ADDENDUM_3_for_rfp.doc

DOC document 31 KB Posted

Attached to
DNR RFP Florida Creek Stream Restoration
Solicitation number
2000015362
Issued by
Brown County, Minnesota

About this file

This document is an Addendum No. 3 to a Request for Proposal (RFP) issued by the Minnesota Department of Natural Resources (DNR) Division of Fish and Wildlife for the Florida Creek Stream Restoration event. The addendum provides question and answer information related to the scope of work, specifically regarding the inclusion of soil borings in the data collection process for the stream design. Vendors are instructed that if they feel soil borings are necessary, they should include them under the appropriate section of the proposal instructions. The event due date has not changed from the original RFP.

The related state and local contract opportunity is for professional services to prepare construction plans and specifications, as well as provide construction inspection and contract administration services for the Florida Creek Stream Restoration project. The project is located in Brown County, Minnesota. Addendums 1 and 2 have also been previously posted for this opportunity.

View the file

Other files

File Type Posted
ADDENDUM_1_for_rfp.doc DOC document
RFP_Florida_Creek_Stream_Restoration.docx DOCX document
ptsamplecontractandexhibits.docx DOCX document
Exhibit_E_-_Plan_Sheets.pdf PDF
ADDENDUM_2_for_rfp.doc DOC document
DNR_RFP_Florida_Creek_Stream_Restoration.pdf PDF
ptrfpattachments.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MINNESOTA

DEPARTMENT OF NATURAL RESOURCES

DIVISION OF FISH AND WILDLIFE

ADDENDUM

Addendum No. 3 to Request for Proposal

FOR

Florida Creek Stream Restoration Event Due Date: March 29, 2024 Time: 2:00 P.M.

New Event Due Date: No Change

VENDORS: EVENT DUE DATE HAS NOT CHANGED.

SCOPE OF ADDENDUM

Questions and Answers:

Question 1. Are soil borings expected to be included as part of the data collection process for the stream design? If so, what level of intensity would be expected, such as at locations where plugs are proposed or at tie in points between existing and historic channel?

Answer 1. If you feel soil borings are necessary for the design, you should include them under Section 3, Proposal Instructions and Additional Information, #3. Additional Tasks or Activities.

This addendum shall become part of the proposal.

This vendor shall acknowledge the addendum by submitting this form with their proposal.

File details come from the government source that posted it. Updated .