Addendum 3 to RFP to Operate a Sports and Entertainment Venue at the Edward A. LeLacheur Park
Solicitation number
BD-24-1109-UMBA-10-93780
Issued by
Middlesex County, Lowell City, Massachusetts

About this file

This document is Addendum No. 3 to the Request for Proposals (RFP) issued by the University of Massachusetts Building Authority (the "Authority") for Sports and Entertainment Organizations to Operate LeLacheur Park, The University of Massachusetts Lowell. The addendum provides clarification on the current allowable venue capacity, required permits and licenses, plans for facility improvements, and estimated operating expenses. The facility has a total of 4,797 seats and additional standing room capacity. Facility improvements required to reestablish full occupancy include upgrades to emergency power, concourse concrete, emergency egress hardware, dugout chairlifts, and grandstand structural repairs. The University has pledged $3 million over the next five years toward these stadium repairs and improvements. The successful proposer will be consulted on the prioritization of these facility upgrades. The estimated annual operating budget for the facility is $360,000, which covers field maintenance, building maintenance, utilities, and other expenses. The University will work with the selected proposer to secure the required liquor license.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY

ADDENDUM NO. 3

TO

REQUEST FOR PROPOSALS

TO OPERATE A SPORTS AND ENTERTAINMENT VENUE AT

THE EDWARD A. LELACHEUR PARK

THE UNIVERSITY OF MASSACHUSETTS LOWELL

Date of Addendum October 4, 2023

Proposals Due: October 11, 2023 at 2:00pm

ADDENDUM NO. 3

NOTICE TO RESPONDENTS In accordance with the Request for Proposals (the “RFP”) issued by the University of Massachusetts Building Authority (the “Authority”) on August 25, 2023 for the Request for Proposals for Sports and Entertainment Organizations to Operate LeLacheur Park, The University of Massachusetts Lowell, the Authority is issuing this Addendum No. 3, which includes modifications to the RFP. Except as specifically modified by the information contained in this Addendum No. 3, the RFP remains unchanged.

Revisions to RFP:

Response to Questions:

1. What is the current allowable capacity for guests in the stadium?

a. The current approved occupancy of the facility is approximately 750 spectator seats.

2. What work needs to be completed and what permits or licenses need to be secured to launch a summer season with full stadium capacity?

a. There are a total of 4,797 seats and additional standing room capacity of 233 people.

Aside from the outdoor seating, there are several enclosed spaces. Reestablishing the full spectator seating occupancy will be dependent on completion of improvements to emergency power, concourse concrete, emergency egress hardware, dugout chairlifts, and grandstand structural repairs as determined by the ongoing structural analysis.

b. Contractors will be required to permit construction and repair efforts in accordance with state and local codes and an annual Certificate of Inspection will be required for occupancy. Liquor license will also be required.

3. Who will secure and own the liquor license associated with stadium food & beverage operations?

UMass Lowell and UMBA intend to work with the selected Proposer to secure the liquor license.

4. Section 2(a) mentions a pledge of $3,000,000 from the University over the next five years allocated toward stadium repairs and improvements. This section of the RFP mentions that the funds will be direct toward the categories of code compliance, deferred maintenance, safety and security, and repairs to the outfield wall. Can you please expand on that to describe the specific repair work or plans for work that is anticipated to be done in preparation for a 2024 summer baseball season?

a. The campus has engaged Gale Associates to study and design improvements to the structure supporting the grandstand, concourse concrete, an emergency generator, the replacement and padding of the outfield wall, a physical barrier system to discourage access under the cantilevered Riverwalk behind the outfield wall, emergency egress security hardware, and facility roofs. There is also a need to replace the 2 chairlifts at dugouts.

b. Design efforts are currently in progress for the following projects. As design is in progress, we do not yet have confirmation of budget or schedules required for each item.

• Roof Replacement of (4) Upper Concourse buildings

• Painting

• Outfield Wall – Wall panel replacement; Padding: replace existing & new at

Outfield Wall

• Upper Concourse – Spalled Concrete Repairs

• RiverWalk Security – enclose/secure the underside of the RiverWalk

• Emergency Power System Upgrades (Em Gen, ATS, switchgear)

c. It is anticipated that the full scope outlined above will exceed $3 million, once designs are developed sufficiently for estimating purposes, so some prioritization will be required. The implementation of the prioritized scope will be scheduled over the next few years in coordination with schedules for baseball games and other facility uses, lead times for equipment, and availability of funding. The successful proposer will be consulted as part of the prioritization process.

5. Section 2(b)(7) mentions that Respondents must submit an operating plan covering all costs of the facility in support of occupancy. Can you please provide estimates for the costs of utilities, taxes, insurance, and field maintenance on a monthly or annual basis?

a. Below are the estimated operating expenses for FY23. As a State entity the University is exempt from taxes and is self-insured.

- $60,000 Field maintenance for the pre-season and spring season

- $40,000 Field maintenance for the summer and fall season

- $70,000 Building maintenance (MEP systems, carpentry, roof, painting, etc.)

(estimated @$3/SF)

- $55,000 Housekeeping & trash removal

- $125,000 Utilities – electricity, gas, water, sewer

- $10,000 Snow/Winter Ops

- $360,000 Total estimated annual operation budget required for LeLacheur

Ballpark