Addendum 2_Riverbend Raw Water Intake (1).pdf
PDF 8 MB Posted
- Attached to
- Advertisement For Bid - Raw Water Intake Screens
- Solicitation number
- PE-33957-NONST-2025-000000007
- Issued by
- Cherokee County, Georgia
About this file
This document is an Addendum for the Riverbend Raw Water Intake project for the Cherokee County Water & Sewerage Authority in Georgia. The addendum revises the Instructions to Bidders and the Bid Form, as well as provides additional information and clarifications related to the passive intake screens, air compressor requirements, and other project details. The bid date is Thursday, October 10, 2024 at 2:00 PM local time, with bids to be submitted at the Cherokee County Water & Sewerage Authority office. The addendum also addresses questions received from potential bidders regarding screen approval, contract time extension, screen and pipe size, and air compressor specifications. No material restrictions such as BABA or AIS are mentioned. The bid form includes a lump sum work item, cash allowances, and unit price work items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3_Riverbend Raw Water Intake.pdf | ||
| Addendum 1_Riverbend Raw Water Intake (1).pdf | ||
| Advertisement for Bids.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2 Issue Date: October 1, 2024
Project: Owner:
Riverbend Raw Water Intake Cherokee County Water &
Sewerage Authority
Cherokee County, Georgia
Bid Date: Thursday, October 10, 2024
Bid Submittal Time: 2:00 P.M. local time
Bid Submittal Location:
Cherokee County Water &
Sewerage Authoriy
110 Railroad Street Phone – (770) 479-1813
Canton, Georgia 30114 Fax – (678) 493-2434
Receipt of this addendum, and all previous addenda, should be acknowledged as part of your bid document. Failure to acknowledge the receipt of the addenda may result in rejection of the bid.
DIVISION 0 – BIDDING AND CONTRACT REQUIREMENTS
REPLACE Section 00 20 00 Instructions to Bidders, Paragraph 5.07A Key
Personnel, DELETE the second sentence “The proposed Project
Manager and the proposed Project Superintendent shall have been involved...” and REPLACE with “At least one of the proposed
Project Manager or the proposed Project Superintendent shall have been involved in a similar role in the project involving work in an active waterway, and both shall have been involved in a similar role in at least one of the listed projects described in Paragraph 5.07A.”
REPLACE Section 00 44 00 Bid Form with attached revised Section 00 44 00.
Riverbend Raw Water Intake Addendum #2
October 1, 2024
DIVISIONS 1 – 46: CONTRACT DOCUMENTS
ADD Section 01 20 00 Measurement and Payment, Paragraph 1.03B, ADD “f. Item 3.6 Air compressor. 1) Replace existing air compressor with new air compressor if required by screen manufacturer to ensure proper operation and parging of screens per
Specification Section 46 21 56. Contractor shall provide and install new compressor in existing electrical building and provide all electrical and ancillary installation and components necessary for a complete and functional operation.
REPLACE Section 46 21 56, Passive Intake Screens, Paragraph 2.01A, REPLACE “3. Or approved equal” with “3. Elgin Screens 4. Or approved equal.”
REPLACE Section 46 21 56, Passive Intake Screens, Table 2.02A, REPLACE
“Existing Air Compressor Max Pressure 120 psi” with “Existing
Air Compressor Max Pressure 125 psi.”
ADD Section 46 21 56, Passive Intake Screens, Table 2.02A, ADD
“Existing Air Compressor Power Requirements 7.5HP/460V/3PH”
ADD Section 46 21 56, Passive Intake Screens, Table 2.02A, ADD
“Existing Air Compressor Make/Model: Champion Pneumatic
Model HPL7D-25 (Dual Compressors Mounted on Tank)
REPLACE Section 46 21 56, Passive Intake Screens, Paragraph 1.06 B5, DELETE “5. Manufacturer’s equipment warranty in accordance with Section 01 78 36” and REPLACE with “5. Manufacturer’s equipment warranty in accordance with Paragraph 1.09”
DELETE Section 46 21 56, Passive Intake Screens, Paragraph 1.09A, “Warranty shall be in accordance with Section 01 78 36.”
DELETE Section 46 21 56, Passive Intake Screens, Paragraph 1.06E, DELETE reference to Section 01 77 00.
