This is an Addendum 3 document for the George J. Hatfield State Recreation Area Campground Improvements project in California. The addendum addresses modifications and clarifications to the original solicitation for comprehensive campground and facility enhancements at the state recreation area. The document serves to update bidders on changes to project requirements, specifications, or contract terms prior to bid submission, ensuring all parties have the most current information regarding the scope of work, deliverables, and any adjustments to the original bid documents or timeline.

The specific details contained within Addendum 3, including pricing adjustments, modifications to work items, changes to deadlines, clarifications on site conditions, or updates to any set-asides or contractual terms, would be outlined in the full content of the addendum document itself. This addendum is a critical component of the bidding process as it represents the final or most recent guidance from the contracting agency and must be acknowledged and incorporated by all bidders submitting proposals for the campground improvements project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of California • Natural Resources Agency Gavin Newsom, Governor

DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director 2241 Harvard Street, Suite 200 Sacramento, CA 95815

ADDENDUM #3

Issued: November 4, 2026

GEORGE J. HATFIELD SRA

Campground Improvements

Bid Number: C26863031

Bid Date: December 9, 2026, 2 PM

The changes in this addendum shall be included in the Project and this addendum shall be part of the Project documents. All conditions not affected by this addendum shall remain unchanged.

1. Project Manual - Specifications:

1. ADD Geotechnical Report (Attachment 1, 64 pages)

END OF ADDENDUM #2

Attachments:

1. Geotechnical Report, 64 pages

GEOTECHNICAL INVESTIGATION

George J. Hatfield State Recreation Area Campground Improvements

Merced County, California

Project No. S2485-05-37 December 31, 2025

VIA EMAIL

Samantha Frazier Project Manager California State Parks Northern Service Center 2241 Harvard Street, Suite 200 Sacramento, California 95815

Subject: GEOTECHNICAL INVESTIGATION

GEORGE J. HATFIELD STATE RECREATION AREA CAMPGROUND IMPROVEMENTS

MERCED COUNTY, CALIFORNIA

Ms. Frazier:

In accordance with Agreement No. C22863017, Work Order #17-037940-53 dated March 5, 2025, we have prepared this geotechnical investigation report for the proposed George J. Hatfield State Recreation Area campground improvements, located northeast of the City of Newman in Merced County, California.

The accompanying report presents our findings, conclusions, and recommendations regarding the geotechnical aspects of designing and constructing the project as presently proposed. In our opinion, the project is feasible from a geotechnical viewpoint provided our recommendations are incorporated into the design and construction of the project.

Please contact us if you have any questions concerning the contents of this report or if we may be of further service.

Respectfully submitted, GEOCON CONSULTANTS, INC.

Lauren A. Herbert, EIT, GIT Senior Staff Engineer

Jeremy J. Zorne, PE, GE Senior Engineer

3160 Gold Valley Drive, Suite 800 Rancho Cordova, California 95742 Telephone (916) 852-9118

George J. Hatfield State Recreation Area Campground Improvements

Geotechnical Investigation

TABLE OF CONTENTS

GEOTECHNICAL INVESTIGATION PAGE

1.0 PURPOSE AND SCOPE

2.0 SITE AND PROJECT DESCRIPTION

3.0 SOIL AND GEOLOGIC CONDITIONS

3.1 Site and Regional Geology

3.2 Existing Pavement

3.3 Young Alluvium

3.4 Patterson Alluvium, Proximal Fans

4.0 GROUNDWATER

5.0 GEOLOGIC HAZARDS

5.1 Regional Active Faults / Surface Fault Rupture Hazard

5.2 Ground Shaking

5.3 Liquefaction

5.4 Expansive Soil

5.5 Soil Corrosion Screening

6.0 CONCLUSIONS AND RECOMMENDATIONS

6.1 General

6.2 Seismic Design Criteria

6.3 Soil and Excavation Characteristics

6.4 Materials for Engineered Fill

6.5 Grading/Earthwork

6.6 Trench Bottom / Bearing Conditions / Foundation for Pipeline

6.7 Pipe Loading Design Criteria (Flexible Conduit)

6.8 Pipe Bedding and Trench Backfill

6.9 Foundations – Spread Footings / CIDH Concrete Piers

6.10 Concrete Flatwork

6.11 Gravel Surfacing

6.12 Pavement – Hot Mix Asphalt

6.13 Rigid Concrete Pavement

6.14 Site Drainage and Moisture Protection

7.0 FURTHER GEOTECHNICAL SERVICES

7.1 Plan and Specification Review

7.2 Testing and Observation Services

8.0 LIMITATIONS AND UNIFORMITY OF CONDITIONS

9.0 REFERENCES

FIGURES

Figure 1, Vicinity Map Figure 2, Aerial Site Map Figure 3, Proposed Development Plan Figure 4, Regional Geologic Map

TABLE OF CONTENTS (Continued)

APPENDIX A

FIELD INVESTIGATION

Key to Logs Logs of Borings B1 through B7

APPENDIX B

LABORATORY TESTING PROGRAM

Table B1, Resistance Value (R-value) Test Results Laboratory Results Summary Atterberg Limits Gradation Report Compaction Test Reports (2)

APPENDIX C

SEISMIC DESIGN ANALYSIS

Multi-Period MCER Spectrum ASCE Design Hazards Reports: Site Classes C, CD, and D

Geocon Project No. S2485-05-37 - 1 - December 31, 2025

GEOTECHNICAL INVESTIGATION

1.0 PURPOSE AND SCOPE

This report presents the results of our geotechnical investigation report for the proposed George J. Hatfield State Recreation Area campground improvements, located northeast of the City of Newman in Merced County, California. The approximate site location is shown on the Vicinity Map, Figure 1.

The purpose of our geotechnical investigation was to evaluate subsurface conditions at the site and provide geotechnical engineering recommendations and design parameters for the project as presently proposed. Our investigation included field exploration, geotechnical laboratory testing, engineering analysis, and preparation of this report.

