addendum 2 stearns signed.pdf
PDF 644 KB Posted
- Solicitation number
- S-K01070-00001797
- Issued by
- Douglas County, Oregon
About this file
This document is an Addendum #2 to the bid form for the Construction of Stearns Park Restrooms Replacement project for the City of Oakland, Oregon. The project requires the furnishing of all labor, equipment, materials, and supervision for the installation of two new restrooms, including minor excavation and demolition, installation of subgrade, clearing and grading, installation of two 66.7 sf prefabricated Romtec bathrooms or equivalent, paving, water, storm drain, electrical and sewer connections, concrete sidewalk, and related work.
The bid form provides a detailed schedule of unit price work, including items such as mobilization and demolition, erosion and sediment control, concrete pad and walkway, sewer lateral, storm drain pipe, water line, electrical work, aggregate base, asphalt paving, bathroom design and supply, bathroom installation, striping and parking stops, and rip rap. Bidders are required to provide unit costs and total costs for each item, and the total construction cost for the base bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| stearns bid advertisement.docx | DOCX document | |
| sign in sheet.pdf | ||
| skimmer detail.jpg | JPG image | |
| noi STEARNS.docx | DOCX document | |
| S-10000-00001798 Ranking~2.pdf | ||
| Stearns bis sheet addendum signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #2
BID FORM
SCHEDULE OF UNIT PRICE WORK FOR CONSTRUCTION OF STEARNS PARK
RESTROOMS REPLACEMENT FOR THE CITY OF OAKLAND
BASE BID
ITE
M
NO. ITEM NAME UNIT
ESTIMATED
QUANTITY UNIT COST TOTAL COST
Mobilization and demolition LS 1 $
Erosion and sediment control LS 1 $
Concrete pad and walkway w/ minor excavation SF 360 $
4" Sewer lateral, cleanout and connection LF
5 6" Corrugated PVC SD pipe
LF 75
5a Catch basin EA 1 $
2" PVC Water LF 100 $
7 Electrical
LF 200 $
3" minus aggregate base compacted
TON 765 $
Level 2, 1/2 inch dense, asphalt conc.
pavement TON 60 $
Geogrid SY 130
11 Bathroom design and supply EA 2 $
Bathroom installation incl permits, plumbing and appurtenance SF 135 $ lopry Cross-Out lopry Cross-Out lopry Cross-Out lopry Cross-Out
13 Striping and parking stops LS 1 $
1” minus aggregate base compacted TON 66
Rip rap LS 1 $
TOTAL
CONSTRUCTION
COST BASE BID $
*Abbreviations (Add other abbreviations as required for the project):
LS – Lump Sum CY – Cubic Yard EA – Each
LBS – Pounds LF – Lineal Feet IN – Inches
SY – Square Yard TONS – Tons
The undersigned also declares and agrees as follows:
1. That the only persons or parties interested in this bid are those named herein, that the bid is in all respects fair and without fraud, and that it is made without any connection or collusion with any person making another bid on this Contract.
2. That the bidder, and any subcontractor upon which the bidder is relying, have carefully examined and had an opportunity to comment on, the Contract Documents for the construction of the proposed improvements including a full set of the plans and specifications, including all addenda thereto; that bidder has personally inspected the contemplated construction area or areas; that bidder is satisfied as to the adequacy and completeness of the plans and specifications, the feasibility of the work described therein, quantities of materials, items of equipment and conditions of work involved, including the fact that the description of work and materials as included herein are approximate only;
and that this bid is made according to the provisions and under the terms of the Specifications which are hereto attached and hereby made a part of this bid.
3. All of the Specifications and Plans which are listed herein have been examined by the undersigned bidder and the terms and conditions thereof are hereby accepted.
4. It is understood that the Plans may be supplemented by additional Drawings and Specifications in explanation and elaboration of the Plans and it is agreed that such Supplemental Drawings, when not in conflict with those referred to in Paragraph 3 above, will have the same force and effect as if completed and attached hereto, and that when received, will be considered a part of the Contract Documents.
5. It is understood that all work will be performed under the price schedule outlined herein and that all services, materials, labor and equipment and all work necessary to complete the Project in accordance with the Plans and Specifications shall be furnished for the prices named in the bid. If there is a change in the scope of work or work which cannot be properly classified under the price schedule then bidder agrees to do this work as
"extra work". The undersigned bidder agrees to do any extra work and furnish materials,
File details come from the government source that posted it. Updated .