DELETE Section 46 21 56, Passive Intake Screens, Paragraph 3.02B, DELETE reference to Section 46 05 00.
DRAWINGS
REPLACE Drawing CD-03 replace callout for “14.3” Ø S.S. INTAKE
SCREEN” with “S.S. INTAKE SCREEN.”
QUESTIONS/CLARIFICATIONS
Q1: I was wanting to see what I need to provide to get Elgin listed as an approved equal for the intake screens. Let me know if there is still time to get this approved
A1: See addendum 2.
Q2: Can the contract time be extended or can the notice to proceed be delayed so that the work can be performed beginning in June, 2025?
A2: Owner’s primary usage of pump station is between June-September each year, and prefers to have use of the pump station during these months, however Owner is willing to consider river levels and expected weather prior to awarding contract and finalizing NTP.
Q3: Drawing CD-03: Shows two intake screens, are we quoting two? If yes, is the capacity
4mgd each or combined?
A3: There are 2 screens. Refer to Specification Section 46 21 56 Table 2.02A for requirements.
Q4: Drawing CD-03 Shows (3) air lines running out but doesn’t indicate where the third goes. Are we supplying valves for this line as well or are we only supplying the valves for the lines to the screens?
A4: The “third” pipe in the middle is the air supply line from the compressor. The 2 outside lines feed the air burst air to the screens. No valves are specified to be supplied in this
Contract.
Q5: Where will this airburst system be located? It shows the valves at the end of the platform so that makes us think we are also charging a section of piping along with the receiver. This can influence sizing of the airburst system and compressor. We need to nail down a location for the air receiver.
A5: See attached Drawings “M6” and “C4” for reference indicating existing compressor/electrical building location and interior layout. “Compressor Room” is located in the eastern portion of the “electrical building.” The approximate length of pipe from the existing compressor to the existing air burst valves is 200 ft. All other details are included in Section 46 21 56 Table 2.02A.
Q6: Drawing CD-03 shows a 16” pipe running to each screen but then calls out a 14.3” diameter intake screen which is shown larger than the 16” diameter pipe. The screen is called out at 16” within the specification. As far as I can tell, a 16” diameter intake screen is the appropriate diameter. Please confirm that the 14.3” diameter on the drawings is an error.
A6: The 14.3” diameter on the drawings is an error and corrected in this addendum. Note final screen sizing to meet the performance requirements specified in Section 46 21 56 is the responsibility of the screen manufacturer.
Q7: The spec calls out existing air compressor max pressure of 120psi. Are they using the existing air compressor for the airburst or are we to supply a compressor as well?
A7: Refer to Section 46 21 56 Paragraphs 1.04C and D, as well as revised Section 01 20
00 per Addendum 2.
Q8: There are several spec sections called out within the intake screen spec that were not included within the document package. The following sections are missing:
Section 01 78 36
Section 01 77 00
Section 46 05 00
A8: Refer to Addendum 2.
Q9: Are there any material restrictions such as BABA, AIS, etc.
A9: No
ATTACHEMENTS TO ADDENDUM NO. 1
A. Drawing C-07 Exhibit
B. Drawing CD-03 Exhibit
C. Reference drawings M6 and C4 for existing air compressor room and site.
D. Revised Section 00 44 00 Bid Form
DATE
BYATTACHMENT NO.
CONTRACT
NUMBER
REFER TO CONTRACT
DRAWING NUMBER
SHEET OF
HAZEN JOB
NUMBER
aalvarez Text Box
CHEROKEE COUNTY WATER
AND SEWERAGE AUTHORITY
aalvarez Text Box
RIVERBEND RAW WATER INTAKE MODIFICATIONS
(MAINTENANCE CONTRACT)
aalvarez
HAZEN JOB NUMBER
32462-003 aalvarez
CONTRACT NUMBER
CCWSA_2021_003_Hazen-Task-001 shakonson Text Box
ADDENDUM NO.
RCJones Snapshot
DATE
BYATTACHMENT NO.
CONTRACT
NUMBER
REFER TO CONTRACT
DRAWING NUMBER
SHEET OF
HAZEN JOB
NUMBER
aalvarez Text Box
CHEROKEE COUNTY WATER
AND SEWERAGE AUTHORITY
aalvarez Text Box
RIVERBEND RAW WATER INTAKE MODIFICATIONS
(MAINTENANCE CONTRACT)
aalvarez
HAZEN JOB NUMBER
32462-003 aalvarez
CONTRACT NUMBER
CCWSA_2021_003_Hazen-Task-001 shakonson Text Box
ADDENDUM NO.
