This addendum to the George J. Hatfield State Recreation Area Campground Improvements project, issued by the California Department of Parks and Recreation on October 28, 2026, adds Section 000810 "Constraints and Mitigations" to the project specifications for Bid Number C26863027, with a bid date of November 24, 2026 at 2 PM. The addendum establishes comprehensive environmental and cultural resource protection requirements that contractors must follow throughout the project, including mandatory coordination with State-provided Cultural Resource Specialists and Natural Resource Specialists. Contractors must contact the State's Representative a minimum of seven days prior to construction start and before any demolition, vegetation removal, or ground-disturbing work to schedule monitoring and surveys. The specifications require preconstruction surveys for nesting birds during the February 1 to September 15 nesting season within specified buffer distances, Swainson's hawk surveys within one mile of the project area during March 1 to September 15, and implementation of protective measures for active nests. Equipment staging and storage is limited to designated areas on paved or previously hardened surfaces, with all construction equipment required to be clean and free of soil and plant material to prevent invasive species dispersal.

The addendum establishes strict operational constraints including vehicle speed limits of 15 miles per hour on paved roads, 10 miles per hour on dirt roads, and 5 miles per hour in staging and project action areas. Contractors must implement dust control measures including twice-daily watering and street sweeping, maintain all equipment engines in compliance with State and Federal requirements, and cover all trucks hauling loose materials. The specifications require immediate work cessation and notification to the State's Representative upon discovery of previously unknown cultural resources or human remains, with written approval required before resuming work in affected areas. Contractors must cover excavations overnight and provide escape routes for trapped wildlife, minimize construction noise through best available techniques, keep the project area clear of trash, and restore all disturbed areas to pre-project contours using locally occurring native species. The contract allows for up to five calendar days of downtime for unforeseen conditions requiring resource analysis, with approval required from the State's Representative for any schedule extensions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of California • Natural Resources Agency Gavin Newsom, Governor

DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director 2241 Harvard Street, Suite 200 Sacramento, CA 95815

ADDENDUM #1

Issued: October 28, 2026

GEORGE J. HATFIELD SRA

Campground Improvements

Bid Number: C26863027

Bid Date: November 24, 2026, 2 PM

The changes in this addendum shall be included in the Project and this addendum shall be part of the Project documents. All conditions not affected by this addendum shall remain unchanged.

1. Project Manual - Specifications:

1) ADD Section 000810, ‘CONSTRAINTS AND MITIGATIONS’ (Attachment 1, 6 pages)

END OF ADDENDUM #1

Attachments:

1. Specification Section 000810, Constraints and Mitigations, 6 pages

SECTION 000810

CONSTRAINTS AND MITIGATIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The following requirements supplement the General Conditions, Section 00700.

1.2 RELATED REQUIREMENTS

A. Section 015000 Temporary Facilities and Controls

B. Section 015639 Temporary Tree and Plant Protection

C. Section 329300 Plants

1.3 DEFINITIONS

A. Cultural Resource Specialist – State provided Archaeologist, Historian, and/or Native American representative.

B. Natural Resource Specialist – State provided Environmental Scientist, Environmental Services Intern, or similar qualified State employment classification.

C. DPR-approved Biologist – State provided person with a college degree in Biology, Botany, Animal Science, or closely related field has been vetted through the Department to have adequate knowledge and appropriate work experience to conduct botanical/wildlife surveys or to monitor a project site for environmental compliance purposes.

1.4 SUBMITTALS

A. Temporary Fencing: Contractor shall submit layout, materials, and installation detail.

B. Exclusion Fencing: Contractor shall submit layout, materials, and installation details.

PART 2 – PRODUCTS (Not used).

2.1 MATERIALS

Section 000810 – Page 2 Constraints and Mitigations

PART 3 – EXECUTION

3.1 GENERAL CONSTRAINTS

A. In compliance with the environmental review documents and regulatory permits, the Contractor’s operations are subject to the constraints and environmental protection measures that follow, as well as compliance with any and all constraints or environmental protection measures included in other sections of the Project Manual.

B. Environmental Documents and Permits - The Contractor shall receive all necessary environmental documents from the State’s Representative and shall maintain a copy of each document at the construction site at all times, and shall be presented to personnel from another State, Federal, or local agency upon request.

