Addendum 2 - ORF Cellphone Lot.pdf
PDF 1 MB Posted
- Attached to
- ORF Cellphone Waiting Lot
- Solicitation number
- 54279
- Issued by
- Norfolk City, Virginia
About this file
This document is an Addendum to the original bidding documents for the Cellphone Waiting Lot project at the Norfolk International Airport, issued by the Norfolk Airport Authority. The addendum provides updates to the Bid Form, Construction Plans, and Project Highlights, including an extension of the Substantial Completion date from 90 to 120 days and the Final Completion date from 14 to 60 days. The project involves the construction of a new cellphone lot parking lot, with associated utility improvements, and requires the contractor to develop Maintenance of Traffic and site safety/security plans for approval by the Authority. The bidding deadline is January 30, 2024, at 2:00 pm, and inquiries should be directed to Delaney Davis at Kimley-Horn and Associates.
The addendum also includes details on the project's liquidated damages, signage allowance, and funding source contract requirements. Specifically, the contractor will be required to pay the owner $500 per calendar day for delays in substantial and final completion. There are no specified participation requirements for SWAM, DBE, or other minority participation, nor are there any certified payroll requirements beyond standard state and federal requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norfolk Airport Authority Addendum No.2 Cellphone Waiting Lot
ADD 2-1
Addendum No. 2 Cellphone Waiting Lot
Norfolk International Airport
January 17, 2024
From: Dave France, PE Kimley-Horn and Associates, Inc.
4525 Main Street, Suite 1000 Virginia Beach, VA 23462 757-213-8600 Office
To: Bid Document Holders
BID DOCUMENT HOLDERS on the project are hereby notified that this document shall append, take precedence over and become part of the original bidding documents dated December 13, 2023. Bids submitted for the project shall conform to this Addendum. All bidders are required to acknowledge Addendum No. 2 in their proposal. Failure to acknowledge addendum on the bid form will result in bid being declared non-responsive.
CONTRACT DOCUMENTS
BID FORM
Pages B-1 and B-4
1. REMOVE Sheets B-1 and B-4.
2. ADD Sheets B-1 through B-6. See attached Instructions to Bidders for modification.
CONSTRUCTION PLANS
ELECTRICAL PLAN SHEETS
Sheet E201 Overall Lighting Plan
1. ADD Sheet “E201 – Overall Lighting Plan” Attached.
CLARIFICATIONS
1. Prebid Presentation Revised to Reflect Updated Completion Date
a. MODIFY Time for Completion on slide 4 “PROJECT HIGHTLIGHTS” to be “120 days for substantially completed; 60 days for final completion”.
QUESTIONS
1. Plans say to discuss with owner to determine if irrigation pricing is needed. Does pricing for irrigation need to be included?
It should be assumed that the contractor will utilize PVC sleeves to account for irrigation. The awarded Contractor will need to coordinate the remainder of irrigation efforts with the airport’s
ADD 2-2
irrigation contractor. See sheet “CP100 – Landscape Plan” in the Construction Plans for PVC sleeve locations. For pricing, use two 4” Schedule 40 PVC.
2. Would the owner consider extending the days to complete to 180 days?
The substantial completion date has been extended from 90 to 120 days, at which point the lot will be open for use. The final completion date has been extended from 14 to 60 days.
3. Aside from the photometric map and some details on the lights being installed, no information was found on how or where the power is coming from. Please provide information on running power for the lights along with conduit route information.
Sheet “E201 – Overall Lighting Plan” has been included to provide information on running power along with conduit route information.
ADD 2-3
This page intentionally left blank
NORFOLK AIRPORT AUTHORITY B-1 BID FORM
CELLPHONE WAITING LOT ADDENDUM 2
BID FORM
Bids to be opened: Time 2:00 p.m. local time January 30, 2024
Work to be Completed in: Substantial Completion: 120 Calendar Days Final Completion: 60 Calendar Days
Liquidated Damages: Five Hundred Dollars and No Cents ($500.00) per calendar day after time for Substantial Completion has expired. Five Hundred Dollars and No Cents ($500.00) per calendar day after time for Final Completion has expired.
Performance Bond: 100% Payment Bond: 100% Bid Security: 5%
Contractor and Owner (Norfolk Airport Authority) recognize that time is of the essence of this agreement and that the owner will suffer financial loss if the work is not completed within the times specified, plus any extensions thereof allowed in accordance with the contract documents. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by the Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, owner and contractor agree that as liquidated damages for delay (but not as penalty), contractor shall pay owner Five Hundred Dollars and No Cents ($500.00) for each calendar day that expires after the time specified for substantial completion until the work is substantially complete. After substantial completion, if contractor shall neglect, refuse, or fail to complete the remaining work within the contract time or any proper extension thereof granted by owner, contractor shall pay owner Five Hundred Dollars and No Cents ($500.00) for each calendar day that expires after the time specified for final completion and readiness for final payment until the work is completed and ready for final payment. If substantial completion is not achieved by the time of final completion, then liquidated damages for both substantial and final completion shall run concurrently until substantial completion is achieved.