To prepare this report, we performed the following scope of services:

• Performed a limited geologic literature review to aid in evaluating the geologic conditions present at the site and vicinity.

• Coordinated with State Parks and performed a site reconnaissance to review project limits and mark out exploratory excavation locations for subsequent utility clearance.

• Retained the services of a private utility locator to further identify locations of potential underground utilities within proposed excavation locations.

• Notified subscribing utility companies via Underground Service Alert (USA) a minimum of two working days (as required by law) prior to performing exploratory excavations at the site.

• Paid required fees and obtained a drilling permit from the Merced County Division of Environmental Health (MCDEH).

• Retained the services of a California C57-licensed drilling subcontractor to perform exploratory borings.

• Drilled seven (7) exploratory borings (Borings B1 through B7) in the proposed development areas using a truck-mounted CME-55 drill rig equipped with auger drilling capabilities to depths ranging from approximately 6½ to 16½ feet.

• Logged the borings in general accordance with the Unified Soil Classification System (USCS).

• Obtained representative disturbed and relatively undisturbed soil samples from the exploratory borings.

• Upon completion, backfilled the borings with drill cuttings or neat cement grout in accordance with MCDEH requirements. Patched borings in paved areas with black-dyed rapid-set concrete.

• Performed laboratory tests on selected samples to evaluate pertinent geotechnical parameters.

• Analyzed the field and laboratory testing data and prepared this report summarizing our findings, conclusions, and recommendations regarding the geotechnical aspects of designing and constructing improvements as presently proposed.

Geocon Project No. S2485-05-37 - 2 - December 31, 2025

Approximate locations of the borings are shown on the Aerial Site Map, Figure 2, and Proposed Development Plan, Figure 3. Details of our field exploration program including boring logs are presented in Appendix A. Details of our laboratory testing program and test results are summarized in Appendix B. Details of our seismic design parameter analysis and related information are presented in Appendix C.

2.0 SITE AND PROJECT DESCRIPTION

The project is located within the George J. Hatfield State Recreation Area, located northeast of the City of Newman in Merced County, California. The approximately 46.5-acre park is located within riparian habitat west of the Merced River and is surrounded by agricultural fields. The park is currently developed with an entrance kiosk, parking facilities, campsites, picnic areas, and public restrooms, with associated utilities. Site topography is slightly hilly with elevations ranging between approximately 65 and 125 feet above mean sea level (MSL; Google Earth, 2025; USGS, 2021). Vegetation consists of mature trees with an undergrowth of seasonal grasses and brush.

The project consists of improvements within the southern campground portion of the park, including upgrading accessibility and electricity for two existing comfort stations; enlarging and resurfacing day use and camping parking areas; installing concrete pads, grills, electricity, and water at a group campsite; installing shade ramadas, an information kiosk, tables, grills, and water at a day use area;

installing water and electricity lines at a camp host site; installing split-rail fencing and signage throughout; providing concrete pads for ADA accessible day use sites; and creating screened dumpster areas. We assume that the proposed shade ramadas and information kiosk will be supported on shallow spread footings or cast-in-drilled-hole (CIDH) concrete piers. Water system upgrades are expected to include new 2-inch water service pipes connecting new water stations to existing comfort stations. We understand that the new water lines will be buried on the order of one to three feet deep. Associated improvements may include underground utility infrastructure, Portland cement concrete (PCC) flatwork, hot-mix-asphalt (HMA) paved parking areas and roadways, and perimeter fencing and landscaping. Based on site topography and the planned improvements, we expect cuts and fills on the order of 5 feet or less with some utilities slightly deeper.

The approximate locations of the proposed improvements are shown on the Aerial Site Map, Figure 2, and Proposed Development Plan, Figure 3.

Geocon Project No. S2485-05-37 - 3 - December 31, 2025

3.0 SOIL AND GEOLOGIC CONDITIONS

We identified geologic and soil conditions by observing and sampling exploratory borings and reviewing the referenced geologic literature (Section 9.0). Soil descriptions provided below include the USCS symbol where applicable.

3.1 Site and Regional Geology

The site is located within the Great Valley Geomorphic Province of California, more commonly referred to as the San Joaquin Valley. The San Joaquin Valley is a broad depression bounded by the Sierra Nevada mountain range to the east, the Coast Ranges to the west, and the Sacramento-San Joaquin delta to the northwest. The valley has been filled with a thick sequence of sediments derived from weathering of the adjacent mountain ranges, resulting in a stratigraphic section of Cretaceous, Tertiary, and Quaternary deposits.

Published geologic mapping depicts the site vicinity underlain by Holocene-age alluvial deposits (map symbols Qha and Qhp, Wills et al., 2022). The subsurface conditions encountered during our field investigation at the site were generally consistent with the mapped geology of the area, including sands, silts, and minor clays. A portion of the geologic map covering the site vicinity is presented as Figure 3, Regional Geologic Map.

3.2 Existing Pavement

The existing pavement section encountered in Borings B2, B4, and B5 consist of approximately 2½ inches of hot mix asphalt (HMA). Beneath the HMA in Boring B5, we encountered approximately 5 inches of aggregate base (AB) material. We did not observe AB below the HMA in the other borings.

3.3 Young Alluvium

At the surface in Borings B1 and B3 and below the pavement section in Boring B2, we encountered young alluvial deposits to the maximum depth explored of approximately 16½ feet. The alluvium generally consists of soft to stiff sandy silt (ML), and loose to medium dense silty sand (SM), poorly graded sand with silt (SP-SM), and poorly graded sand (SP) with trace silt.

