Addendum No. 3 to RFP 17F-26 - CNG Bus Overhaul Machining Services

This is an addendum issued by the Massachusetts Bay Transportation Authority (MBTA) dated March 13, 2026, that amends Request for Proposals 17F-26 for machining, overhaul, and remanufacturing services for Cummins ISL CM2180 8.9L CNG engines supporting the SR1982 fleet of 175 New Flyer CNG buses. The addendum revises the contract term and updates Scope of Work requirements. The contract term has been modified to two years (24 months), and the addendum introduces new provisions governing material procurement, labor hour limitations, and component replacement procedures. Proposers are required to acknowledge receipt of this addendum in their proposal submissions.

The addendum establishes specific operational requirements for contract performance: contractors must first coordinate with the MBTA Project Team to determine material availability through MBTA inventory before procuring materials independently, and all material purchases must be supported by vendor invoices and reimbursed at actual cost with no markup permitted, not to exceed fifteen percent of total contract value without written MBTA approval. Labor hours for overhaul and remanufacturing of any single engine are limited to 120 hours unless additional hours receive prior written authorization from the MBTA Project Team. The contractor must inspect all engine components for condition and serviceability per applicable technical specifications and may only replace components determined to be worn, damaged, or not serviceable. Replacement of major components requires written authorization from the MBTA Project Team prior to proceeding, and MBTA reserves the right to request return, inspection, or photographic documentation of removed components to verify necessity of replacement. MBTA also reserves the right to review and audit all invoices and supporting documentation, and material purchases made without prior written authorization are ineligible for reimbursement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Bay Transportation Authority Ten Park Plaza, Boston, MA 02116 mbta.com

Date Issued: March 13th, 2026

ADDENDUM NO. 3

RFP17F-26 | CNG Bus Overhaul Machining Services for Cummins Engines

1. PURPOSE OF ADDENDUM

This Addendum is issued to amend the above-referenced Request for Proposals (RFP17F-26).

The purpose of this Addendum is to revise the contract term and update the Scope of Work requirements.

2. REVISIONS

• Section 2.4 – Contract Term

Section 2.4 is hereby revised as follows:

The contract shall remain in effect for a period of two (2) years (24 months).

• Section 2.1 – Scope of Work

Section 2.1 is hereby revised to include the following provisions:

MBTA Inventory Coordination: If materials are required for the performance of the work, the Contractor shall first coordinate with the MBTA Project Team to determine whether such materials are available through the MBTA inventory. If MBTA determines that the required materials are not available, the Contractor shall obtain written authorization from the MBTA Project Team prior to procuring such materials.

Material Purchase Requirements: All material purchases shall be supported by vendor invoices and shall be reimbursed at actual cost with no markup permitted. The total value of material purchases under this contract shall not exceed fifteen percent (15%) of the total contract value unless otherwise approved in writing by MBTA.

Invoice Review and Authorization: MBTA reserves the right to review and audit all invoices and supporting documentation related to material purchases under this contract. Any material purchases made without prior written authorization from MBTA shall not be eligible for reimbursement.

Labor Hour Limitations: Labor hours charged for work performed under this contract shall be reasonable, necessary, and consistent with standard industry practices for comparable engine overhaul work. Unless otherwise authorized in writing by MBTA, the total labor hours charged for the overhaul and remanufacturing of any single engine shall not exceed one hundred twenty (120) hours. Any additional labor hours must receive prior written approval from the MBTA Project Team.

Component Inspection and Replacement: The Contractor shall inspect all engine components and determine the condition and serviceability of each part in accordance with applicable technical specifications. Components shall only be replaced when they are determined to be worn, damaged, or otherwise not serviceable in accordance with manufacturer or MBTA requirements.

Major Component Authorization: Replacement of major components shall require written authorization from the MBTA Project Team prior to proceeding. MBTA reserves the right to request return, inspection, or photographic documentation of removed components to verify condition and confirm that replacement was necessary.

3. ACKNOWLEDGMENT

All other terms, conditions, and specifications of RFP17F-26 remain unchanged and in full force and effect.

Proposers are required to acknowledge receipt of this Addendum in their proposal submission.

Sincerely, Terunii Senevirratne.

Strategic Sourcing Manager

1. PURPOSE OF ADDENDUM
This Addendum is issued to amend the above-referenced Request for Proposals (RFP17F-26). The purpose of this Addendum is to revise the contract term and update the Scope of Work requirements.
2. REVISIONS
Section 2.4 – Contract Term
Section 2.4 is hereby revised as follows: The contract shall remain in effect for a period of two (2) years (24 months).
Section 2.1 – Scope of Work
Section 2.1 is hereby revised to include the following provisions:
MBTA Inventory Coordination: If materials are required for the performance of the work, the Contractor shall first coordinate with the MBTA Project Team to determine whether such materials are available through the MBTA inventory. If MBTA determines t...
Material Purchase Requirements: All material purchases shall be supported by vendor invoices and shall be reimbursed at actual cost with no markup permitted. The total value of material purchases under this contract shall not exceed fifteen percent (1...
Invoice Review and Authorization: MBTA reserves the right to review and audit all invoices and supporting documentation related to material purchases under this contract. Any material purchases made without prior written authorization from MBTA shall ...
Labor Hour Limitations: Labor hours charged for work performed under this contract shall be reasonable, necessary, and consistent with standard industry practices for comparable engine overhaul work. Unless otherwise authorized in writing by MBTA, the...
Component Inspection and Replacement: The Contractor shall inspect all engine components and determine the condition and serviceability of each part in accordance with applicable technical specifications. Components shall only be replaced when they ar...
Major Component Authorization: Replacement of major components shall require written authorization from the MBTA Project Team prior to proceeding. MBTA reserves the right to request return, inspection, or photographic documentation of removed componen...