RCJones Snapshot
Riverbend Raw Water Intake Design Modifications 00 40 00 - 1
October 2024 [ADD NO. 2] ISSUED FOR BID
SECTION 00 40 00
BID FORM
TABLE OF ARTICLES
1. Bid Recipient
2. Bidder’s Acknowledgements
3. Bidder’s Representations
4. Bidder’s Certifications
5. Basis of Bid
6. Certified List of Subcontractors
7. Certification of Equipment/Materials Manufacturers
8. Time of Completion
9. List of Required Attachments to this Bid
10. Defined Terms
11. Bid Submittal
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
Cherokee County Water & Sewerage Authority
Attention: Corey Ghorley
110 Railroad Street
Canton, Georgia 30114
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with Owner in the form included in the Bidding Documents to perform all
Work as specified or indicated in the Bidding Documents for the price(s) and within the times indicated in this Bid and in accordance with the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Advertisement for Bids and
Instructions to Bidders, including without limitation those dealing with the disposition of
Riverbend Raw Water Intake Design Modifications 00 40 00 - 2
Bid security. This Bid will remain subject to acceptance for ninety (90) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner. Bidder will sign the Agreement and will furnish the required contract security, and other required documents within the time periods set forth in the Bidding
Documents.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, if any, and the following Addenda, receipt of all of which is hereby acknowledged.
Addendum
No.
Date
Received
Addendum
No.
Date
Received
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work, and bidder has not relied upon any oral representations by employees or agents of Owner or Engineer.
C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.
D. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site (except Underground
Facilities), if any, that have been identified in have been identified in the Supplementary
Conditions as provided in paragraph 4.02 of the General Conditions as containing reliable
“technical data”. Bidder acknowledges that such reports and Drawings are not Contract
Documents and may not be complete for Bidder’s purposes. Bidder acknowledges that
Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to
Underground Facilities at or contiguous to the Site.
E. Bidder has considered the information known to Bidder, information commonly known to contractors doing business in the locality of the Site, information and observations obtained from visits to the Site, the Bidding Documents, and the Site-related reports and
Riverbend Raw Water Intake Design Modifications 00 40 00 - 3 drawings identified in the Bidding Documents with respect to the effect of such information, observations, and documents on:
1. The cost, progress and performance or furnishing of the Work.
2. The means, methods, techniques, sequences and procedures of construction to be employed by Bidder, including applying any specific means, methods, tech-niques, sequences, and procedures of construction expressly required by the
Bidding Documents to be employed by Bidder.
3. Bidder’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 3.01.E, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times required and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work (if any) to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
I. Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
ARTICLE 4 – BIDDER’S CERTIFICATIONS
4.01 Bidder certifies that:
A. This Bid is genuine and is not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive or coercive practices in competing for the Contract. For the purposes of the Paragraph 4.01.D.
1. “Corrupt practice” means the offering, giving, or soliciting of anything of value likely to influence the action of a public official in the bidding process
Riverbend Raw Water Intake Design Modifications 00 40 00 - 4
2. ”Fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.
3. “Collusive practice” means to scheme or arrangement between two or more
Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.
4. “Coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the amount as listed below. Total bid amount(s) shall be shown in words and numbers. In case of discrepancy, the bid amount shown in words will govern.
A. ITEM 1, LUMP SUM WORK – Furnishing all products, materials and equipment and performing all labor necessary to complete and put into operation the Riverbend Raw
Water Intake Modifications Project, including all Work shown on the Drawings and/or specified, excluding CASH ALLOWANCES (ITEM 2), and UNIT PRICE WORK
(ADDITIONAL WORK IF ORDERED BY ENGINEER) (ITEM 3), in the amount of:
__________________________________________________________DOLLARS
(Numerals)
Riverbend Raw Water Intake Design Modifications 00 40 00 - 5
B. ITEM 2, CASH ALLOWANCES
Item No. Description Allowance
2.1 Owner Directed Work Items $200,000.00
TOTAL CASH ALLOWANCES $200,000.00
C. ITEM 3, UNIT PRICE WORK (ADDITIONAL WORK IF ORDERED BY THE ENGINEER)
Item Approx.