Geocon Project No. S2485-05-37 - 4 - December 31, 2025

3.4 Patterson Alluvium, Proximal Fans

Below the pavement section in Borings B4 and B5 and below the pavement section in Borings B6 and B7, we encountered young proximal fan alluvial deposits to the maximum depth explored of approximately 16½ feet. The alluvium generally consists of interbedded layers of loose silty sand (SM) and poorly graded sand (SP) with trace silt, and medium stiff sandy silt (ML).

Soil and geologic conditions described in the previous paragraphs are generalized. The exploratory boring logs included in Appendix A provide details regarding soil type, color, moisture content, and USCS classification of the soils encountered at specific locations and elevations.

4.0 GROUNDWATER

Groundwater was not encountered in our borings drilled on December 2, 2025. Available depth-to-groundwater data on the California Department of Water Resources (DWR) Sustainable Groundwater Management Act (SGMA) Data Viewer https://sgma.water.ca.gov/webgis/?appid=SGMADataViewer#gwlevels) indicate that depth to groundwater at the site ranged from 20 to 40 feet in Spring 2025 (DWR, 2025).

Static water levels at well sites within approximately ½ mile of the site ranged from 10 to 22 feet BGS between 1953 and 2014.

Due to the proximity of the site to the Merced River, it should be noted that groundwater may be encountered at approximately the elevation of the water surface of the river, and that the site is also prone to flooding during high volumes of water within the river. Fluctuations in the level of groundwater may occur due to variations in rainfall, temperature, and other factors. Therefore, it is possible that groundwater may be higher or lower than the levels observed during our investigation.

5.0 GEOLOGIC HAZARDS

5.1 Regional Active Faults / Surface Fault Rupture Hazard

The numerous faults in California include Holocene-active, pre-Holocene (Quaternary), and inactive faults (pre-Quaternary). The criteria for these major groups were developed by the California Geological Survey (CGS, formerly known as the California Division of Mines and Geology) for the Alquist-Priolo Earthquake Fault Zone Program (CGS, 2018). By definition, a Holocene-active fault is one that has had surface displacement within Holocene time (about the last 11,700 years). A pre-Holocene fault has demonstrated surface displacement during Quaternary time (approximately the last 1.6 million years) but has had no known Holocene movement. Faults that have not moved in the last 1.6 million years are considered inactive.

Geocon Project No. S2485-05-37 - 5 - December 31, 2025

According to the Fault Activity Map of California by the California Geological Survey (CGS, https://maps.conservation.ca.gov/cgs/fam/), the closest fault with historic displacement is the Central Calaveras fault section of the Calaveras fault zone, a well constrained right lateral fault located approximately 36.8 miles southwest of the site. Mapping by the United States Geological Survey (USGS, https://earthquake.usgs.gov/cfusion/hazfaults_2008_search/query_results.cfm) indicates that the closest mapped Holocene-active fault is the Cottonwood Arm section of the Ortigalita fault zone, a well constrained right lateral fault located approximately 18.0 miles southwest of the site. The closest mapped pre-Holocene (Quaternary) fault to the site is the Orestimba (GV 07) section of the Great Valley thrust fault system, an inferred, undifferentiated Quaternary thrust fault located 7.9 miles west-southwest of the site.

The site is not within a state-designated Alquist-Priolo Earthquake Fault Zone for surface fault rupture hazards (CGS, 2025). No Holocene-active or pre-Holocene faults with the potential for surface fault rupture are known to pass directly beneath the site. Therefore, the potential for surface rupture due to faulting occurring beneath the site during the design life of the proposed development is considered low.

5.2 Ground Shaking

Disaggregation of the Maximum Considered Earthquake (MCE) peak ground acceleration (PGA) was performed using the USGS online Earthquake Hazard Toolbox, NSHM Conterminous U.S. 2018 edition.

The result of the disaggregation analysis indicates that the predominant earthquake contributing to the MCE peak ground acceleration is characterized as a 6.3 magnitude event occurring at a hypocentral distance of 12.4 kilometers from the site.

5.3 Liquefaction

Liquefaction is a phenomenon in which saturated cohesionless soils are subject to a temporary loss of shear strength due to pore pressure buildup under the cyclic shear stresses associated with earthquakes. Primary factors that trigger liquefaction are strong ground shaking (seismic source); relatively clean, loose granular soils (primarily poorly graded sands and silty sands); and saturated soil conditions.

The site is not located in a currently established State of California Seismic Hazard Zone for liquefaction.

Based on the subsurface conditions encountered at the site, including loose cohesionless sand and shallow groundwater, liquefaction is a potential hazard for the site. Liquefaction could result in ground surface settlement and/or ground loss due to sand boils. However, the proposed improvements, including open-sided shade ramadas and an information kiosk, are not considered habitable structures and for economic and practical reasons, ground improvement to reduce liquefaction potential or deep foundation systems for these minor structures are not practical or necessary for the project. State Parks must recognize the possibility that if liquefaction were to occur, structural damage to the ramadas and kiosk is possible.

Geocon Project No. S2485-05-37 - 6 - December 31, 2025

5.4 Expansive Soil

Laboratory Atterberg Limits testing on a selected near-surface soil sample indicates low plasticity soil which corresponds to low expansion potential. Mitigation and specific design measures with respect to expansive soil are not necessary for the project.

5.5 Soil Corrosion Screening

We performed pH, resistivity, chloride, and sulfate tests on two representative soil samples to generally evaluate the corrosion potential of the soil with respect to proposed subsurface structures. These tests were performed in accordance with California Test Method (CTM) Nos. 643, 422, and 417. The results are presented in Table 5.5A and should be considered for design of underground structures.

