | $ - 0 | |
| 7 | Distance Relay 21 | x | 21 | x | 3 | = | $ - 0 | |
| 8 | Monitor Relay - 25 | x | 1 | x | 3 | = | $ - 0 | |
| 9 | Voltz per Hertz Relay - 24 | x | 2 | x | 3 | = | $ - 0 | |
| 10 | Undervoltage Relay - 27 | x | 2 | x | 3 | = | $ - 0 | |
| 11 | Static Frequency Relay - 31 | x | 2 | x | 3 | = | $ - 0 | |
| 12 | Directional Power Relay - 32 | x | 1 | x | 3 | = | $ - 0 | |
| 13 | Undercurrent/Underpower Relay - 37 | x | 1 | x | 3 | = | $ - 0 | |
| 14 | Field Over/Under Excitation Relay - 40 | x | 1 | x | 3 | = | $ - 0 | |
| 15 | Unit Sequence Starting Relay - 44 | x | 1 | x | 3 | = | $ - 0 | |
| 16 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 1 | x | 3 | = | $ - 0 | |
| 17 | Phase-Sequence or Phase-Balance Voltage Relay - 47 | x | 1 | x | 3 | = | $ - 0 | |
| 18 | Incomplete Sequence Relay - 48 | x | 1 | x | 3 | = | $ - 0 | |
| 19 | Transformer Thermal Relay - 49 | x | 1 | x | 3 | = | $ - 0 | |
| 20 | Instantaneous Overcurrent Relay - 50 | x | 14 | x | 3 | = | $ - 0 | |
| 21 | AC Inverse Time Overcurrent Relay - 51 | x | 1 | x | 3 | = | $ - 0 | |
| 22 | Exciter or DC Generator Relay - 53 | x | 8 | x | 3 | = | $ - 0 | |
| 23 | Power Factor Relay - 55 | x | 1 | x | 3 | = | $ - 0 | |
| 24 | Field Application Relay - 56 | x | 6 | x | 3 | = | $ - 0 | |
| 25 | Rectification Failure Relay - 58 | x | 3 | x | 3 | = | $ - 0 | |
| 26 | Overvoltage Relay - 59 | x | 2 | x | 3 | = | $ - 0 | |
| 27 | Voltage or Current Balance Relay - 60 | x | 2 | x | 3 | = | $ - 0 | |
| 28 | Time-Delay Stopping or Opening Relay - 62 | x | 6 | x | 3 | = | $ - 0 | |
| 29 | Ground Detector Relay - 64 | x | 9 | x | 3 | = | $ - 0 | |
| 30 | AC Directional Overcurrent Relay - 64 | x | 3 | x | 3 | = | $ - 0 | |
| 31 | Blocking Relay - 68 | x | 1 | x | 3 | = | $ - 0 | |
| 32 | Alarm Relay - 74 | x | 1 | x | 3 | = | $ - 0 | |
| 33 | DC Overcurrent Relay - 76 | x | 1 | x | 3 | = | $ - 0 | |
| 34 | Phase-Angle Measuring or Out-of-Step Relay - 78 | x | 2 | x | 3 | = | $ - 0 | |
| 35 | AC Closing Relay - 79 | x | 3 | x | 3 | = | $ - 0 | |
| 36 | Frequency Relay - 81 | x | 1 | x | 3 | = | $ - 0 | |
| 37 | DC Reclosing Relay - 82 | x | 3 | x | 3 | = | $ - 0 | |
| 38 | Automatic Selective Control or Transfer Relay - 83 | x | 1 | x | 3 | = | $ - 0 | |
| 39 | Lockout Relay - 86 | x | 1 | x | 3 | = | $ - 0 | |
| 40 | Differential Protective Relay - 87 | x | 1 | x | 3 | = | $ - 0 | |
| 41 | Voltage Directional Relay - 91 | x | 1 | x | 3 | = | $ - 0 | |
| 42 | Voltage and Power Directional Relay - 92 | x | 2 | x | 3 | = | $ - 0 | |
| 43 | Tripping or Trip-Free Relay - 94 | x | 2 | x | 3 | = | $ - 0 | |
| 44 | Busbar Trip Lockout Relay - 96 | x | 1 | x | 3 | = | $ - 0 | |
| 45 | Voltage and Ampere Meters | x | 1 | x | 3 | = | $ - 0 | |
| 46 | Control Transformers | x | 6 | x | 3 | = | $ - 0 | |
| 47 | Instrument Transformers (CT’s, PT’s) | x | 2 | x | 3 | = | $ - 0 | |
| 48 | Potential Transformers | x | 2 | x | 3 | = | $ - 0 | |
| 49 | Control and Instrument Switches | x | 2 | x | 3 | = | $ - 0 | |