C. Contractor shall contact State’s Representative a minimum of 7 days prior to the start of construction, as well as prior to demolition, vegetation removal, or any ground-disturbing work, and/or work during dates outlined in 3.2 CULTURAL RESOURCE CONSTRAINTS or 3.3 NATURAL RESOURCE CONSTRAINTS below to schedule cultural and/or natural resource monitoring/surveys/flagging by Cultural/Natural Resource Specialists. Any ensuing directives from the Cultural/Natural Resource Specialist(s) in relation to need for interruption of specific Contractor work will be made through the State’s Representative.

D. Contractor shall notify State’s Representative about any proposed project changes, including but not limited to construction sites, staging and storage locations for vehicles, equipment, materials, and vehicle access routes, for review and approval by Cultural/Natural Resource Specialists a minimum of 5 days in advance of implementation.

E. Contractor shall ensure that State Resource Specialists and regulatory agency personnel have access to the site when the specialist(s) determine it necessary to monitor work and/or resources.

F. Contractor shall stage/store equipment and materials only in designated areas shown on the project plans or Contractor submittals. Staging and storage locations and access routes to designated locations shall be limited to paved surfaces or previously hardened surfaces to minimize soil compaction of native habitat. Care will be taken to avoid placing spoils in undisturbed areas or in wetland habitat. These areas shall be reviewed (in consultation with natural and cultural resource specialists) and approved by the State’s Representative prior to use by the Contractor.

3.2 CULTURAL RESOURCE CONSTRAINTS

A. In the event that previously unknown cultural resources (including but not limited to concentrations of dark soil, shell, bone, flaked stone, Section 000810 – Page 3 groundstone, or deposits of historic materials ([50+ years old] trash, foundations, etc.) are encountered during project construction by anyone:

1. Work shall cease immediately at the location.

2. Contractor shall immediately notify the State’s Representative.

3. Contractor shall not work in this area until receipt of written approval from the State’s Representative to resume activity in the area of the discovery.

4. Contractor shall be redirected to work in other project locations.

B. In the event that human remains are discovered:

1. Work shall cease immediately in the area of the find and the Contractor shall immediately notify the State’s Representative.

2. Work will not resume in the area of the find until proper disposition is complete in accordance with §5097.98 of the California Public Resources Code.

3. Contractor shall be redirected to work in other project locations until Contractor receives written approval from the State’s Representative to resume activity in the area of the discovery.

3.3 NATURAL RESOURCE CONSTRAINTS

A. Nesting Birds:

Preconstruction Surveys for Nesting Birds (not including burrowing owl and Swainson’s hawk). For construction activities occurring during the nesting season (generally February 1 to September 15), surveys for nesting birds shall be conducted by the DPR-approved biologist no more than 7 days prior to start of construction.

1. The survey area for raptor species (including raptors such as white-tailed kite and golden eagle) and migratory birds (including bank swallow and raptor species shall include the disturbance footprint plus a 500-foot and 150-foot buffer, respectively.

2. If an active nest is identified, a DPR-approved biologist will be present to set appropriate buffers and to monitor the active nest to ensure that nesting behavior is not adversely affected by the construction activity. Once the DPR-approved biologist has determined the young have fledged and left the nest, or the nest otherwise becomes inactive under natural conditions, construction activities within the buffer area can occur.

B. Swainson’s Hawk

1. If project construction is to occur between March 1 and September 15 (the Swainson's hawk nesting period), a qualified

Section 000810 – Page 4 biologist will conduct two surveys for actively nesting Swainson's hawks within the project area, as well as within a 1-mile radius of the project area, prior to the start of work. The surveys shall take place at least one week apart, with the second taking place two days prior to the start of construction. If active Swainson's hawk nests are found within 1 mile radius of the work site, clearing and construction shall be postponed or halted within 250 feet of the nests (or another buffer acceptable by CDFW until additional nesting attempts no longer occur. If a nest tree is found on the project site prior to construction and is proposed for removal, then appropriate permits from CDFW shall be obtained and requirements implemented pursuant to CDFW guidelines.

2. Complete avoidance of nesting Swainson's hawks will be assumed if project work occurs outside of the nesting time period (March 1 to September 15), or if no active nests are identified within 1.0 mile of the project area. If project construction is to occur within 1 mile of an active nest, a qualified biologist will monitor the nest for evidence of abandonment.

