Addendum_2.pdf

PDF 71 KB Posted

Attached to
Specification No. 24-11 (C51672), Tisdale Weir Rehabilitation and Fish Passage Project, Sacramento River
Solicitation number
0000032601
Issued by
Tulare County, California

About this file

This document is an Addendum to the Invitation to Bid for the Tisdale Weir Rehabilitation and Fish Passage Project in Sacramento River, California. The project is being issued by the California Department of Water Resources and includes structurally rehabilitating the Tisdale Weir, establishing fish passage and related components, and completing site improvements such as utility pole relocation, equipment access, and bank scour protection. This Addendum revises Sections 00002-1 and 13000-{1,2} of the bid documents. Bids are due on October 16, 2024 and will be publicly opened at the California Natural Resources Headquarters in Sacramento. The estimated cost range for the project is $25,100,000 - $30,700,000, and the required contractor's license classification is A. Interested bidders can register as plan holders by emailing DOE_Specs@water.ca.gov to access the bid documents.

The contract pricing will be paid based on the "CONTROL BUILDING" item, which includes the shell structure, utilities, and earthwork. No further pricing details or set-aside information is provided in this addendum. Funding for the project is from the State of California, but the specific source is not disclosed.

View the file

Other files

File Type Posted
24-11_-_Bid_Schedule.pdf PDF
Addendum_1.pdf PDF
24-11_-_Drawings.pdf PDF
24-11__Information_Letter_No._2_.pdf PDF
General_Information_Letter.pdf PDF
24-11_-_Contract_Specification.pdf PDF
Safety_Prequalification_Questionnaire.pdf PDF
24-11_-_Notice_to_Contractors.pdf PDF
24-11_-_Notice_of_Inspection_Trip.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Addn. No. 2, Pg. 1)

ADDENDUM NO. 2

PROJECT TITLE: TISDALE WEIR REHABILITATION AND FISH

PASSAGE PROJECT

LOCATION: SACRAMENTO RIVER

SPECIFICATION NO.: 24-11

CONTRACT NO.: C51672

ISSUED BY: STATE OF CALIFORNIA

DEPARTMENT OF WATER RESOURCES

DATE ISSUED: SEPTEMBER 12, 2024

The following changes are hereby made by this addendum:

1. Revised sections with page numbers: 00002-1, 13000-{1,2}

BIDDER'S SIGNATURE

This addendum shall be signed below in the same manner as the bid is signed.

Bidder: ________________________________________________________

By (Authorized Officer): ___________________________________________

Business Address: _______________________________________________

Dated: ________________________, 20__.

THIS ADDENDUM COMPRISES 4 PAGES.

THIS COVER PAGE MUST BE SIGNED AND RETURNED WITH THE BID.

EXECUTION OF THIS ADDENDUM CONSTITUTES ACKNOWLEDGEMENT

OF THE PREVIOUS ADDENDUM.

Notice to Contractors

00002-1 C-21 (Addn. No. 2, Pg. 2)

DOCUMENT 00002

NOTICE TO CONTRACTORS

STATE OF CALIFORNIA

CALIFORNIA NATURAL RESOURCES AGENCY

DEPARTMENT OF WATER RESOURCES

Sealed bids for

TISDALE WEIR REHABILITATION AND FISH PASSAGE PROJECT

SACRAMENTO RIVER

STATE WATER FACILITIES

DIVISION OF FLOOD MANAGEMENT

SUTTER COUNTY

CALIFORNIA

SPECIFICATION NO. 24-11

CONTRACT NO. C51672

will be received by the Department of Water Resources at the California Natural Resources Headquarters, 715 P Street, Sacramento, California 95814, between 12:00 P.M. and not later than 2:00 P.M. on Wednesday, October 16, 2024. A public bid opening will be conducted live at an announced location in the vicinity of such office and via webinar.

NOTE: Bidders/Visitors shall allow sufficient time for checking in with

Security upon entering main floor of the California Natural Resources Headquarters. Bids will be accepted and timestamped in the main lobby of the California Natural Resources Headquarters.

Please refer to Document 00200 – Instructions to Bidders, for additional information.

Bid forms for this work are provided in a separate booklet titled BID FORM.

Building Contract Items

13000-1 C-21 (Addn. No. 2, Pg. 3)

SECTION 13000

BUILDING CONTRACT ITEMS

PART 1 GENERAL

1.01 DESCRIPTION

A. This section covers the contract item Control Building, which includes the control building’s shell structure, utilities, and earthwork, as defined below.

1. The shell structure includes:

a. Floor: Reinforced concrete foundation and slab.

b. Exterior and interior walls: Concrete masonry unit (CMU) and metal furring wall assemblies.

c. Roof covering system: Metal roof panels, panel attachments, underlayment, sealants, mastics, trims, flashings, gutters, downspouts and miscellaneous sheet metal work.

d. Roof structure: Engineered roof trusses, roof decking, trims, vent blocks, and soffit panels.

e. Ceiling and wall insulation and the support system.

f. Wall accessories: Louvers, vents, door and hardware.

g. Miscellaneous finish work: Fire extinguishers, key box, painting, sealing, and firestopping.

2. Utilities and earthwork for trenches extending the first 5 feet beyond the building footprint.

B. The work is described in the related sections listed below under Paragraph 1.02.

1.02 RELATED SECTIONS

A. General Conditions, Supplementary General Conditions, other Division 1 sections, and Drawings apply to this section. This section may require direct correlation with the following sections of the contract:

1. Section 03300 – Cast-in-Place Concrete.

2. Section 04200 – Reinforced Concrete Masonry.

Building Contract Items

13000-2 C-21 (Addn. No. 2, Pg. 4)

3. Section 06173 – Engineered Wood Trusses.

4. Section 06105 – Miscellaneous Carpentry.

5. Section 07210 – Fiberglass Building Insulation.

6. Section 07230 – Rigid Insulation.

7. Section 07610 – Metal Roofing.

8. Section 07620 – Sheet Metal Flashing and Trim.

9. Section 07920 – Joint Sealants.

10. Section 08100 – Metal Doors and Frames.

11. Section 08710 – Door Hardware.

12. Section 09250 – Gypsum Board Assemblies.

13. Section 09910 – Painting.

14. Section 10200 – Louvers.

15. Section 10520 – Fire Extinguishers.

16. Section 10521 – Fire Department Key Box.

1.03 DEFINITIONS

A. Building Footprint: Area on plan view delineated by the outer face of the exterior foundations.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

PART 4 PAYMENT

4.01 PAYMENT

A. The contract price will be paid for CONTROL BUILDING; which price shall include full compensation for all costs incurred under this section.

END OF SECTION

File details come from the government source that posted it. Updated .