| 50 | Position Switch | x | 2 | x | 3 | = | $ - 0 | |
| 51 | Position Changing Mechanism | x | 3 | x | 3 | = | $ - 0 | |
| 52 | Generator Step-Up Transformers | x | 3 | x | 3 | = | $ - 0 | |
| 53 | Battery Charger | x | 9 | x | 3 | = | $ - 0 | |
| 54 | Batteries | x | 36 | x | 3 | = | $ - 0 | |
| 55 | Starter - Motor Control - Voltage 120v | x | 1 | x | 3 | = | $ - 0 | |
| 56 | Main Circuit Breaker - Voltage 4160v | x | 1 | x | 3 | = | $ - 0 | |
| 57 | Circuit Breaker - Voltage 208v | x | 1 | x | 3 | = | $ - 0 | |
| 58 | Voltage Regulator | x | 1 | x | 3 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | Liquid Insulated Vacuum Switch | x | 6 | x | 3 | = | $ - 0 | |
| 2 | Bypass Isolation Switch | x | 1 | x | 3 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | Circuit Breaker - Voltage 4160v | x | 1 | x | 3 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | Main Oil-Filled Transformer - Voltage 12k/4160v | x | 2 | x | 3 | = | $ - 0 | |
| 2 | Oil-Filled Transformer - Voltage 4160/480 | x | 10 | x | 3 | = | $ - 0 | |
| 3 | Dry Type Transformer - Voltage 480/208/120 | x | 26 | x | 3 | = | $ - 0 | |
| 4 | Oil Sampling | x | 12 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | Automatic Transfer Switch - Voltage 4160v | x | 1 | x | 3 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 3 | x | 3 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | KVAR Capacitor Bank - All Ratings | x | 2 | x | 3 | = | $ - 0 | |
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | Cross Arms | x | 30 | x | 90 | = | $ - 0 | |
| 2 | Fuses | x | 3 | x | 9 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 150 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 60 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CMF TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 12. CALIFORNIA STATE PRISON, CORCORAN (COR) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 12KV - GE | x | 1 | x | 2 | = | $ - 0 | |
| 2 | General Electric Overcurrent Relay IFC 50/51 | x | 31 | x | 2 | = | $ - 0 | |
| 3 | General Electric Overcurrent Relay IFC 50/51G | x | 1 | x | 2 | = | $ - 0 | |
| 4 | Ammeter | x | 13 | x | 2 | = | $ - 0 | |
| 5 | Kilowatt Meter | x | 5 | x | 2 | = | $ - 0 | |
| 6 | Kilovoltmeter | x | 2 | x | 2 | = | $ - 0 | |
| 7 | Beckwith Single Phase Programmable Relay M3420, #2299 | x | 1 | x | 2 | = | $ - 0 | |
| 8 | General Electric Overcurrent Relay 121AV51D1A | x | 1 | x | 2 | = | $ - 0 | |
| 9 | General Electric Differential Relay Type STD 87T | x | 3 | x | 2 | = | $ - 0 | |
| 10 | Emergency Switchgear 5KV - GE | x | 1 | x | 2 | = | $ - 0 | |
| 11 | Mold Case Circuit Breaker Panel | x | 1 | x | 2 | = | $ - 0 | |
| 12 | BBC Reverse Poser Relay 32R | x | 3 | x | 2 | = | $ - 0 | |
| 13 | BBC Negative Sequence Overcurrent Relay 46Q | x | 3 | x | 2 | = | $ - 0 | |
| 14 | BBC Loss of Excitation | x | 3 | x | 2 | = | $ - 0 | |
| 15 | BBC Differential Relay 87M | x | 3 | x | 2 | = | $ - 0 | |