Quantity Units Unit Price Extended Price
3.1 – Additional Mill and Resurface 100 SY $ $
3.2 – Additional Asphalt, Full Depth 100 SY $ $
3.3 – Additional Rip Rap 500 TON $ $
3.4 – Additional SEL’s 100 SY $ $
3.5 – Rock Excavation
Hammering
100 CY $ $
3.6 – Air Compressor [ADD NO. 2] 1 EA $ $
TOTAL EXTENDED UNIT PRICE $
TOTAL BASE BID PRICE (INCLUSIVE OF ITEMS 1 – 3): _____________________________
ARTICLE 6 – SUBCONTRACTOR SCHEDULE
Identify the Subcontractors to be used in the performance of work to be done on said
Project for the following trades. If the Bidder is licensed in and intends to self-perform a given trade, the Bidder’s name should be listed in the space for Subcontractor for that trade. Changes to this list after the Bid opening shall only be as approved by the Owner upon request by the Contractor or as required by the Owner based on upon review of
Subcontractor’s qualifications.
AREA OF SPECIALIZATION SUBCONTRACTORS
Coffer Dam/River Isolation
Riverbend Raw Water Intake Design Modifications 00 40 00 - 6
It is understood and agreed that, if awarded a Contract, the Contractor will not make any additions, deletions or substitutions to this certified list without the consent of the Owner.
ARTICLE 7 – MAJOR EQUIPMENT MANUFACTURERS/SUPPLIERS
7.01 Major Equipment Schedule: The Bidder agrees to furnish and install, in accordance with the Contract Documents, all items of equipment listed in the Major Equipment Schedule as part of the Lump Sum price stated by the Bidder. All items on the Major Equipment
Schedule shall be bid according to the following:
A. The Major Equipment Schedule designates major equipment items to be provided. The
Bidder shall indicate which of the specified Manufacturer’s/Supplier’s Equipment it is offering to provide by circling one of the Named Manufacturers/Suppliers listed. A Named
Manufacturer/Supplier for each identified major equipment item shall be circled, even if only one is specified. If the Bidder desires to propose a substitute for any Named
Manufacturer/Supplier of a specified item, it shall circle the Named Manufacturer/Supplier it is offering to provide and also shall write in the space provided the name of the offered
Substitute Manufacturer/Supplier, unless the words “No Substitutes” is listed in which case only the Named Manufacturer/Supplier shall be circled. Should a Substitute
Manufacturer/Supplier be determined “not equal” in the Engineer’s discretion, the Bidder must provide the Named Manufacturer/Supplier circled.
B. If none of the Manufacturers/Suppliers are circled for any of the product(s) listed below, the Owner reserves the right either to determine the Bidder non-responsive and reject the
Bid or to designate the Manufacturer/Supplier of the product(s) to be provided. No increase in the Contract Price will be allowed should the Owner elect to designate the
Manufacturer/Supplier of these product(s).
C. Design of this project is based upon the named equipment/suppliers as listed in the
Owner-Selected Equipment/Supplier Schedule. Should a Bidder propose an equipment/supplier alternate, he shall include in his Bid any and all additional construction costs associated with the alternate and reimbursement to the Owner for any incurred engineering redesign costs associated with the alternate. The Bid shall also include any paid-up licenses necessary for the use of the equipment if required by the manufacturer.
D. Should a proposed and circled write-in alternate be determined "not equal" by the
Owner, or should no proposed alternate be indicated, then the Bidder must provide one of the named manufacturer/supplier listed in the Major Equipment Schedule.
Major Equipment Schedule:
Riverbend Raw Water Intake Design Modifications 00 40 00 - 7
Section
Number Equipment Name/Description
Manufacturer/Supplier
(circle ONE for each equipment item)
46 21 56 Intake Screens
A. Johnson Screens (Aqseptence
Group)
B. Hendrick Screen Company
C. Elgin Separation Solutions
[ADD NO. 2]
D. Equal
NOTE: BIDDER MUST CIRCLE A BASE BID MANUFACTURER FOR EACH EQUIPMENT
ITEM.
