This is Addendum #3 issued by the California Department of Parks and Recreation for the Estero Bluffs State Park Villa Creek Estuary Enhancement project (Bid Number C25863028) located in San Luis Obispo County. The addendum, issued May 11, 2026, with a bid date of May 14, 2026 at 2 PM, clarifies contractor responsibilities and project scope through a question-and-answer format. Key clarifications include that excavated topsoil must be hauled offsite to a permitted facility with no reuse for finishing grades; the State will provide all archaeological, tribal, and biological monitoring services, eliminating contractor obligations in these areas; no willow cuttings or willow pole installations are required as part of this project; low-pressure equipment is not mandated unless specified in design plans; and an existing site entrance must be utilized for ingress and egress to the staging and project areas.

The contractor is responsible for grading operations, submitting and maintaining a Stormwater Pollution Prevention Plan (SWPPP), and managing temporary erosion control best management practices such as silt fences and fiber rolls until project completion. Brian Dewey, representing the owner, will serve as the Legally Responsible Person for SWPPP compliance. Revegetation work is explicitly excluded from the contractor's scope and will be completed by the district, with the State responsible for filing the Notice of Termination once vegetation is established. The project requires compliance with the Public Works Contractor Registration Program under Senate Bill 854, a minimum 6% Disabled Veteran Business Enterprise participation goal with incentives for exceeding this threshold, and a 5% Small Business Preference for certified small businesses submitting completed STD 811 forms.

View the file

Other files

File Type Posted
Addendum_2_C25863028__from_prior_bid_.pdf PDF
Addendum_1_C25863028__from_prior_bid_.pdf PDF
Bid_Forms_C26863004.pdf PDF
Project_Manual_C26863004.pdf PDF
Drawings_C26863004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of California Natural Resources Agency Gavin Newsom, Governor

DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director 2241 Harvard Street, Suite 200 Sacramento, CA 95815

ADDENDUM #3

Issued: May 11, 2026

ESTERO BLUFFS SP

Villa Creek Estuary Enhancement Bid Number: C25863028

Bid Date: May 14, 2026, 2 PM

The changes in this addendum shall be included in the Project and this addendum shall be part of the Project documents. All conditions not affected by this addendum shall remain unchanged.

1. Questions (Q) and Answers (A):

1) Q: Does the off-haul soil need to be taken to a waste facility, or is any permitted dump site permissible?

A: As noted in the soils assessment, the material is not hazardous. The project manual and plans refer to a permitted facility.

2) Q: Since the contractor will need to off haul and dispose of all topsoil excavated on site, does this eliminate the requirement to over excavate by 8” within the limits of grading and place topsoil to finish grade?

A: As noted in the addendum, topsoil must be hauled offsite. No topsoil can be used to finish grade.

3) Q: Will the contractor need to supply archaeological services during grading operations on site?

A: The State will provide archaeological and tribal monitors, as well as biological monitors.

4) Q: Referencing Project Manual Section 062000 Article 1.4.J. Please provide a detail or specification for the number of willow cuttings to be installed at each large wood structure.

A: No willow cuttings are required for or a part of this project.

Addendum #3 Bid Number: C25863028 Issued: May 11, 2026

5) Q: Can the State guarantee a nearby location to harvest willow poles?

A: See above.

6) Q: Please clarify whether the installation of willow poles at each large wood structure should be included within the contractor’s scope or if this work will be completed by others like all other revegetation work.

A: See above.

7) Q: Is low ground pressure equipment necessary for operations on this site?

A: If not called out in the design plans, specialized equipment is not necessary for operations.

8) Q: Please confirm that the owner will be the LRP for the SWPPP.

A: Confirmed. Brian Dewey (Owner) will serve as the Legally Responsible Person

(LRP).

9) Q: If revegetation is to be completed by others, and no erosion control BMPs are to be placed by the contractor, how will the contractor stabilize the site upon project completion, so that a Notice of Termination can be filed?

A: Since the contractor is just responsible for the grading and the revegetation is per the district (I’m assuming). We (DPR) would need to close this out once the vegetation is in place. However, the contractor must submit a SWPPP plan and maintain all temporary BMPs (silt fences, fiber rolls, staging area, etc.) until they complete all their work along with filing an annual report if necessary.

10) Q: Since the contractor will carry the SWPPP, does this mean that filing the Notice of Termination will occur after revegetation work has been completed? Does this mean that the revegetation work is a part of this project?

A: Revegetation is not a part of the contractor’s scope.

11) Q: Is a construction entrance required for this project?

A: There is an existing entrance to the site that provides ingress and egress to the staging area and project site that must be used for the project.