| 16 | Basler BEI-51/27 R Relay | x | 3 | x | 2 | = | $ - 0 | |
| 17 | Basler Ground Fault Overvoltage Relay 59N | x | 3 | x | 2 | = | $ - 0 | |
| 18 | AC Voltmeters | x | 3 | x | 2 | = | $ - 0 | |
| 19 | Frequency Meters | x | 5 | x | 2 | = | $ - 0 | |
| 20 | Synch Scope Relay | x | 3 | x | 2 | = | $ - 0 | |
| 21 | Basler BEI-25 Synch Check Relay | x | 1 | x | 2 | = | $ - 0 | |
| 22 | Basler BEI-51 Overcurrent Relay | x | 1 | x | 2 | = | $ - 0 | |
| 23 | Basler BEI-59N Ground Fault Relay | x | 1 | x | 2 | = | $ - 0 | |
| 24 | BBC Transformer Differential Relay 871 | x | 3 | x | 2 | = | $ - 0 | |
| 25 | Westinghouse-Ampgard 250 h.p., 4160 Volt Starter | x | 1 | x | 2 | = | $ - 0 | |
| 26 | BBC Ground Fault Relay 6R-20 | x | 1 | x | 2 | = | $ - 0 | |
| 27 | Relay – Differential – Phase (Westinghouse) | x | 3 | x | 2 | = | $ - 0 | |
| 28 | Relay – Over current (Westinghouse) | x | 5 | x | 2 | = | $ - 0 | |
| 29 | Relay – Distance (Westinghouse) | x | 1 | x | 2 | = | $ - 0 | |
| 30 | Relay – Reclosing (Westinghouse) | x | 2 | x | 2 | = | $ - 0 | |
| 31 | Relay – Distance Timing (Westinghouse) | x | 1 | x | 2 | = | $ - 0 | |
| 32 | Relay – Tripping (General Electric) | x | 1 | x | 2 | = | $ - 0 | |
| 33 | Switch – Circuit Switcher (Electro-Switch) | x | 1 | x | 2 | = | $ - 0 | |
| 34 | Switch – Manuel/Automatic Transfer (Electro-Switch) | x | 1 | x | 2 | = | $ - 0 | |
| 35 | Meter – AMP 12 KV (Westinghouse) | x | 1 | x | 2 | = | $ - 0 | |
| 36 | Relay – Reverse Power (Basler Electric) | x | 1 | x | 2 | = | $ - 0 | |
| 37 | Meter – Demand Ampere (Sangamo) | x | 1 | x | 2 | = | $ - 0 | |
| 38 | Substation Load Tap Changer | x | 1 | x | 2 | = | $ - 0 | |
| 39 | 3 Phase High Voltage (12 KV) Mechanical Disconnects | x | 1 | x | 2 | = | $ - 0 | |
| 40 | Current Transformers/Potential Transformers | x | 6 | x | 2 | = | $ - 0 | |
| 41 | Charger - Power Conversion Product Inc.” Mod# -FD-48-12B Ser#30405-1001 | x | 1 | x | 2 | = | $ - 0 | |
| 42 | Batteries – Keystone Mod# - PLA-120SLA | x | 8 | x | 2 | = | $ - 0 | |
| 43 | Charger- Hindle Power Mod# - 1SCRF048-12 Ser# - 10055/490470 CI | x | 1 | x | 2 | = | $ - 0 | |
| 44 | Batteries – Power Safe – C Cat# - 610127 - CW | x | 8 | x | 2 | = | $ - 0 | |
| 45 | Charger-C&D Technologies Mod#-ARE-M13012A Ser#-HPS1252561 | x | 1 | x | 2 | = | $ - 0 | |
| 46 | Batteries-C&D Technologies Mod#-3DJ-110 | x | 20 | x | 2 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | N/A | |||||||
| CIRCUIT BREAKER | ||||||||
| 1 | General Electric 12KV Power VAC Circuit Breaker | x | 8 | x | 2 | = | $ - 0 | |
| 2 | General Electric 5KV Power VAC Circuit Breaker | x | 4 | x | 2 | = | $ - 0 | |
| 3 | Klochner Moeller – Series 200 480VAC 3 PH | x | 1 | x | 2 | = | $ - 0 | |
| TRANSFORMERS | ||||||||
| 1 | General Electric Heavy Duty Electric, Oil Filled Transformer (HV=115,000 GRDY/ 66,400 LV=12470Y/7200 X 4160Y/2400) | x | 1 | x | 2 | = | $ - 0 | |
| 2 | General Electric Oil Filled Transformer (12.5KV/7.2-4 16KV) | x | 1 | x | 2 | = | $ - 0 | |