To Owner: Norfolk Airport Authority 2200 Norview Ave., Norfolk VA 23518-5807
A. BID PRICE
PROJECT: Cellphone Waiting Lot OWNER: Norfolk Airport Authority
The Work is comprised of the completed construction required by the Contract Documents performed to the complete satisfaction of the Owner, and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.
NORFOLK AIRPORT AUTHORITY B-2 BID FORM
CELLPHONE WAITING LOT ADDENDUM 2
Page Intentionally Left Blank
BID FORM
Item No. Description Estimated Quantity Unit Unit Price in Numbers Total Amount Per Item
Cellphone Waiting Lot
Cellphone Waiting Lot Construction 1 LS $ ______________ $ _________________
TOTAL AMOUNT OF BID SCHEDULE - CELLPHONE WAITING LOT
Dollars
Cents
Name of Bidder (Typed or Printed):
Signature of Bidder (Same as Proposal Form):
Title:
END OF BID SCHEDULE
Total BID SCHEDULE - CELLPHONE WAITING LOT Amount $
NORFOLK AIRPORT AUTHORITY
CELLPHONE WAITING LOT B-3.1
BID FORM
ADDENDUM 2
NORFOLK AIRPORT AUTHORITY B-4 BID FORM
CELLPHONE WAITING LOT ADDENDUM 2
B. ADDENDA
The undersigned acknowledges receipt of the following addenda:
Addendum No. _________________ Dated: _______________
Addendum No. _________________ Dated: _______________
Addendum No. _________________ Dated: _______________
C. We agree to enter into an Agreement with OWNER within ten (10) days of the award of same to us for the price named in our Bid.
D. It is expressly agreed by us that OWNER shall have the right to reject any and all Bids and to waive any minor non-substantive errors in the Bid and accept the Bid in OWNERS interests.
E. In default of the performance on our part of the conditions of Bid, our failure to enter into an
Agreement with OWNER within the time above set, we herewith furnish a Bid Security in the amount of $ __________________________________________________________________ , which shall be absolutely forfeited to OWNER but otherwise the said Bid Security shall be returned.
F. We agree to begin Work at any time we may be notified by the Owner, and complete all of the Work embraced in the Agreement within 120 Calendar Days;
G. The undersigned has read all sections under "Instructions to Bidders."
H. By signing the attached, the bidder certifies that a copy of the Contract Documents are in the Bidder’s possession, and that all work called for in the Contract Documents will be done in accordance with these Contract Documents. The Bidder also certifies that they will perform at least 25%___ of the work by value, and must submit, as part of the bid, a list of any sub-contractor doing work, the extent of work that will be performed and the dollar value of the work.
NORFOLK AIRPORT AUTHORITY B-5 BID FORM
CELLPHONE WAITING LOT ADDENDUM 2
I. CONTRACTOR'S REGISTRATION AND SIGNATURE
Registered Virginia Contractor Class and No.____________________________
(NOTE: FAILURE TO INCLUDE CONTRACTOR’S REGISTRATION NUMBER IS GROUNDS FOR
REJECTION OF THE BID.)
Contractor________________________________
Signed___________________________________
Date_____________________________________
Title_____________________________________
NOTE: If Bidder is a corporation, write state of incorporation under signature.
MAILING ADDRESS AND TELEPHONE NUMBER OF BIDDER:
( ) [Telephone]
NORFOLK AIRPORT AUTHORITY B-6 BID FORM
CELLPHONE WAITING LOT ADDENDUM 2
This page intentionally left blank
A
A
A
A
A
A
H1-24; 2 #10, 1 #10 GND - 1"C;
RUN VIA PHOTOCEL. STUB
CONDUIT AND CONDUCTORS UP
AT EXTERIOR OF PARKING
GARAGE A AND LB INTO
GARAGE BESIDE A COLUMN.
ROUT UP COLUMN TO GROUNT
TIER CEILING AND ROUTE
CONDUIT AND CONDUCTORS
TIGHT STRUCTURE ABOVE.
P
DIRECTIONAL BORE
UNDER EXISTING ROAD.
MOUNT PHOTOCELL
ON EXTERIOR WALL.
