24-11_-_Bid_Schedule.pdf
PDF 278 KB Posted
- Attached to
- Specification No. 24-11 (C51672), Tisdale Weir Rehabilitation and Fish Passage Project, Sacramento River
- Solicitation number
- 0000032601
- Issued by
- Tulare County, California
About this file
This document is a Bid Schedule for a contract opportunity issued by the California Department of Water Resources (DWR) for the Tisdale Weir Rehabilitation and Fish Passage project. The contract includes 120 items such as an engineer's field office, temporary traffic controls, dewatering, demolition, earthwork, concrete work, metalwork, electrical work, and installation of various equipment and systems. The estimated quantities for these items are provided, along with unit prices and total amounts. The contract appears to have a lump sum pricing structure. No information is provided about response dates, site visits, award dates, or contract term.
The document outlines the pricing terms and item details for the project, but does not include any information about set-asides, incumbents, funding requirements or sources, or other salient commercial details. The project appears to be a public works contract funded by the state of California, but the specific funding sources are not disclosed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
*Section where contract item is defined
00410-1 C-21
DOCUMENT 00410
BID SCHEDULE
CONTRACT TITLE: Tisdale Weir Rehabilitation and Fish Passage
DWR SPECIFICATION NO.: 24-11
DWR CONTRACT NO.: C51672
BIDDER’S NAME:
(Name style as recorded on CA Contractor’s License)
NOT TO BE USED FOR BIDDING PURPOSES
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures) Total
(In Figures)
1 01520 Engineer’s Field Office 20 MO
2 01560 Temporary Traffic Controls 1 JOB LUMP SUM
3 01910 Project Commissioning 1 JOB LUMP SUM
4 02070 Nonwoven Geotextile Fabric 30 SY
02205
Mobilization and Demobilization
1 JOB LUMP SUM
6 02207 Exclusion Fencing 2,600 LF
7 02207 Silt Fencing 1,050 LF
8 02214 Dewatering 1 JOB LUMP SUM
9 02220 Selective Demolition 1 JOB LUMP SUM
02231
Clearing and Grubbing – General
5 ACRE
11 02231 Tree Removal 6 EA
12 02231 Limbing 0.2 ACRE
13 02260 Temporary Sheet Piles 1 JOB LUMP SUM
14 02300 Excavation 24,000 CY
15 02300 Compacted Backfill 1,900 CY
16 02300 Sand Bedding 1,400 CY
17 02300 Drain Rock 3,520 CY
18 02340 Aggregate Piers 1 JOB LUMP SUM
00410-2 C-21
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures)
Total (In Figures)
19 02371 Nonwoven Geotextile Fabric 2,200 SY
20 02371 Rock Slope Protection 13,440 TON
21 02430 Grouting 1 JOB LUMP SUM
22 02455 Furnish Class 140 Piles 4,250 LF
23 02455 Drive Class 140 Piles 4,250 LF
24 02455 Furnish Class 200 Piles 450 LF
25 02455 Drive Class 200 Piles 450 LF
26 02491 Helical Piles 614 EA
27 02620 PVC Pipe, 2-Inch 175 LF
28 02620 PVC Pipe, 3-Inch 60 LF
29 02620 PVC Pipe, 6-Inch 50 LF
30 02620 Slotted PVC Pipe, 6-Inch 150 LF
31 02720 Aggregate Base 1,580 TON
32 02740 Hot Mix Asphalt (HMA) 210 TON
33 02810 High Security Fence 121 LF
34 02810 Slide Gate 1 EA
35 02810 Double Drive Gate 1 EA
36 02810 Personnel Gate 1 EA
37 02925 Seedbed Preparation 25 ACRE
38 02925 Seeding 25 ACRE
39 03100 Concrete Formwork 1 JOB LUMP SUM
40 03103 Weir Surface Treatment 24450 SF
41 03150 PVC Waterstop 2,340 LF
42 03150 PVC Retrofit Waterstop 1,150 LF
43 03151 Concrete Anchors 1 JOB LUMP SUM
44 03210 Reinforcing Steel 1,248,000 LB
00410-3 C-21
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures)
Total (In Figures)
45 03300 Slab Concrete 5,500 CY
46 03300 Gatehouse Slab Concrete 280 CY