ARTICLE 8 – TIME OF COMPLETION
8.01 Bidder agrees that the Work will be substantially complete and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
8.02 Bidder accepts the provisions of the Agreement as to liquidated and special damages in the event of failure to complete the Work within the Contract Time(s) specified in the
Agreement.
ARTICLE 9 – ATTACHMENTS TO THIS BID
9.01 The following documents are attached to and made a condition of this Bid:
A. Bid Bond. The required bid security in the form of bid bond, certified check, cashier's check or cash must be included and attached to the Bid Bond form. Bidders who submit
Bid Security in the form of a certified check, cashier's check or cash are bound by the
"Terms of Bid Bond."
B. Statement of Bidder’s Qualifications
C. Statement of Bidder’s Qualifications
D. Corporate Certificate
E. Contractor License Certification
F. Security and Immigration Act Compliance Certification
G. Non-Collusion Affidavit of Bidder
Riverbend Raw Water Intake Design Modifications 00 40 00 - 8
H. Subcontractor Affidavit(s) and Sub Subcontractor Affidavit(s) (these forms may be submitted by the successful Bidder after Notice of Award is issued, but shall be provided prior to Sub-Contractor or Sub-Sub-Contractor performing any Work on the Project and made part of this Bid by reference).
I. Security and Immigration Act Compliance Certification of all Sub-Contractors and all Sub-
Sub-Contractors (these forms may be submitted by the successful Bidder after Notice of
Award is issued, but shall be provided prior to Sub-Contractor or Sub-Sub-Contractor performing any Work on the Project and made part of this Bid by reference).
ARTICLE 10 – DEFINED TERMS
10.01 The terms used in this Bid with initial capital letters have the meanings stated in the
Instructions to Bidders and the General Conditions and Supplementary Conditions.
Riverbend Raw Water Intake Design Modifications 00 40 00 - 9
ARTICLE 11 – BID SUBMITTAL
11.01 This Bid submitted on _____________, 20___ by:
If Bidder is (pick one):
AN INDIVIDUAL
Name:
(Typed or Printed)
By:
(Individual’s Signature)
Doing business as:
License or Registration Number:
Business Address:
Phone No.:
Fax No.:
E-mail:
A PARTNERSHIP
Partnership Name:
(Signature of General Partner - Attach evidence of authority to sign)
License or Registration
Riverbend Raw Water Intake Design Modifications 00 40 00 - 10
CORPORATION
Corporation Name:
(State of Incorporation)
(Signature − Attach evidence of authority to sign)
Name and Title:
Attest
(CORPORATE SEAL)
License or Registration
(Secretary)
Riverbend Raw Water Intake Design Modifications 00 40 00 - 11
LIMITED LIABILITY COMPANY
(Firm Name)
(State of Formation)
(Signature of Member / Authorized to Sign)
(Printed or Typed Name and Title of Authorized to Sign)
(Attach evidence of authority to sign.)
License or Registration Number:
A JOINT VENTURE
Name of Joint Venture:
First Joint Venturer
(Signature of First Joint Venturer − Attach evidence of authority to sign)
Name (Typed or Printed):
Title:
Second Joint Venturer
(Signature of First Joint Venturer − Attach evidence of authority to sign)
Name (Typed or Printed):
Title:
Riverbend Raw Water Intake Design Modifications 00 40 00 - 12
(Each joint venturer must sign. The manner of signing for each individual, partnership, corporation or limited liability company that is a party to the joint venture shall be in the manner indicated above).
Phone and fax numbers and address for receipt of communications to joint venture.
END OF BID FORM
| Riverbend Raw Water Intake Addendum 2 Draft |
| Attachment A - DWG C-07 |
| Attachment B - DWG CD-03 |
| Attachment C - C4 & M6 |
| C4 |
| M6 |
Attachment D - 00 40 00 - Bid Form
| ADDENDUM NO: 2 |
| DATE: 2024.1001 |
| REFER TO CONTRACT DRAWING NUMBER: C-07 |
| ATTACHMENT NO: A |
| BY: CJS |
| Sheet #: 1 |
| ##: 1 |
| ADDENDUM NO: 2 |
| DATE: 2024.1001 |
| REFER TO CONTRACT DRAWING NUMBER: CD-03 |
| ATTACHMENT NO: B |
| BY: CJS |
| Sheet #: 1 |
| ##: 1 |