TABLE 5.5A

SOIL CORROSION PARAMETER TEST RESULTS

(CALIFORNIA TEST METHODS 643, 417, AND 422)

Sample No. Sample Depth (ft.) pH

Minimum Resistivity (ohm-cm)

Chloride (ppm)

Sulfate (ppm)

B3-3.0 3 7.3 900 360 250 Note: ppm = parts per million

Soil with a low pH (higher acidity) is considered corrosive as it can react with lime in cement to leach out soluble reaction products and result in a more porous and weaker concrete. Per Caltrans Corrosion Guidelines (Caltrans, 2021), soil with a pH of 5.5 or lower may be corrosive to concrete or steel in contact with the ground. Based on the laboratory pH test results and Caltrans criteria, soil at the locations tested does not have a high propensity for corrosion.

Soil resistivity is the measure of the soil’s ability to transmit electric current. Corrosion of buried ferrous metal is proportional to the resistivity of the soil. A lower resistivity indicates a higher propensity for transmitting electric currents that can cause corrosion of buried ferrous metal items. In general, the higher the resistivity, the lower the rate for corrosion. Per Caltrans Corrosion Guidelines, resistivity serves as an indicator parameter for the possible presence of soluble salts and it is not included as a parameter to define a corrosive area for structures. A minimum resistivity value for soil less than 1,500 ohm-cm may indicate the presence of high quantities of soluble salts and a higher propensity for corrosion. Based on the laboratory minimum resistivity test results and Caltrans criteria, soil at the locations tested has a high propensity for corrosion.

Geocon Project No. S2485-05-37 - 7 - December 31, 2025

Table 5.5B presents a summary of concrete requirements set forth by the California Building Code (CBC) Section 1904 and American Concrete Institute (ACI) 318 for possible chloride exposure. Chlorides can break down the protective oxide layer on steel surfaces resulting in corrosion. Sources of chloride include, but are not limited to, deicing chemicals, salt, brackish water, seawater, or spray from these sources.

TABLE 5.5B

REQUIREMENTS FOR CONCRETE EXPOSED TO CHLORIDE-CONTAINING SOLUTIONS

(AFTER ACI 318 TABLES 19.3.1.1 and 19.3.2.1)

Chloride Severity

Exposure Class Condition

Maximum Water to Cement Ratio by Weight

Minimum Compressive Strength (psi)

Not Applicable C0 Concrete dry or protected from moisture N/A 2,500

Moderate C1 Concrete exposed to moisture but not to external sources of chlorides N/A 2,500

Severe C2 Concrete exposed to moisture and an external source of chlorides 0.40 5,000

The appropriate Chloride Severity/Exposure Class should be determined by the project designer based on the specific conditions at the location of the proposed structure. Further guidance is provided in ACI 318. Per Caltrans Corrosion Guidelines, soil with a chloride concentration of 500 ppm or higher may be corrosive to steel structures or steel reinforcement in concrete. Based on Caltrans criteria, soil at the locations tested is not corrosive with respect to chloride content.

Table 5.5C presents a summary of concrete requirements set forth by CBC Section 1904 and ACI 318 for sulfate exposure. Similar to chlorides, sulfates can break down the protective oxide layer on steel leading to corrosion. Sulfates can also react with lime in cement to soften and crack concrete.

Geocon Project No. S2485-05-37 - 8 - December 31, 2025

TABLE 5.5C

REQUIREMENTS FOR CONCRETE EXPOSED TO SULFATE-CONTAINING SOLUTIONS

(AFTER ACI 318 TABLES 19.3.1.1 and 19.3.2.1)

Sulfate Severity

Exposure Class

Water-Soluble Sulfate (SO4) Content Cement

Type

(ASTM

C 150)

Maximum Water to Cement Ratio by Weight1

Minimum Compressive Strength (psi) Percent By

Mass Parts Per Million

(ppm)

Not Applicable S0 SO4 < 0.10 SO4 < 1,000 No Type

Restriction N/A 2,500

Moderate S1 0.10 < SO4 <

0.20 1,000 < SO4 < 2,000 II 0.50 4,000

Severe S2 0.20 < SO4 < 2.00

2,000 < SO4 <

20,000 V 0.45 4,500

Very Severe

S3 – Option 1

SO4 > 2.00 SO4 > 20,000

V+Pozzolan or Slag 0.45 4,500

S3 – Option 2 V 0.40 5,000

Note:

1. Maximum water to cement ratio limits are different for lightweight concrete, see ACI 318 for details.

Based on the laboratory test results, the Sulfate Severity is classified as “Not Applicable”, and the Exposure Class is S0. The concrete mix design(s) should be developed accordingly. The presence of water-soluble sulfates is not a visually discernible characteristic; therefore, other soil samples from the site could yield different concentrations. Additionally, over time, landscaping activities (i.e., addition of fertilizers and other soil nutrients) may affect the concentration.

Geocon does not practice in the field of corrosion engineering and the above information is provided as screening criteria only. If corrosion sensitive improvements are planned, we recommend that further evaluations by a corrosion engineer be performed to incorporate the necessary precautions to avoid premature corrosion on buried metal pipes and metal or concrete structures in direct contact with the soils.

Geocon Project No. S2485-05-37 - 9 - December 31, 2025

6.0 CONCLUSIONS AND RECOMMENDATIONS

6.1 General

6.1.1 No soil or geologic conditions were encountered during our investigation that would preclude construction of the proposed project as planned, provided the recommendations contained in this report are incorporated into the design and construction of the project.

6.1.2 The primary geotechnical constraints identified in our investigation are:

• Existing Structures and Utilities: Known existing structures, utilities, and improvements include existing campsites, picnic areas, and public restrooms, with associated utilities.

Additional abandoned and/or active underground utility structures may remain from previous development. Existing improvements and underground utilities in conflict with the proposed improvements will need to be completely removed and/or appropriately abandoned.

• Shallow Groundwater: Groundwater was not encountered during our field investigation to a depth of 16½ feet. However, groundwater has been historically noted within ½ mile of the site between 10 and 22 feet deep. Depending on time of year and annual rainfall, groundwater may be present in project excavations for deep utilities and dewatering may be necessary. Specific recommendations are provided herein.

