Addendum 2 - Floor Covering Installation AH City Hall - RFP-CAH-11-12-2024-001.pdf

PDF 586 KB Posted

Attached to
Floor Covering Installation - Auburn Hills City Hall
Solicitation number
RFP-CAH-11-12-2024-001
Issued by
Macomb County, Ann Arbor City, Michigan

About this file

Addendum #2 is a document issued by the City of Auburn Hills for a Request for Proposal (RFP) for Floor Covering Installation at the City Hall, with the project identification number RFP-CAH-11-12-2024-001, dated November 22, 2024. The addendum provides clarifications and modifications to the original scope of work, specifically addressing installation requirements for floor coverings, including the mandatory use of rubber wall base in hallways, kitchen, and stairwell areas. The document specifies that work will be performed after-hours and on weekends, and explicitly states that the contractor will not be responsible for disassembling or moving office furniture.

The addendum introduces additional details regarding wall base trim installation, requesting contractors to provide an alternate price for potential removal and reinstallation of existing wall base trim to accommodate carpet installation. The finish schedule accompanying the document provides comprehensive details about flooring materials, including carpet tiles, luxury vinyl tile (LVT), and specific manufacturer and color specifications for various rooms such as the office, copy room, kitchen, hall, and stairwell. The document indicates that different flooring types and finishes will be used across different spaces, with specific requirements for wall coverings, paint finishes, and base materials.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP-CAH-11-12-2024-001

ADDENDUM #2

City of Auburn Hills

Request for Proposal (RFP) – Floor Covering Installation, AH City Hall

RFP-CAH-11-12-2024-001

November 22, 2024

The following changes, additions, and/or clarifications to the scope of work shall be incorporated into said documents:

• Trims and Bases o Rubber wall base will be required in hallway, kitchen, and stairwell. Please see updated finish schedule.

o Wall base trim should be high enough to install carpet underneath. Please provide an alternate price for the removal and reinstallation of wall base trim (if needed) that is to remain.

• Contractor will not be responsible for disassembling and moving office furniture.

• Work shall be performed after-hours and on weekends.

QUZRTZ

TILE 1

WC 1 - 42" A.F.F.

SEE HIGHLITED PRINT

WC 1 - SEE HIGHLITED PRINT

PT 1 - ALL OTHER WALLS

PT2 - TRIM DOORS

LVT 1

LVT 1

KITCHEN

OFFICE

COPY ROOM

LUXURY VINYL 9.59" X 59"

RUBBER WALL BASE

CPT 1

CPT 1

LVT 1

KITCHEN COUNTERTOPS

VERTICAL BRICK STACK

SEMI GLOSS FINISH FOR DOORS AND TRIM

SATIN FINISH FOR WALLS

STRAIGHTHANG, STRAIGHT ACROSS MATCH

NOTES/INSTALL

SVALBARD Q4047

REMINGTON WHITE

SW 7005 PURE WHITE

SW 6002 ESSENTIAL GRAY

WALLCOVERING INTO THE WOODS

T2-NW-01 SNOWY CEDARS

150 DARK GRAY

AGAINST THE GRAIN

2823 SPELT

LARGE & LOCAL WOOD C0128

948 SANDHILL

STYLE/COLOR

WILSONART

SHERWIN WILLIAMS

SHERWIN WILLIAMS

MOMENTUM

ROPPE

MOHAWK GROUP

MANUFACTURER

J&J FLOORING KINETEX

VITL

CPT 1

12 X 24 TILE

LATEX PAINT

LATEX PAINT

VINYL WALLCOVERING

TILE 1

QZ 1

MILLWORK AND TILE

PT 1

PT 2

PAINTS

WC 1

WALLCOVERINGS

CPT 1

LVT 1

RB 1

TRIMS AND BASES

FLOORING

FINISH CODE

FINISH SCHEDULE

STD BRICK

PARQUET

DESCRIPTION

QZ 1

MILLWORK

N/A

RB1

N/A

BASEFLOOR

CPT 1

LVT 1

LVT 1

CPT 1

PT 1

ROOM NAME

COPY ROOM

KITCHEN

BATH

ROOM FINISH SCHEDULE

OFFICE

WALLS

WC 1

CARPET TILE 12 X 48

PR

O

JE

C

T M

AN

AG

ER

AC

C

O U

N T

EX

EC

U

TI

VE

DR

AW

N B

Y

RE

VI

SI

O

N P

LO

T

DA

TE

S

ST

AR

T

DA

TE

PR

O

JE

C

T N

U M

BE

R

IN

VO

IC

E

SA

N

DR

A

ST

AC

EY

D

ES

IG

N L

.L .C

C

IT

Y O

F

AU

BU

RN

H

IL

LS

C

IT

Y

H

AL

L

CLIENT APPROVAL/DATE

SHEET NUMBER

FINISH PLAN

F1

/0

3/

S.

ST

AC

EY

S.

ST

AC

EY

S.

ST

AC

EY

IN

TE

RI

O

R

DE

SI

G

N

ER

PR

O

JE

C

T

OFFICE

CPT 1

OFFICE

CPT 1

OFFICE

CPT 1 OFFICE

CPT 1

CPT 1

RB 1LVT 1HALL PT 1

HALL

STAIRWELL

RB 1LVT 1PT 1STAIRWELL

File details come from the government source that posted it. Updated .