| 3 | Westinghouse Oil Filled Transformer (12.5KV/7.2-4 16KV) | x | 1 | x | 2 | = | $ - 0 | |
| 4 | MGM Oil Filled Transformer (4160 480y/277 750 KVA) | x | 1 | x | 2 | = | $ - 0 | |
| 5 | PDT/USS OIL FILLED TRANSFORMER (KV/480) | x | 75 | x | 2 | = | $ - 0 | |
| 6 | 10KVA GE Sub Polarity (HV-12470/2160Y – LV-277/480Y) | x | 27 | x | 2 | = | $ - 0 | |
| 7 | 15KVA GE 1Phase Class – OA-237LB (HV – 12470/2160Y – LV – 277/480Y) | x | 11 | x | 2 | = | $ - 0 | |
| 8 | Oil Sampling | x | 117 | x | 2 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | ASCO Automatic Transfer Switch, AMP 1200, 480V - Hospital | x | 1 | x | 2 | = | $ - 0 | |
| 2 | ASCO Bypass Isolation Switch, AMP 400, 480V - Hospital | x | 1 | x | 2 | = | $ - 0 | |
| 3 | ASCO Bypass Isolation Switch, AMP 150, 480V - Hospital | x | 1 | x | 2 | = | $ - 0 | |
| 4 | Onan Transfer Switch Model OTCU400-6-146,277/400, 400 AMP | x | 1 | x | 2 | = | $ - 0 | |
| 5 | Westinghouse Automatic Transfer Switch, Style No. 5T0326, 400AMP, 3PH Water Plant | x | 1 | x | 2 | = | $ - 0 | |
| 6 | Square D Automatic Transfer Switch 260 A, 460V, Class 8901Cat#8901AG0360-3-480 | x | 1 | x | 2 | = | $ - 0 | |
| 7 | Asco Automatic Transfer Switch | x | 1 | x | 2 | = | $ - 0 | |
| CIRCUIT SWITCHER | ||||||||
| 1 | 121 KV 3PH High Voltage Switch | x | 1 | x | 2 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | N/A | |||||||
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | Cross Arms | x | 1 | x | 2 | = | $ - 0 | |
| 2 | Fuses | x | 196 | x | 2 | = | $ - 0 | |
| 3 | Other Components | x | 1 | x | 2 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 150 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 80 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 60 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
COR TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 13. CALIFORNIA REALITY BASED TRAINING CENTER (CRBTC) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear 12kV | x | 2 | x | 3 | = | $ - 0 | |
| 2 | Switchgear 12kV - Squre D | x | 1 | x | 3 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 40 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 1 | = | $ - 0 | |
| 3 | High Voltage Emergency Repairs - Outside of Normal Business Hours | x | 40 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (B) | = | $ - 0 |
| C. PARTS | |
| ESTIMATED AMOUNT FOR ENTIRE CONTRACT TERM | $50,000.00 |
| D. EQUIPMENT RENTAL | |
| ESTIMATED AMOUNT FOR EQUIPMENT RENTAL DURING ENTIRE CONTRACT TERM | $30,000.00 |
CRBTC TOTAL BASIS OF AWARD (A+B+C+D) = $ - 0
| 14. CALIFORNIA REHABILITATION CENTER (CRC) | ||||||||
| A. PREVENTATIVE MAINTENANCE, INSPECTION, AND TESTING SERVICES | ||||||||
| EQUIPMENT DESCRIPTION | COST PER SERVICE | x | ESTIMATED QUANTITY | x | ESTIMATED # OF SERVICES | = | TOTAL | |
| SWITCHGEAR | ||||||||
| 1 | Main Switchgear | x | 2 | x | 3 | = | $ - 0 | |
| 2 | Switchgear | x | 3 | x | 3 | = | $ - 0 | |
| 3 | Switchgear Filter, Lights, & Other Components | x | 2 | x | 3 | = | $ - 0 | |
