addendum 2 stearns signed.pdf

PDF 644 KB Posted

Attached to
Request for bids. City of Oakland, OR. Stearns Park Restrooms Replacement
Solicitation number
S-K01070-00001797
Issued by
Douglas County, Oregon

About this file

This document is an Addendum #2 to the bid form for the Construction of Stearns Park Restrooms Replacement project for the City of Oakland, Oregon. The project requires the furnishing of all labor, equipment, materials, and supervision for the installation of two new restrooms, including minor excavation and demolition, installation of subgrade, clearing and grading, installation of two 66.7 sf prefabricated Romtec bathrooms or equivalent, paving, water, storm drain, electrical and sewer connections, concrete sidewalk, and related work.

The bid form provides a detailed schedule of unit price work, including items such as mobilization and demolition, erosion and sediment control, concrete pad and walkway, sewer lateral, storm drain pipe, water line, electrical work, aggregate base, asphalt paving, bathroom design and supply, bathroom installation, striping and parking stops, and rip rap. Bidders are required to provide unit costs and total costs for each item, and the total construction cost for the base bid.

View the file

Other files

File Type Posted
stearns bid advertisement.docx DOCX document
sign in sheet.pdf PDF
skimmer detail.jpg JPG image
noi STEARNS.docx DOCX document
S-10000-00001798 Ranking~2.pdf PDF
Stearns bis sheet addendum signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #2

BID FORM

SCHEDULE OF UNIT PRICE WORK FOR CONSTRUCTION OF STEARNS PARK

RESTROOMS REPLACEMENT FOR THE CITY OF OAKLAND

BASE BID

ITE

M

NO. ITEM NAME UNIT

ESTIMATED

QUANTITY UNIT COST TOTAL COST

Mobilization and demolition LS 1 $

Erosion and sediment control LS 1 $

Concrete pad and walkway w/ minor excavation SF 360 $

4" Sewer lateral, cleanout and connection LF

5 6" Corrugated PVC SD pipe

LF 75

5a Catch basin EA 1 $

2" PVC Water LF 100 $

7 Electrical

LF 200 $

3" minus aggregate base compacted

TON 765 $

Level 2, 1/2 inch dense, asphalt conc.

pavement TON 60 $

Geogrid SY 130

11 Bathroom design and supply EA 2 $

Bathroom installation incl permits, plumbing and appurtenance SF 135 $ lopry Cross-Out lopry Cross-Out lopry Cross-Out lopry Cross-Out

13 Striping and parking stops LS 1 $

1” minus aggregate base compacted TON 66

Rip rap LS 1 $

TOTAL

CONSTRUCTION

COST BASE BID $

*Abbreviations (Add other abbreviations as required for the project):

LS – Lump Sum CY – Cubic Yard EA – Each

LBS – Pounds LF – Lineal Feet IN – Inches

SY – Square Yard TONS – Tons

The undersigned also declares and agrees as follows:

1. That the only persons or parties interested in this bid are those named herein, that the bid is in all respects fair and without fraud, and that it is made without any connection or collusion with any person making another bid on this Contract.

2. That the bidder, and any subcontractor upon which the bidder is relying, have carefully examined and had an opportunity to comment on, the Contract Documents for the construction of the proposed improvements including a full set of the plans and specifications, including all addenda thereto; that bidder has personally inspected the contemplated construction area or areas; that bidder is satisfied as to the adequacy and completeness of the plans and specifications, the feasibility of the work described therein, quantities of materials, items of equipment and conditions of work involved, including the fact that the description of work and materials as included herein are approximate only;

and that this bid is made according to the provisions and under the terms of the Specifications which are hereto attached and hereby made a part of this bid.

3. All of the Specifications and Plans which are listed herein have been examined by the undersigned bidder and the terms and conditions thereof are hereby accepted.

4. It is understood that the Plans may be supplemented by additional Drawings and Specifications in explanation and elaboration of the Plans and it is agreed that such Supplemental Drawings, when not in conflict with those referred to in Paragraph 3 above, will have the same force and effect as if completed and attached hereto, and that when received, will be considered a part of the Contract Documents.

5. It is understood that all work will be performed under the price schedule outlined herein and that all services, materials, labor and equipment and all work necessary to complete the Project in accordance with the Plans and Specifications shall be furnished for the prices named in the bid. If there is a change in the scope of work or work which cannot be properly classified under the price schedule then bidder agrees to do this work as

"extra work". The undersigned bidder agrees to do any extra work and furnish materials,