Addendum 3-RFQ-East Pit Advanced Treatment Project .pdf

PDF 132 KB Posted

Attached to
Request for Qualifications East Pit Advanced Treatment Project
Solicitation number
79841
Issued by
Fauquier County, Sugarland Run CDP, Virginia

About this file

This document is Addendum 3 to a Request for Qualifications (RFQ) issued by Frederick Water for the East Pit Advanced Treatment Project at the Henry F. Sliwinski Water Treatment Plant (HFS WTP). The HFS WTP receives raw water from two quarry pits, Pit 2 and East Pit. Due to high total dissolved solids (TDS) and sulfate levels in the East Pit raw water, advanced treatment is required to meet drinking water standards. The objective of this project is to implement innovative and efficient treatment technologies to produce high-quality drinking water.

The addendum provides responses to questions from proposers, including the availability of as-built drawings for the existing facility. The project is located in Fauquier County and Sugarland Run CDP, Virginia. Qualified firms are invited to submit their statements of qualifications for this design-build project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 18, 2024

ADDENDUM 3

Request for Qualifications

Henry F. Sliwinski WTP East Pit Advanced Treatment Project

The following hereby amends and/or modifies the Proposal Documents and Attachments as originally issued for this project. All proposers are subject to the provision of this Addendum.

This Addendum consists of:

Questions from Proposers with Frederick Water’s response

Receipt of all Addendums must be acknowledged in the submitted Proposal. It is the Proposer’s ultimate responsibility to ensure they have all applicable Addenda prior to Proposal submittal.

This acknowledgment must be signed, dated, and included with the submitted Proposal.

Company Name Date

Signature Printed Name

QUESTIONS FROM PROPOSERS

1. Question: Please provide the as-builts for the existing facility/project.

Response: All as-built drawings for the Sliwinski WTP can be found at the link below:

Sliwinski-Orders As-Builts 2024-08-26.zip https://frederickwater.sharepoint.com/:u:/s/Fileshare/EYV9uMaQhNRGs-78oeL5hSoB-cxMTd-ojHb7gao7jU0OvA?e=iA3LL2

File details come from the government source that posted it. Updated .