47 03300 Gatehouse Wall Concrete 130 CY
03300
Connection Channel Slab Concrete
380 CY
03300
Connection Channel Wall Concrete
240 CY
50 03300 Retaining Wall Concrete 1,770 CY
51 03300 Test Slab Concrete 8 CY
52 03315 CLSM Backfill 57 CY
53 03931 Sawcut 33 LF
54 03931 Spall Repair 0.50 CY
03931
Reinforcing Bar Replacement
150 LB
56 03932 Crack Repair 1400 LF
57 03933 Contraction Joint Sealant 675 LF
58 05500 20’ Steel Pipe Gate 1 EA
59 05500 Miscellaneous Metalwork 2,800 LB
60 06600 Experimental Fish Baffles 1 JOB LUMP SUM
61 11285 Bottom Hinged Gate 1 JOB LUMP SUM
13315
Inclinometers and Water Surface Elevation Sensors
1 JOB LUMP SUM
63 13000 Control Building 1 JOB LUMP SUM
64 13450 PLC Panel CCA 1 EA
13450
Programmable Logic Controller (PLC)
1 EA
66 13450 Spare PLC, Tools, and Parts 1 SET LUMP SUM
67 13704 Camera Poles 1 EA
68 13710 Sonar Imaging System 1 JOB LUMP SUM
00410-4 C-21
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures)
Total (In Figures)
15210
General Service Compressed-Air Systems
1 JOB LUMP SUM
70 15450 Water Storage Tank 1 JOB LUMP SUM
15700
Ductless Split Air Conditioner- Electrical Room
72 15700 Ductless Split Air Conditioner- Storage Room
73 15830 Exhaust Fan 1 EA
74 16060 Grounding System 1 JOB LUMP SUM
75 16080 Electrical Testing 1 JOB LUMP SUM
76 16120 250KCMIL, 3 Conductor Power Cable, 600V
250 LF
77 16120 No. 8 AWG, 3 Conductor
200 LF
78 16120 No. 6 AWG, 3 Conductor
100 LF
79 16120 No. 2 AWG, 3 Conductor Power Cable, 600 V
80 16120 No. 12 AWG, 3 Conductor
81 16120 No. 12 AWG, 2 Conductor
800 LF
82 16120 No. 14 AWG, 12 Conductor Control Cable
83 16120 No. 16 AWG, 12 Conductor Control Cable
150 LF
84 16120 No. 16 AWG, 2 Conductor TSP Instrumentation Cable
500 LF
85 16120 No. 16 AWG, 3 Conductor TSP Instrumentation Cable
86 16123 Cable – Category 6 Patch Cords
630 LF
00410-5 C-21
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures)
Total (In Figures)
87 16123 Cable – Category 6 Bulk Cable
88 16123 Rack Mount Cable Management
89 16130 1 Inch Intermediate Metal Conduit
435 LF
90 16130 2 Inch Intermediate Metal
91 16130 2-1/2 Inch Intermediate Metal Conduit
40 LF
92 16130 1 Inch PVC Schedule 80
250 LF
93 16130 1-1/2 Inch PVC Schedule 80
94 16130 2 Inch PVC Schedule 80
1,100 LF
95 16130 2-1/2 Inch PVC Schedule 80
96 16130 3/4 Inch Liquid-tight Flexible Metal Conduit
97 16130 Duct Bank 1 JOB LUMP SUM
16130
Junction Box with Cover Plate
20 EA
16130
Conduit Body with Cover Plate
20 EA
16130
Pull Box 24” x 36” x 36” – Steel Cover H20 Rated
6 EA
101 16130 Warning Tape 400 LF
16135
Electronic Equipment Enclosure
103 16140 Generator Outlet 1 EA
104 16140 Welding Receptacle 1 EA
105 16140 Door Sensor Switches 3 EA
00410-6 C-21
Item No.
Section* Item Estimated Quantity
Unit Unit Price
(In Figures)
Total (In Figures)
106 16140 Wiring Devices 1 JOB LUMP SUM
107 16210 Electrical Utility Services 1 JOB LUMP SUM
108 16270 Dry Type Transformer 1 EA
109 16415 Manual Transfer Switch 1 EA
110 16415 Safety Disconnect Switches 6 EA
16441
Panelboard 3 Phase, 480/277 VAC (LA)
16441
Panelboard 3 Phase, 208/120 VAC (LB)
113 16500 Indoor and Outdoor Lighting 1 JOB LUMP SUM
114 16720 Lightning Surge Protector 1 EA
115 16720 KVM Switch 1 EA
116 16720 Power Distribution Unit 1 EA
16720
Uninterruptable Power Supply
16720
Install Department Furnished Equipment
7 EA
119 01305 Dispute Resolution Board On-Site Meetings
8 EA $6,000.00 $48,000.00
120 01305 Hourly Off-Site Dispute Resolution Board Related Tasks
20 HR $200.00 $4,000.00
TOTAL
END OF DOCUMENT
File details come from the government source that posted it. Updated .