• Caving and Sloughing Potential: Due to the presence of primarily granular (sandy) soil in the top 16½ feet at the site, excavation sidewall caving/sloughing is possible during project excavations. These conditions may require flattening/sloping back excavation/trench sidewalls and/or trench shoring. General temporary excavation sloping and shoring recommendations are provided herein.

• High In-situ Moisture Content: Moisture content of site soils generally ranges from approximately 1% to 26%. Optimum moisture content for site samples tested at approximately 7% to 13%. We anticipate that soil exposed by excavation may be high in moisture and potentially unstable under construction equipment loading. Additional drying effort (e.g., discing/aeration) to attain moisture contents suitable for compaction should be anticipated regardless of the time of year in soils with high fines content.

6.1.3 Conclusions and recommendations presented herein are based on our review of the referenced literature, analysis of data obtained from our field exploration program and laboratory testing program, and our understanding of proposed improvements at this time.

6.1.4 We should review the project plans as they develop further, provide engineering consultation as needed during final design, and perform geotechnical observation and testing services during construction.

Geocon Project No. S2485-05-37 - 10 - December 31, 2025

6.2 Seismic Design Criteria

6.2.1 The seismic provisions of the 2025 California Building Code (CBC) are based on the American Society of Civil Engineers (ASCE)/Structural Engineering Institute (SEI) publication: ASCE/SEI 7-22, Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE 7-22).

For seismic design purposes, sites are classified based on the average shear wave velocity, v̄s, from the ground surface to a depth of 100 feet. The following table presents the Site Classifications based on average shear wave velocity.

TABLE 6.2.1

SITE CLASSIFICATION

Site Class Average Shear Wave Velocity, v̄s (Feet/Second)

A – Hard Rock 5,000+ B – Medium Hard Rock 3,000 to 5,000

BC – Soft Rock 2,100 to 3,000 C – Very Dense Sand or Hard Clay 1,450 to 2,100 CD – Dense Sand or Very Stiff Clay 1,000 to 1,450

D – Medium Dense Sand or Stiff Clay 700 to 1,000 DE – Loose Sand or Medium Stiff Clay 500 to 700

E – Very Loose Sand or Soft Clay Less Than 500 F – Soils Requiring Site Response Analysis n/a

6.2.2 Where shear wave velocity is not directly measured at the project site, appropriate generalized correlations between shear wave velocity and standard penetration test (SPT) blow counts, Cone Penetration Test (CPT) data, shear strength, or other geotechnical parameters can be used to estimate the shear wave velocity profile. These correlations can be applied where the data extends at least 50 feet deep and where we expect the geology/soil conditions do not possess soft layers below the maximum exploration depth.

6.2.3 For this project, site exploration was performed to a maximum depth of 16.5 feet. Therefore, the seismic design parameters shall be based on the “default condition” which is the most critical spectral response acceleration at each period of Site Classes C, CD, and D.

6.2.4 We used the online ASCE Hazard Tool (https://ascehazardtool.org) to evaluate the code-based seismic design parameters in accordance with ASCE 7-22. The results are summarized in the following table. Appendix C presents the output generated by the ASCE Hazard Tool.

Geocon Project No. S2485-05-37 - 11 - December 31, 2025

TABLE 6.2.4

SEISMIC DESIGN PARAMETERS

Parameter Value ASCE 7-22 Reference

Site Class C CD D Controlling Table 20.1-1

SS

MCER 5% Damped Spectral

Response Acceleration at a Period of 0.2 Seconds for Site Class BC

1.06g 1.06g 1.06g 1.06g

USGS Seismic Design

Geodatabase

S1 MCER 5% Damped Spectral

Response Acceleration at a Period of 1 Second for Site Class BC

0.33g 0.33g 0.33g 0.33g

SMS

MCER 5% Damped Spectral

Response Acceleration at Short Periods Adjusted for Site Class

1.16g 1.3g 1.4g 1.4g

SM1

MCER 5% Damped Spectral

Response Acceleration at a Period of 1 Second Adjusted for Site Class

0.47g 0.67g 0.87g 0.87g

SDS

Design, 5% Damped Spectral

Response Acceleration at Short Periods

0.77g 0.86g 0.94g 0.94g Equation 11.4-1

SD1

Design, 5% Damped Spectral

Response Acceleration at a Period of 1 Second

0.32g 0.45g 0.58g 0.58g Equation 11.4-2

PGAM

Maximum Considered Earthquake

Geometric Mean (MCEG) Peak Ground Acceleration

0.45g 0.49g 0.5g 0.5g USGS Seismic

Design Geodatabase

6.2.5 As shown in Table 6.2.4, the controlling seismic parameter is associated with Site Class D, which is a reasonable classification for the site based on the subsurface conditions encountered in our borings. If required for structural design, the multi-period MCER response spectra are provided in the ASCE Hazard Tool report presented in Appendix D. The two-period MCER response spectra may be constructed based on ASCE 7-22 Section 11.4.5.2 using the values in the table above.

6.2.6 Conformance to the criteria in this section for seismic design does not constitute any kind of guarantee or assurance that significant structural damage or ground failure will not occur in the event of a large earthquake. The primary goal of seismic design is to protect life, not to avoid all damage, since such design may be economically prohibitive.

6.3 Soil and Excavation Characteristics

6.3.1 In our opinion, grading and excavation may be accomplished with moderate effort using heavy-duty grading/excavation equipment.

Geocon Project No. S2485-05-37 - 12 - December 31, 2025

6.3.2 It is the contractor’s responsibility to provide sufficient and safe excavation support as well as to protect nearby utilities, structures, and other improvements which may be damaged by earth movements. Excavation operations should comply with applicable California Occupational Safety and Health Administration (Cal-OSHA) requirements. The condition of existing utility backfill is not known and there is a potential for existing backfill (particularly granular backfill) and/or sandy native soils adjacent to excavations which can cause excavation sidewall instability and sloughing. Adjacent improvements should be monitored by the contractor so that excavation methods and support systems can be modified in a timely manner. The contractor should be aware of the potential for sloughing (and possibly caving/undermining of adjacent ground surface or improvements) and have equipment readily available to install shoring if necessary.

