addendum #2 notice to bidders.pdf
PDF 138 KB Posted
- Solicitation number
- 2133272
- Issued by
- Oneida County, Brookhaven CDP, New York
About this file
This is an Addendum #2 Notice to Bidders issued by the Town of Bridgewater, New York for the Western Star Park Sidewalk, Clock, and Site Improvements project (Project #404-24-1105), funded by the Oneida County Main Street Program. The project encompasses sidewalk construction, clock installation, and site improvements at Western Star Park located at the intersection of New York State Route 8 and US Route 20. Scope of work includes securing permits, demolition and excavation, earthwork, concrete and brick flatwork, drainage systems, electrical work, planting, installation of a post clock with foundation, concrete seat walls, stamped and brick sidewalks, drainage regrading, and landscaping installation. Bid documents are available online through the Town of Bridgewater's digital portal at https://townbridgewater.digitaltowpath.org:10084/content, with master copies available at the Town office. A virtual pre-bid conference is scheduled for Wednesday, April 15th at 10:00 AM, with attendance encouraged but not mandatory. Sealed bids must be received by May 8th at 12:00 p.m., with public opening and reading at 1:00 p.m. the same day. The construction start date is anticipated for late spring/early summer 2026, with substantial completion preferred by Labor Day, September 7, 2026, and all work to be completed by year-end. Bidders must submit an estimated construction schedule as part of their response.
The project establishes a 30% Minority and Women Business Enterprise (MWBE) goal, split equally at 15% for New York State certified women-owned business enterprises (WBE) and 15% for minority-owned business enterprises (MBE). No Service-Disabled Veteran-Owned Business (SDVOB) or Disadvantaged Business Enterprise (DBE) goals are specified. No incumbent contractor information is provided. The Town encourages participation from minority and women-owned businesses, local small businesses, and verified veteran-owned businesses. Questions regarding the project will be accepted until the close of business on Wednesday, April 15th, with answers posted on the Town of Bridgewater website. All bids must be submitted on Town-provided bid forms, and late submissions will be refused. Contact information for inquiries is provided through Siela Zembsch at CLA SITE Landscape Architecture, Engineering, and Planning, P.C. (szembsch@clasite.com or 518-584-8661, ext. 12) or Town Clerk Rose Wheeldon (315-822-6808, ext. 8).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 11 16 Notice to Bidders.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Star Park
CLA Site Project # 404-24-1105
NOTICE TO BIDDERS 00 11 16 - 1
DOCUMENT 00 11 16 – NOTICE TO BIDDERS [ADDENDUM #1] [ADDENDUM #2]
TOWN OF BRIDGEWATER
404 State Route 8
Bridgewater, NY 13313
Telephone: (315) 822-6808
Rose Wheeldon, Town Clerk
NOTICE TO BIDDERS
The undersigned shall receive sealed bids for the provision of services as follows:
TOWN OF BRIDGEWATER – WESTERN STAR PARK SIDEWALK, CLOCK, AND
SITE IMPROVEMENTS
The project is being funded by the Oneida County Main Street Program. The project consists of work including providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of work shown on the plans and described in these specifications, including but not necessarily limited to the following: See
Summary of Work, Specification Section 01 11 00.
You may obtain the bid documents on-line through the Town of Bridgewater. To obtain bid documents, please go to https://townbridgewater.digitaltowpath.org:10084/content and choose
WESTERN STAR PARK IMPROVEMENTS on the website’s left panel. All further information pertaining to this bid will be available on this site. Bids which are not directly obtained from this source will be refused. Master copies will also be available in the Town office for reference.
Bids may be delivered in-person or by mail to the undersigned at the Town of Bridgewater, 404
State Route 8, Bridgewater, New York between the following hours: Mon., 9 am-12 pm and 4:30 pm-6:30 pm; Tu./Th., 9 am-1 pm; Wed./Sat., 9 am-12 pm. Bids will be received up until
Thursday [Friday], April 23rd [April 30th] [May 8th] at 12:00 p.m. They will be publicly opened and read on Thursday [Friday], April 23rd [April 30th] [May 8th] at 1:00 p.m. All bids must be submitted on bid forms provided. Any alterations to provided bid forms are subject to refusal.
Late bids by mail, courier or in person will be refused. The Town of Bridgewater will not accept any bid or proposal which is not delivered to the Town of Bridgewater by the time indicated.
The Town of Bridgewater encourages all minority and women-owned businesses, local small businesses and verified veteran-owned businesses to participate in the bidding process. A 30% minority/women business enterprise (MWBE) goal exists for the general construction contract, split 15% for New York State certified women-owned business enterprises
(WBE), and 15% for New York State certified minority-owned business enterprises
(MBE).
https://townbridgewater.digitaltowpath.org:10084/content
Western Star Park
CLA Site Project # 404-24-1105
NOTICE TO BIDDERS 00 11 16 - 2
A virtual pre-bid conference will be conducted for all those interested on Wednesday, April 15th at 10 AM. If interested, please reach out to Siela Zembsch of CLA SITE Landscape
Architecture, Engineering, and Planning, P.C. at szembsch@clasite.com before 9 AM on
Wednesday, April 15th. A Zoom link will be shared with all interested parties. Attendance at the pre-bid conference is encouraged, but not mandatory.
Please reach out to Siela Zembsch of CLA SITE Landscape Architecture, Engineering, and
Planning, P.C. (szembsch@clasite.com or (518) 584-8661, ext. 12) with any questions.
Questions will be accepted until close of business day on Wednesday, April 15th. Answers will be posted on the Town of Bridgewater website.
Project Timeline
1. The anticipated Construction Start Date: Late Spring/Early Summer 2026.
2. Substantial Completion Date: A completion date on or before Labor Day (September 7, 2026) is preferred. This project schedule is flexible – however, work shall be completed by the end of the year. Once work is started, we are anticipating closeout within 3 months (90 days). Bidders should provide an estimated construction schedule, which will be used to evaluate bid responses.
The right is reserved to reject any or all bids.
Rose Wheeldon, Town Clerk
Town of Bridgewater
Tel. (315) 822-6808, ext. 8
Fax (315) 899-2075
Email: tobtownclerk@gmail.com mailto:szembsch@clasite.com mailto:szembsch@clasite.com mailto:tobtownclerk@gmail.com
File details come from the government source that posted it. Updated .