Addendum 3 bid _ 24_008 _ 6th at bank st park.docx

DOCX document 14 KB Posted

Attached to
6th Street @ Bank Street Parking Lot
Solicitation number
PE-72650-NONST-2024-000000005
Issued by
Taliaferro County, Georgia

About this file

This document is Addendum #3 for Bid #24-008 for the 6th Street at Bank Street Parking Lot project in the City of Griffin, Georgia. The project scope includes full-depth reclamation (FDR) of the existing parking lot, which is approximately 111 feet wide by 208 feet long, as well as the installation of new curb and gutter along the parking lot perimeter and center island. The contractor will be responsible for repairing any damaged drainage structures encountered during the FDR process. The parking lot will remain closed for the duration of the project. The contractor will be required to provide a mix design for the FDR, and all millings will remain the property of the City of Griffin.

The contract also includes the removal and replacement of overhead power lines and light poles, which will be coordinated with the City of Griffin Electric. The contractor is responsible for any necessary power outage coordination during the construction process. There are no sidewalk concrete requirements for this project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #3 6th Street at Bank St Parking Lot Bid # 24-008

1. Will the depth for the milling be 2”? Can a milling item be added to the bid schedule?

With this being a FDR the milling should be included in the pricing for the total depth listed for the FDR

1. Will we be required to provide a mix design or will the city provide a mix design? Contractor will provide the mix design

1. Will the contractor be responsible for any drainage structures that may be in the parking lot? Any drain structures that are damaged during FDR will be the responsibility of the contractor to repair. If damaged drain is found during a pot holing process, then will need to work with the City of Griffin for repairs.

1. Just to verify, there is no sidewalk concrete required on this project? No sidewalks are included in this bid

1. Will the parking lot stay closed through the duration of the project? Yes, the parking lot will remain closed for the duration of the project.