E201
T T T
T
800A ATS
"HED" - ETR
75KVA XFMR
"LE1 - ETR
"H1" - ETR
"L1 - ETR
"HE1 - ETR
"H1A" - ETR
"L1A" - ETR
15KVA XFMR - ETR
"L1B" - ETR
"HE1 - ETR
"HD" - ETR225KVA XFMR - ETR
R
T O
F O R
N
P
GOR
U
OC N TS R
C I
T O
I
SE S RP
N
TN
C E
LL
P
H O
N E
W A
IT
IN
G L
O T
P R
E P
A R
E D
F O
R
N O
R
FO
LK
A
IR
P
O R
T A
U
TH
O R
IT
Y
GRAPHIC SCALE:
O V
E R
A
LL
L
IG
H
TI
N G
P
LA
N
E201
SITE PLAN - PHOTOMETRICS
SCALE: 1" = 30'-0"
ENLARGED - GARAGE A ELECTRICAL ROOM
SCALE: 1/8" = 1'-0"
1" = 30'-0" 30' 15' 0' 60'30' 90'
1/8" = 1'-0" 5'0'5' 10' 20'
E201
AutoCAD SHX Text
THIS DRAWING IS NOT FOR NOT FOR FOR PRICING OR CONSTRUCTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
KHA PROJECT
AutoCAD SHX Text
4525 MAIN STREET, SUITE 1000, VIRGINIA BEACH, VA 23462
AutoCAD SHX Text
PHONE: 757-213-8600 FAX: 757-213-8601
AutoCAD SHX Text
WWW.KIMLEY-HORN.COM
AutoCAD SHX Text
VIRGINIA
AutoCAD SHX Text
NORFOLK
AutoCAD SHX Text 116465006
AutoCAD SHX Text
JEB
AutoCAD SHX Text
KPM
AutoCAD SHX Text
RAM
CELLPHONE WAITING LOT
Ashley Sumner Dave France asumner@norfolkairport.com dave.france@kimley-horn.com
(757) 857-3351 (757) 355-6643
Delaney Davis delaney.davis@kimley-horn.com (757)217-2096
PROJECT LOCATION
• Site Address: 2200 Norview Avenue, Norfolk, VA 23518
• Northwest of Garage A
SITE LOCATION
1/17/2024 ORF Cellphone Waiting Lot KH Job Number: 116465006
PROJECT INFORMATION
• Site Area: 2.03 AC
• Number of Spaces: 84
• Existing Impervious: 0.04 AC
• Proposed Impervious: 0.92 AC
• Scope of Work:
• Removal of existing trees and shrubs within the Limits of Disturbance (LOD)
• Construction of new parking lot
• Associated utility improvements
• Contractor to develop a Maintenance of Traffic (MOT) and a site safety/security plan
• Both plans to be approved by the Norfolk Airport Authority (NAA)
• Work hours to be determined by NAA
• Because there will be heavy automobile traffic around the site area, there should be an emphasis on continual maintenance of operations at the Norfolk International Airport
• To minimize obstruction to maintenance of operations, construction activities involving existing roads (i.e. installation of drainage features South of the Toll Plaza) must be completed during night hours set by NAA
• Existing electric lines running through the site should not be disturbed
• All trees within the LOD must be cleared by Contractor before April 1st, 2024
• Time for completion: 120 days for substantially completed; 60 days for final completion
PROJECT HIGHLIGHTS
• Liquidated Damages
• Contractor to pay owner $500 per each calendar day after the
Substantial Completion date until work is substantially complete
• Contractor to pay owner $500 per each calendar day after the Final
Completion date until work is ready for final payment
• Funding source contract requirements:
• SWAM, DBE, and other minority participation is encouraged, however there are no specified participation requirements for this project
• There are no specific wage rate requirements on this project outside of standard state and federal requirements
• No certified payroll
• Signage allotment: Contractor shall provide an allowance of $30,000 for wayfinding, directional, and or informational signage in the lot and in other locations around the airport circulation roads
PROJECT HIGHLIGHTS
Files:
• Available on electronic procurement system eVA:
https://eva.virginia.gov Site Visits:
• Contact Ashley Sumner (asumner@norfolkairport.com) to request access to the site
PRE-BID ACCESS
• Bids Submittal Deadline: January 30th, 2024 at 2:00 pm
• Sealed documents must be received by the Administration Office desk at the Norfolk Airport (Departures Terminal, 2nd Floor)
• Bidding Questions Deadline: January 16th, 2024
• Inquires should be directed to Delaney Davis (Delaney.davis@kimley-horn.com)
SCHEDULE
File details come from the government source that posted it. Updated .