Addendum 2-RFQ-East Pit Advanced Treatment Project.pdf

PDF 153 KB Posted

Attached to
Request for Qualifications East Pit Advanced Treatment Project
Solicitation number
79841
Issued by
Fauquier County, Sugarland Run CDP, Virginia

About this file

This document is Addendum 2 to a Request for Qualifications (RFQ) issued by Frederick Water for the East Pit Advanced Treatment Project at the Henry F. Sliwinski Water Treatment Plant (WTP) in Virginia. The project involves implementing innovative and efficient treatment technologies to produce high-quality drinking water from the East Pit raw water source, which has elevated TDS and sulfate levels. The addendum provides responses to proposer questions, including the availability of as-built drawings and water quality data, as well as the current and future operating status of the Sliwinski WTP. It also outlines the requirements for acknowledging receipt of the addendum in the submitted proposal.

The related state and local contract opportunity is a Request for Qualifications (RFQ) issued by Frederick Water for a design-build project to provide advanced treatment at the Sliwinski WTP. The project aims to address the water quality issues in the East Pit raw water source and comply with drinking water standards. The RFQ is open to qualified firms in the state of Virginia, specifically the jurisdictions of Fauquier County and Sugarland Run CDP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 15, 2024

ADDENDUM 2

Request for Qualifications

Henry F. Sliwinski WTP East Pit Advanced Treatment Project

The following hereby amends and/or modifies the Proposal Documents and Attachments as originally issued for this project. All proposers are subject to the provision of this Addendum.

This Addendum consists of:

Change Items

Receipt of Addendum 1 must be acknowledged in the submitted Proposal. It is the Proposer’s ultimate responsibility to ensure they have all applicable Addenda prior to Proposal submittal.

This acknowledgment must be signed, dated, and included with the submitted Proposal.

Company Name Date

Signature Printed Name

QUESTIONS FROM PROPOSERS

1. Question: Please provide the as-builts for the existing facility/project.

Response: Record drawings will be posted when they are available.

2. Question: Please provide the information related to the previously water-quality studies for the Plant as well as records/information from the current pilot study.

Response: Frederick Water will release the treatability study and water quality data as part of the RFP.

3. Question: Please advise as to the current status of the Plant Operations as well as plans for the Plant Operations in the future (i.e. servicing of customers from the water produced).

Response The Sliwinski WTP is operating on a weekly basis but the facility is not producing water for distribution. By early December the WTP will be begin treating water from Pit 2 and distributing to customers. In the future, Frederick Water desires to minimize downtime, but can produce water at the Anderson WTP if needed to allow shutdowns of the Sliwinski WTP.