6.3.3 Temporary excavations deeper than 4 feet and entered by workers must meet Cal-OSHA requirements as appropriate. Excavation sloping, benching, the use of trench shields, and the placement of trench spoils should conform to the latest applicable Cal-OSHA standards. The contractor should have a Cal-OSHA-approved “competent person” onsite during excavation to evaluate trench conditions and to make appropriate recommendations where necessary.

6.3.4 The excavation support recommendations provided by Cal-OSHA are generally geared toward protecting human life and not necessarily toward preventing damage to nearby structures or surface improvements. The contractor should be responsible for using the proper active shoring systems or sloping to prevent damage to any structure or improvements near underground excavations.

6.3.5 Based on laboratory testing, in-situ moisture content of site soils generally ranges from approximately 1% to 26% and optimum moisture content is approximately 7% to 13%. Given the variable range of in-situ moisture content, additional grading effort and moisture conditioning will be required to achieve suitable moisture content for compaction. Fine-grained soils at the site with above-optimum moisture content may experience instability under construction equipment loading in project excavations and exposed subgrades.

Difficulty achieving compaction of soils with high moisture content should be anticipated when excavated onsite soil is placed as backfill. Mitigation alternatives may include aerating/drying the exposed soils (assuming favorable weather conditions), or chemical treatment (e.g., lime treatment). Unstable excavation bottoms may require overexcavating 12 to 18 inches and placing crushed rock wrapped in a geotextile fabric or geogrid covered with aggregate for stabilization. We can provide specific recommendations during construction, based on conditions encountered.

Geocon Project No. S2485-05-37 - 13 - December 31, 2025

6.4 Materials for Engineered Fill

6.4.1 Excavated soils at the site are suitable for use as engineered fill in structural areas, provided they do not contain deleterious matter, organic material, or rocks larger than 6 inches in maximum dimension. As previously discussed, excavated soils will have high in situ moisture content, and aerating/drying and/or chemical treatment may be required to achieve proper compaction.

6.4.2 Import soil should be primarily granular with a “very low” expansion potential (Expansion Index less than 20), have a Liquid Limit less than 50, have a Plasticity Index less than 15, be free of organic material and construction debris, not contain rock larger than 6 inches in greatest dimension, and contain sufficient fines to act as a binder to reduce caving potential when excavated.

6.4.3 Environmental characteristics and corrosion potential of import soil materials should also be considered. Proposed import material should be sampled, tested, and approved by Geocon prior to its transportation to the site.

6.5 Grading/Earthwork

6.5.1 Earthwork operations should be observed and fills tested for recommended compaction and moisture content by a representative of our firm.

6.5.2 References to relative compaction and optimum moisture content in this report are based on the latest American Society for Testing and Materials (ASTM) D1557 Test Procedure.

6.5.3 Prior to commencing grading, a pre-construction conference with representatives of the client, the grading contractor, and Geocon should be held at the site. Site preparation, remedial grading, soil handling, and the grading plans should be discussed at the pre-construction conference.

6.5.4 Site preparation should begin with removal of existing pavements, underground utilities, irrigation piping and facilities, vegetation, and debris within areas to be improved. Surface vegetation consisting of grasses and other similar vegetation should be removed by stripping to a sufficient depth to remove grass and organic-rich topsoil. We estimate required stripping depths will range from approximately 2 to 3 inches. Roots greater than 2 inches in diameter of larger trees and bushes should be removed from building pad areas. The actual stripping depth should be determined based on site conditions prior to grading. Material generated during stripping is not suitable for use in engineered fills but may be placed in landscaped or non-structural areas or exported from the site. Excavations or depressions resulting from site

Geocon Project No. S2485-05-37 - 14 - December 31, 2025 clearing operations, or other existing excavations or depressions, should be restored with engineered fill in accordance with the recommendations of this report.

6.5.5 Excavation bottoms, areas to receive fill, or areas left at-grade should be thoroughly scarified to a minimum depth of 12 inches, uniformly moisture-conditioned at or above optimum moisture content, and compacted to at least 90% relative compaction. Scarification and re-compaction operations should be performed in the presence of our representative to evaluate subgrade conditions. Scarified and compacted subgrade soil must be stable before placing engineered fill. Stabilization measures previously discussed may be necessary.

6.5.6 Engineered fill should be compacted in horizontal lifts not exceeding 8 inches (loose thickness) and brought to final subgrade elevations. Each lift should be moisture-conditioned at or above optimum and compacted to at least 90% relative compaction.

6.5.7 The top 12 inches of building/structure pads and flatwork subgrade areas (non-vehicular), whether completed at-grade, by excavation, or by filling, should be uniformly moisture-conditioned at or above optimum moisture content and compacted to 90% relative compaction.

6.5.8 The top 6 inches of pavement area subgrade, whether completed at-grade, by excavation, or by filling, should be uniformly moisture-conditioned at or above optimum moisture content, be compacted to at least 95% relative compaction, and be stable. The 95% relative compaction requirement applies to the top 6 inches of pavement area subgrade; however, underlying materials must be sufficiently compacted and stable. We recommend proof-rolling the subgrade with a loaded water truck (or similar equipment with high contact pressure) to verify the stability of the subgrade prior to placing AB. We note that deeper scarification, moisture-conditioning, and compaction efforts may be required in order to achieve overall stability and compaction.