C. Plantings:

1. All plantings of trees and shrubs will use seeds, cutting, or transplants representing species and gene pools indigenous to the ecological portion of the park in which the planting project is occurring. According to DOM Section 0310.4.1: In order to maintain the genetic integrity and diversity of native California plants, revegetation or transplant efforts will employ local populations. If seeds or plants must be acquired from commercial sources, the origin of the materials should be from within the same ecological region, elevation, and site characteristics as the project area.

D. Contractor shall cover areas of excavation (e.g., pits, trenches, holes) overnight or during periods of inactivity. Routes of escape from excavated pits and trenches shall also be installed for wildlife that could potentially become entrapped.

1. These locations will be regularly inspected by the Contractor, throughout construction and immediately prior to filling.

2. Should any wildlife be discovered within an excavated area, the Contractor shall promptly contact the State’s Representative and temporarily suspend all work at the excavation site until the entrapped animal can be safely relocated by the Natural Resource Specialist or Qualified Biologist.

E. Contractor shall implement the following measures to reduce the introduction and spread of non-native, invasive species:

Section 000810 – Page 5

1. All construction equipment used on this project shall be clean and free of soil and plant material before arrival at the project site and before leaving the park in order to prevent invasive plant seed dispersal.

2. Contractor shall remove all non-native, invasive plant species from disturbed areas prior to replanting.

F. Contractor shall minimize noise during construction through the use of best available techniques.

1. Contractor shall ensure that all internal combustion engines are equipped with a muffler of a type recommended by the manufacturer and that all equipment and trucks use noise attenuation devices, such as engine enclosures, acoustically attenuating shields or shrouds, intake silencers, ducts, etc.

2. Contractor shall locate stationary noise sources (e.g. generators) and staging areas as far away as possible from sensitive receptors (e.g., visitors, staff, wildlife, and/or neighbors). If stationary noise sources must be located near sensitive receptors, Contractor shall muffle construction-related noise sources to the extent feasible and/or where practicable.

G. Work Limit-Vehicle Speed Limit. No vehicle conducting any action or movement on paved access roads may go over fifteen (15) miles per hour. No vehicle conducting any action or movement on dirt access roads may go over ten (10) miles per hour. No vehicle conducting any action or movement within staging areas or in Project action areas may go over five (5) miles per hour.

Vehicles include but are not limited to tractors, excavators, skid-steers, personnel vehicles, pick-up trucks, and dump trucks.

H. Contractor shall keep the project area clear of trash to avoid attracting scavengers/predators. All food and garbage shall be placed in sealed containers and regularly removed from the site.

3.4 AIR QUALITY

A. Contractor shall maintain all equipment engines in good condition, in proper tune (according to manufacturer’s specifications), and in compliance with all State and Federal requirements.

B. All trucks hauling soil, sand, or other loose materials on public roads shall be covered or required to maintain at least two feet of freeboard.

C. Contractor shall apply water (e.g., using water truck) twice daily at sufficient quantities to prevent airborne dust from leaving the Project area. Watering shall be conducted in a manner that prevents any runoff.

D. Contractor shall sweep streets if visible soil material is carried out from the construction site.

Section 000810 – Page 6

3.5 WORK LIMITS

A. No construction activities may occur outside of defined work limits unless approved in writing by the State’s Representative, in consultation with the Cultural and Natural Resource Specialists.

3.6 SITE CONDITIONS

A. If unforeseen cultural and/or natural resources are uncovered during execution of the work, the State’s Representative will put activities on hold at that specific location, and Contractor(s) shall be redirected to work in other project locations. The State Resource Specialist will record and evaluate the find and implement avoidance, preservation, or recovery measures as appropriate in compliance with environmental law and State Parks’ resource directives prior to State’s Representative directing resumption of work at that specific location.

B. Contractor shall include in the project schedule, consideration of up to 5 calendar days down time for unforeseen conditions uncovered during execution of work that may require further resource analysis. Down time days must be approved by the State’s Representative.

C. Following construction, Contractor shall restore all disturbed areas to pre-project contours to the maximum extent possible and revegetated using locally occurring native species and native erosion control seed mix, per the recommendations of the qualified biologist.

3.10 PROTECTION OF EXISTING RESOURCES

A. Contractor shall provide required protection, in areas identified on drawings or as directed by State’s Representative to maintain integrity of the existing resources to be protected during the course of the project.

END OF SECTION 000810