| 4 | Time Delay Starting/Closing Relay - 2 | x | 4 | x | 3 | = | $ - 0 | |
| 5 | Rate of Change Relay - 7 | x | 4 | x | 3 | = | $ - 0 | |
| 6 | Monitor Relay - 25 | x | 2 | x | 3 | = | $ - 0 | |
| 7 | Directional Power Relay - 32 | x | 4 | x | 3 | = | $ - 0 | |
| 8 | Undercurrent/Underpower Relay - 37 | x | 1 | x | 3 | = | $ - 0 | |
| 9 | Field Over/Under Excitation Relay - 40 | x | 2 | x | 3 | = | $ - 0 | |
| 10 | Reverse-phase or Phase-Balance Current Relay - 46 | x | 4 | x | 3 | = | $ - 0 | |
| 11 | Incomplete Sequence Relay - 48 | x | 1 | x | 3 | = | $ - 0 | |
| 12 | Transformer Thermal Relay - 49 | x | 12 | x | 3 | = | $ - 0 | |
| 13 | Rectification Failure Relay - 58 | x | 2 | x | 3 | = | $ - 0 | |
| 14 | Voltage or Current Balance Relay - 60 | x | 2 | x | 3 | = | $ - 0 | |
| 15 | Time-Delay Stopping or Opening Relay - 62 | x | 2 | x | 3 | = | $ - 0 | |
| 16 | Alarm Relay - 74 | x | 1 | x | 3 | = | $ - 0 | |
| 17 | DC Overcurrent Relay - 76 | x | 2 | x | 3 | = | $ - 0 | |
| 18 | AC Closing Relay - 79 | x | 18 | x | 3 | = | $ - 0 | |
| 19 | Frequency Relay - 81 | x | 10 | x | 3 | = | $ - 0 | |
| 20 | Automatic Selective Control or Transfer Relay - 83 | x | 4 | x | 3 | = | $ - 0 | |
| 21 | Lockout Relay - 86 | x | 4 | x | 3 | = | $ - 0 | |
| 22 | Voltage and Ampere Meters | x | 8 | x | 3 | = | $ - 0 | |
| 23 | Control Transformers | x | 12 | x | 3 | = | $ - 0 | |
| 24 | Instrument Transformers (CT’s, PT’s) | x | 4 | x | 3 | = | $ - 0 | |
| 25 | Potential Transformers | x | 15 | x | 3 | = | $ - 0 | |
| 26 | Control and Instrument Switches | x | 4 | x | 3 | = | $ - 0 | |
| 27 | Position Switch | x | 12 | x | 3 | = | $ - 0 | |
| 28 | Main Circuit Breaker | x | 22 | x | 3 | = | $ - 0 | |
| 29 | Circuit Breaker | x | 15 | x | 3 | = | $ - 0 | |
| 30 | Air Switches | x | 2 | x | 3 | = | $ - 0 | |
| VACUUM SWITCHES | ||||||||
| 1 | Bypass Isolation Switch | x | 8 | x | 3 | = | $ - 0 | |
| 2 | Air Switches | x | 20 | x | 3 | = | $ - 0 | |
| CIRCUIT BREAKER | ||||||||
| 1 | N/A | |||||||
| TRANSFORMERS | ||||||||
| 1 | Dry Type Transformer | x | 15 | x | 3 | = | $ - 0 | |
| 2 | Oil Sampling | x | 1 | x | 3 | = | $ - 0 | |
| AUTOMATIC TRANSFER SWITCHES | ||||||||
| 1 | N/A | |||||||
| CIRCUIT SWITCHER | ||||||||
| 1 | 3-Phase High Voltage Switch | x | 16 | x | 3 | = | $ - 0 | |
| 2 | Relays | x | 10 | x | 3 | = | $ - 0 | |
| CAPACITOR BANK | ||||||||
| 1 | N/A | |||||||
| CONTINUOUS LOAD RECORDING | ||||||||
| 1 | 7-day period | x | 2 | x | 3 | = | $ - 0 | |
| POWER POLES | ||||||||
| 1 | Cross Arms | x | 25 | x | 3 | = | $ - 0 | |
| 2 | Fuses | x | 10 | x | 3 | = | $ - 0 | |
| 3 | F6-PA-LS control Reclosure | x | 2 | x | 3 | = | $ - 0 | |
| TOTAL BID AMOUNT FOR SECTION (A) | = | $ - 0 |
| B. REPAIRS | ||||||
| SERVICE DESCRIPTION | HOURLY RATE | x | ESTIMATE NUMBER OF HOURS | = | TOTAL | |
| 1 | High Voltage Routine Repairs - Scheduled | x | 120 | = | $ - 0 | |
| 2 | High Voltage Emergency Repairs - Normal Business Hours | x | 90 | = | $ - 0 |