6.5.9 Underground utility trenches should be backfilled with properly compacted material. Pipe bedding, shading, and backfill should conform to the requirements of the appropriate utility authority. Soil excavated from trenches should be adequate for use as general backfill above shading provided it does not contain deleterious matter, vegetation, or cementations larger than 6 inches in maximum dimension. Trench backfill should be placed in loose lifts not exceeding 8 inches. Lifts should be compacted to a minimum of 90% relative compaction at or above optimum moisture content. Compaction should be performed by mechanical means only; jetting of trench backfill is not recommended.

Geocon Project No. S2485-05-37 - 15 - December 31, 2025

6.6 Trench Bottom / Bearing Conditions / Foundation for Pipeline

6.6.1 Based on conditions encountered in our borings, soil at proposed pipeline depths of approximately 1 to 3 feet are expected to be suitable for support of the water pipeline.

However, given the length of the alignment and geological variations, exposed trench bottom soils can be variable.

6.6.2 Generally, some form of trench bottom stabilization may be necessary where unstable soils are exposed. Since we do not know the extent of potential locally soft or unstable areas, our field representative should provide mitigation recommendations in the field at the time of construction. Typical mitigation alternatives include over-excavation and replacement with a crushed gravel mat wrapped in geosynthetic filter fabric to provide a stable bottom for support of the pipe.

6.6.3 Geocon should be contacted to provide additional recommendations if unsuitable material extends to depths in excess of 3 feet below the pipeline. In extreme cases, pier or pile support, or other structural support, may be necessary.

6.6.4 The weight of pipe, contents, and compacted backfill above the pipe will not result in a significant increase in load over present overburden. Assuming soft and/or unsuitable subgrade areas are mitigated, pipeline settlement should be negligible.

6.7 Pipe Loading Design Criteria (Flexible Conduit)

6.7.1 The new water line will likely be constructed of HDPE or PVC pipe and is designed as a flexible conduit. Trench loading on pipelines is typically computed using Marston’s Formula in accordance with ASCE Manual of Practice No. 60 / WEF Manual of Practice No. FD-5. Trench loading will depend on depth of cover, total unit weight of compacted backfill, surface loading, and installation conditions. We recommend using the following geotechnical values in trench loading calculations:

• Average backfill total unit weight = 130 pounds per cubic foot

• Settlement Ratio (rsd) factor = 0.1

• kµ’ factor = 0.19

6.7.2 Traffic loading, load factors, and other parameters should be determined by the design engineer.

Geocon Project No. S2485-05-37 - 16 - December 31, 2025

6.8 Pipe Bedding and Trench Backfill

6.8.1 Trench backfill operations should be observed and tested for compaction and moisture content by a Geocon representative.

6.8.2 Pipe bedding and pipe zone backfill are defined as material supporting, surrounding, and extending 12 inches above the crown of the pipe. Bedding and pipe zone backfill should conform to specifications of the pipeline manufacturer. This material typically consists of clean sand or fine gravel.

6.8.3 Trench backfill is typically the material placed above the bedding and pipe zone material, starting at one foot above the top of pipe. Excavated native material from the pipeline trenches can be used as trench backfill but should not contain deleterious matter, debris, organic material, rock, or cementations larger than 3 inches in maximum dimension.

6.8.4 All trench backfill should be mechanically compacted. Flooding or jetting is not recommended. In general, backfill should be placed in lifts of 8 to 12 inches or less loose thickness and moisture-conditioned at or above optimum moisture content. All trench backfill should be compacted to at least 90% relative compaction. In roadway/pavement areas, the top 12 inches should be compacted to at least 95% relative compaction.

6.9 Foundations – Spread Footings / CIDH Concrete Piers

6.9.1 The proposed shade ramadas, information kiosk, and other similar structures may be supported on conventional spread footings or CIDH concrete piers. Given the predominantly granular (sandy) soil conditions and the potential for shallow groundwater, spread footings may be preferable since sloughing and caving may occur in CIDH pier excavations.

6.9.2 Spread footings should be at least 18 inches square and be embedded at least 18 inches below lowest adjacent pad grade. Given the relatively loose near-surface granular soils, footing bottoms should be compacted to a minimum relative compaction of 90%.

6.9.3 Underground utilities running parallel to footings should not be constructed in the zone of influence of footings. The zone of influence may be taken to be the area within 18 inches laterally of the footing, beneath the footings, and within a 2H:1V plane extending out and down from a point 8 inches above the bottom of the footing.

6.9.4 Spread footings may be designed using an allowable “net” soil bearing capacity of 2,000 pounds per square foot (psf) for combined dead plus live loads. This value may be increased by one-third to evaluate all loads, including wind or seismic forces.

Geocon Project No. S2485-05-37 - 17 - December 31, 2025

6.9.5 Allowable passive pressure used to resist lateral movement of footings may be assumed to be equal to a fluid weighing 300 pounds per cubic foot (pcf). The allowable coefficient of friction to resist sliding of footings is 0.30 for concrete against soil. Combined passive resistance and friction may be utilized for footing design provided that the frictional resistance is reduced by 50%.

6.9.6 A Geocon representative should observe foundation excavations prior to placing reinforcing steel or concrete to observe that the exposed soil conditions are consistent with those anticipated. If unanticipated soil conditions are encountered, foundation modifications may be required.

6.9.7 CIDH concrete piers should have a minimum diameter of 18 inches and a minimum embedment depth of 6 feet, and be designed using an allowable unit skin friction of 400 psf to resist vertical downward loads. An allowable unit skin friction of 300 psf plus the weight of the pier may be used to resist uplift loads. The allowable downward capacity and allowable uplift capacity may be increased by one-third when considering transient wind or seismic loads. Piers should have a minimum center-to-center spacing of at least three pier diameters. The top 12 inches of embedment should be neglected when calculating axial compression and tension capacities.

