Addendum 2 Q&A .pdf

PDF 136 KB Posted

Attached to
Beaver Habitat Management Guidance
Solicitation number
S-63500-00012140
Issued by
Marion County, Oregon

About this file

This is Addendum #2 to RFP #S-63500-0012140 from the Oregon Department of Fish and Wildlife (ODFW) for Beaver Habitat Management Guidance. The document contains questions and answers from a pre-bid conference held on January 7, 2025, covering topics such as technical review processes, document formatting requirements, and project timeline details. The review process will include approximately two weeks for committee review and two weeks to incorporate feedback between May and June. The final deliverable should be a 20-30 page scientific paper-level document with appropriate graphics and illustrations that balance accessibility between experienced and new learners. Appendices and bibliography can be additional to this page count.

The budget range for this project is $50,000-$60,000, and it will be executed as a personal services contract. Technical review will be conducted primarily in-house by ODFW with external Subject Matter Experts (SMEs) representing various fields of expertise. While multiple contract awards are not permitted, subcontracting is allowed. The final product will be delivered as an electronic document, with the possibility of future hard copy printing. Writing samples can be submitted as either accessible links or attachments, and staff resumes are acceptable as part of the offer contents.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #2

RFP #S-63500-0012140

BEAVER HABITAT MANAGEMENT GUIDANCE

DATE: January 13, 2025

QUESTIONS AND ANSWERS:

Following are questions asked during the pre-bid conference held on 01/07/25 as well as received by Proposers and ODFW’s answers. The answers and clarifications provided below by ODFW are for informational purposes ONLY and DO NOT constitute a change to the terms, conditions, technical specifications or requirements of the RFP.

Question 1: Are there in house SME are they Beaver Biologist or Subject Matter Experts (SME) for other fields?

Answer 1: Technical review is primarily in-house for ODFW; SME will be external and representing a range of expertise. A list will be provided to Contractor of SMEs that ODFW has identified .

Question 2: In between May and June, how long will the document be reviewed by review committee?

Answer 2: Hoping to have a turn around time of two weeks for committee review and two weeks to incorporate feedback.

Question 3: Would you speak a little more on graphics and layout, how much effort would you like put into that?

Answer 3: Not expecting high level graphics, more focus on the scientific paper level, informative, do graphics support text., This needs to balance accessibility between experienced and new learners.

Question 4: Is technical review committee formed currently, or will that be formed for this?

Answer 4: A new committee will be formed

Question 5: With the list of SME’s provided, can we propose more?

Answer 5: Yes

ADDENDUM #1 – RFP #S-63500-00012140 2

Question 6: What is budget range?

Answer 6: $50-$60k

Question 7: Attachment B spot for notary, does that need to be notarized at time of bid submittal?

Answer 7: Yes, everything needs completed on all forms prior to bid submittal.

Question 8: Do you have a style guide for documents?

Answer 8: We do not have a required style guide. Here are some example documents of the level of information we are looking for with flexibility on the amount of graphics and photos included.

https://www.calapooia.org/wp-content/uploads/2019/05/KBO_and_LRP_2014_Landowner_oak_guide_1.0.pdf https://xerces.org/publications/guidelines/pollinator-friendly-parks https://cascadiaprairieoak.org/documents/wetland-prairie-guide

Question 9: would you be open to a collaborate proposal? Multiple awards and separate out scope or subcontract?

Answer 9: There is no clause for awarding to multiple Contractors in the RFP, however we are not restricting Contractors from sub-contracting out some of the work. Please refer to Attachment A Sample Contract subcontractor language.

Question 10: Has the internal technical advisory team been selected already? I am assuming since it is "internal" that means it is all ODFW staff? Is it possible to share this list now?

Answer 10: The team has not been selected yet. We may include some staff from other agencies or organizations if additional perspective is needed for a well-rounded review.

Question 11: The RFP says that ODFW will provide a list of "subject matter experts" and current studies. Is the contractor able to add to this list and select from it? Or does it define the exact, and sole resources to be consulted? Is it possible to share these lists now?

Answer 11: We will provide a list of SMEs that are willing to assist in this process. I need to check with participants, so that list is not currently available. Contractors can suggest other resources. The list of current studies will be a resource to assist the selected contractor. We expect that it will be added to as appropriate.

https://www.calapooia.org/wp-content/uploads/2019/05/KBO_and_LRP_2014_Landowner_oak_guide_1.0.pdf https://www.calapooia.org/wp-content/uploads/2019/05/KBO_and_LRP_2014_Landowner_oak_guide_1.0.pdf https://xerces.org/publications/guidelines/pollinator-friendly-parks https://cascadiaprairieoak.org/documents/wetland-prairie-guide

Question 12: Based on the fact that "subject matter experts" are to be consulted, it appears to be the case that the contracted product will not be required to be solely a review of published literature, and can incorporate a substantial amount of unpublished observations and natural history experience of the experts: Is this correct? Or is a pure "literature review" more to be expected?

Answer 12: We would like the product to be supported by published literature and it may include newer information and perspectives from experts that have not published their work but have significant expertise with this topic. I would not characterize it as using a substantial amount of unpublished observations as the primary references.

Question 13: In the 20-30 page product: It is assumed that literature cited/bibliography is not included within this total. However, would illustrations, diagrams and figures be acceptable as an additional appendix to these 20-30 pages, rather than included in the total?

Answer 13: The 20-30 pages is for the main body of the document and it’s a guide for the approximate length rather than a hard number. It’s a balance between providing enough information and keeping the documents accessible and easy to read through. Appendices can be additional.

Question 14: In terms of institutional processing, there was a question regarding if this contract was being viewed as a "personal services" or "purchase order" for a final product? I see "services" referenced multiple times in the RFP but needed to double check.

Answer 14: This will be a personal services contract.

Question 15: Attachment H. Are we just required to sign the form, or are we supposed to put our responses to the evaluation criteria into the form? If so, are we required to use the lines provided, or are we allowed to insert tables, etc.?

Answer 15: Put responses to the questions on the form and sign it. If unable to fill out the form in current format, please ensure the answers to questions align with the formatting as much as possible. If you need more space to answer questions, you may include attachments, please label what the attachment is for clearly.

Question 16: Please clarify if the requirement is for a Bibliography list of references, or a copy of the all the reference documents or other source formats that were cited?

Answer 16: See attachment D

Question 17: Will ODFW provide the documents on the resource list? Or will the Contractor be expected to procure the resource list, which may require expenses for purchasing items on the resource list?

Answer 17: Refer to addendum 1 Q&A.

ADDENDUM #1 – RFP #S-63500-00012140 4

Question 17a: Will ODFW participate in the subject matter expert interviews?

Answer 17a: We were not planning on participating but would like to see the notes.

Question 18: Please clarify publication format and expectations. Are hard copies expected from publication? If so, how many copies? Will ODFW publish the hard copies in their entirety?

Answer 18: The product is an electronic document. We may choose to print some copies in the future, but that will not be the main method of distribution.

Question 19: Please clarify the requirement for “accessible links”. Is the requirement to only provide writing samples as links? Can the writing samples be provided as attachments to the proposal or a format other than links?

Answer 19: We need links that can be opened and viewed (so not a reference to a publication that has restricted access). An attachment is acceptable.

Question 20: Is there a page limit on the Offer Contents or proposal?

Answer 20: Refer to addendum 1 Q&A on OB

Question 20a: Are staff resumes an acceptable part of the Offer Contents?

Answer 20a: Staff resumes are acceptable.