Addendum-3-MMS_Abatement-WA-25-01-09.pdf

PDF 544 KB Posted

Attached to
Middle School Asbestos Abatement
Solicitation number
S-P20015-00012141
Issued by
Lane County, Mcminnville City, Oregon

About this file

This is Addendum 3 for the Mapleton School District's Middle School Asbestos Abatement project, issued by Wilson Architecture on January 9, 2025. The addendum confirms the mandatory pre-bid meeting was held on December 17, 2024, and provides updates to the bidding process, with bids due on January 14, 2025, at 2:00 PM. The document lists ten registered prime bidders and includes an updated MS Abatement Priority Zone Diagram that more accurately represents existing hallway locker bases. The project is divided into Priority Areas A, B, C, and D, with Area C currently occupied and other areas either unoccupied or used for storage.

The addendum clarifies insurance requirements, confirming that both General Liability and Owners & Contractors Protective Liability policies are required, with OCP liability permitted to be endorsed onto the general liability policy. The District will provide Builder's Risk Insurance, modifying the original requirements. The attached diagram shows detailed floor plans with square footage measurements for different priority zones and includes a base bid covering all priority areas (A+B+C+D plus above ceiling and attic level work) along with three alternates: Alternate 1 for Priority Area A, Alternate 2 for Areas A+B, and Alternate 3 for Areas A+B+C.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 3

Client: Mapleton School District

Project: Middle School Asbestos Abatement

Date: January 9, 2025

To: Interested Bidder

Prepared by: Curt Wilson, AIA; Principal, Wilson Architecture

This Addendum modifies the Project Manual, Specifications, and Drawings as follows:

1. General Information

1.1. The Pre-Bid Meeting was held on 12/17/2024. The meeting sign-up sheet was distributed in Addendum 1. Attendance at the meeting is mandatory for prime bidders.

1.2. Addendum 1 was distributed on 12/19/2024.

1.3. Addendum 2 was distributed on 1/6/2025.

1.4. The bids are due on the date identified when the bid documents were issued, which is

2:00 pm on 1/14/2025. See Addendum 2 for additional information.

2. Response to Bidders Questions

2.1. Question: The requirements mention General Liability (GL) and Owners & Contractors

Protective Liability, which are separate policies. Could you please confirm if both are required, or if one or the other is sufficient?

Response: Both are needed. The OCP liability can be endorsed onto the general liability policy

2.2. Question: We also noticed that a builder’s risk insurance special form is mentioned, is this something that could be waived?

Response: The District will purchase Builder’s Risk Insurance. See below for changes to the insurance requirements.

3. Registered Prime Bidders

3.1. 3 Kings Environmental Emily Weiss eweiss@3kingsinc.com

3.2. All Aspects Environmental and Demo Daniel Kennerly Daniel@allaspectsenv.com

3.3. Alpha Environmental Zach Goodman zachary@alphaenvironmental.net

3.4. Alpine Abatement Associates Eric Acovedo Mora service@alpineabatement.com

3.5. ATEZ Inc. Robert Kinyon david@atezinc.com

3.6. Central Oregon Disaster Restoration Brandon Coleman brandon@wraycos.com

3.7. ERI Andy Dellaripa info@enviroresinc.com

3.8. GDSI Nick Sichenzin nick.s@gdsidemo.com

3.9. LOI Environmental Demolition S. Sanders s.sanders@loienviro.com

3.10. PMG Ramon Martinez Ramon@pmgasbestos.com

Addendum 3 Mapleton School District

Middle School Asbestos Abatement Project

Wilson Architecture 1/9/2025 Page 2

4. Changes to Volume 1

4.1. See attached for updated MS Abatement Priority Zone Diagram. The revision associated with Addendum 3 is a more accurate representation of the location of the existing hallway locker bases.

4.2. Spec Section 00 7317 – Insurance Coverage Requirements

a. Change Item F to read: “F. Owner to provide Builder’s Risk Insurance.”

5. Changes to Volume 2

5.1. None.

End of Addendum

6. Attachments

6.1. MS Abatement Priority Zone Diagram

Middle School Asbestos Abatement

Mapleton School District wilson-architecture.com | 541-912-0878

12/4/2024

(ADD 01-12/19/2024)

(ADD 02-1/6/2025)

(ADD 03-1/9/2025)

1MS Abatement Priority Zone Diagram 16'8'4'0'

1/8" = 1'-0"

1,880 sf

1370 sf

650 sf

1625 sf 340 sf

180 sf

65 sf 275 sf

1630 sf

185 sf 65 sf

1,880 sf

(when printed 22"x34")

KEYNOTES

1. EXST WOOD BASE TO BE REMOVED AND

DISCARDED.

2. EXISTING RADIATOR COVER (EXTENDS TO

FLOOR). OWNER TO REMOVE COVER.

EXISTING RADIATOR FRAME TO REMAIN.

EXISTING FLOOR TILES EXTEND UNDER

FRAME. CONTRACTOR TO MOVE FRAME AS

NECESSARY TO ABATE ASBESTOS

CONTAINING MATERIAL.

3. EXISTING RADIATOR COVER (DOES NOT

EXTEND TO FLOOR).

4. EXISTING LOCKERS AND BASE. FIELD

EXPLORATION INDICATES FLOORING DOES

NOT EXTEND BELOW BASE.

5. EXISTING FLOOR-MOUNT TOILET TO BE

REMOVED BY OWNER.

6. EXISTING CRAWL SPACE ACCESS.

7. EXISTING ATTIC ACCESS.

24 4

OCCUPANCY AND SEQUENCE NOTES

Priority Area C is currently occupied. Other areas are unoccupied or used for storage. Isolate Priority Areas A and B from Priority Area D during abatement.

Priority Area C will be vacated when Priority Areas C and/or D are abated.

BID APPROACH

Base Bid: Priority Areas A+B+C+D+Above Ceiling and Attic Level Work Alternate 1: Priority Area A Alternate 2: Priority Areas A+B Alternate 3: Priority Areas A+B+C

ADD 01

ADD 02

ADD 03

ADD 03 NOTE: EXTENT

OF LOCKERS SHOWN

ALIGNS WITH FIELD

MEASUREMENTS

Priority B

Priority A

Priority D

Priority C

File details come from the government source that posted it. Updated .