6.9.8 Allowable passive pressure used to resist lateral movement of the piers may be assumed to be equal to a fluid weighing 300 pcf with a maximum earth pressure of 3,000 psf. The allowable passive pressure may be applied over two pier diameters for isolated piers with a minimum center-to-center spacing of at least three pier diameters. The allowable passive pressure assumes a horizontal surface extending at least 5 feet or three times the surface generating the passive pressure, whichever is greater. The upper 12 inches of embedment should not be included in the design for lateral resistance.

6.9.9 The bottom of pier excavations should be cleaned of loose cuttings prior to the placement of steel and concrete. Experience indicates that backspinning the auger does not remove loose material, and a flat cleanout plate is necessary. Concrete should be placed within the excavation as soon as possible after the auger/cleanout plate is withdrawn to reduce the potential for caving.

6.9.10 A Geocon representative should be present during pier drilling to confirm that subsurface conditions encountered are consistent with those expected. If unexpected conditions are encountered, foundation modifications may be required.

Geocon Project No. S2485-05-37 - 18 - December 31, 2025

6.10 Concrete Flatwork

6.10.1 Onsite concrete flatwork, such as for walkways, kiosk support, or picnic areas, should be at least 4 inches thick and underlain by at least 4 inches of Class 2 AB compacted to at least 90% relative compaction at or near optimum moisture content. Prior to placing the AB, the top 6 inches of subgrade soil should be uniformly moisture-conditioned at or above optimum moisture content and compacted to 90% relative compaction.

6.10.2 Exterior concrete flatwork should be structurally independent of building foundations except at doorways where it should be dowelled into the adjacent slab. Consideration should be given to providing adequate control joints per American Concrete Institute (ACI) or Portland Cement Association (PCA) guidelines.

6.11 Gravel Surfacing

6.11.1 The picnic and campsite areas may contain areas of gravel surfacing in lieu of concrete flatwork. The site is subject to periodic flooding which may degrade or damage gravel surfacing. In order to provide a more durability and stabilization, gravel surfacing may be underlain by a Type 2 biaxial geogrid place on the prepared and compacted subgrade soil.

The geogrid will help confine the gravel and provide some separation between the gravel and subgrade soil.

6.12 Pavement – Hot Mix Asphalt

6.12.1 We performed Resistance-Value (R-Value) testing on a representative bulk soil sample in accordance with California Test Method (CTM) 301. Our testing resulted in an R-Value of 58 (Appendix B). To account for subgrade soil variability , we recommend using an R-Value of 50 for the purpose of pavement design.

6.12.2 The project civil engineer should determine the appropriate Traffic Index (TI) for pavement design. Table 6.12.2 provides alternative pavement sections based on various TIs. We can provide additional section designs upon request.

TABLE 6.12.2

FLEXIBLE PAVEMENT SECTIONS

Traffic Index 5.0 6.0 6.5 7.0 HMA (in.) 3.0 3.5 4.0 4.0

AB (in.) 4.0 4.0 4.0 4.5 Total Section Thickness (in.) 7.0 7.5 8.0 8.5

Geocon Project No. S2485-05-37 - 19 - December 31, 2025

6.12.3 The recommended alternative pavement sections are based on the following assumptions:

1. Subgrade soil has an R-Value of at least 50.

2. Class 2 AB has a minimum R-Value of 78 and meets the requirements of Section 26 of the latest Caltrans Standard Specifications.

3. Class 2 AB is compacted to 95% or higher relative compaction at or near optimum moisture content. Prior to placing HMA, the AB should be proof rolled with a loaded water truck to verify stability.

4. Pavement subgrade should be compacted in accordance with the recommendations presented in this report.

5. HMA should conform to Section 39 of the latest Caltrans Standard Specifications.

6. Periodic maintenance of HMA pavement is performed.

6.12.4 To reduce the potential for water from landscaped areas migrating under pavement into the AB, full-depth curbs should be used in areas where pavement abuts irrigated landscaping.

The full-depth curbs should be at least 4 inches wide and extend at least 4 inches or more into the soil subgrade beneath the AB. Where no curbs are present, plastic moisture cut-offs should be used. Additionally, modified drop-inlets that contain weepholes should be used to encourage accumulated water to drain from beneath the pavement.

6.13 Rigid Concrete Pavement

6.13.1 If rigid Portland Cement Concrete (PCC) pavement is used, we recommend that the concrete be at least 6 inches thick. PCC pavement should be underlain by at least 6 inches of Class 2 AB meeting the requirements of Section 26 of Caltrans’ Standard Specifications and compacted to at least 95% relative compaction. Subgrade soils should be prepared and compacted in accordance with the recommendations of this report.

6.13.2 PCC should have a minimum 28-day compressive strength of at least 3,500 pounds per square inch (psi). Adequate construction and crack control joints should be used to control cracking inherent in concrete construction. We note that the American Concrete Pavement Association (ACPA) recommends a maximum joint spacing no greater than 24X the slab thickness for PCC pavements directly underlain by granular bases.

Geocon Project No. S2485-05-37 - 20 - December 31, 2025

6.13.3 Steel reinforcement, if used, should be detailed in accordance with PCA, ACI, or similar guidelines. Alternatively, macro synthetic fibers (Euclid Chemical Tuf-Strand SF or equivalent) mixed into the concrete mix may be considered in lieu of conventional steel reinforcement provided it meets the requirements of ASTM C1116 and ASTM D7508 for Type III Synthetic Fibers. If used, we recommend using 1½- to 2-inch-long fibers and a minimum dosage of five pounds per cubic yard of concrete.

6.13.4 Adequate dowels should also be used at joints to facilitate load transfer and reduce vertical offset. In addition, the recommendations in Section 6.5 pertaining to deepened curbs, moisture cut-offs, and subsurface drainage apply to concrete pavements, sidewalks and flatwork, as well as asphalt pavements.

6.13.5 In general, we recommend that concrete pavements be detailed, designed, constructed, and maintained in accordance with industry…