About this file
This document is an Addendum to Invitation for Bid (IFB) #07A5822 for Plumbing Services in Los Angeles and Ventura Counties, issued by the California Department of Transportation (Caltrans). The addendum extends the bid submittal due date to September 19, 2024 and revises Attachment 1 - Bid Proposal. The IFB seeks to provide routine and non-routine plumbing services to Caltrans-owned properties within Los Angeles and Ventura Counties. The bid items include hourly rates for labor, tools, equipment, travel, and incidentals, as well as a maximum allowance for parts, materials, and supplies.
The bid proposal sheet specifies estimated quantities but notes that no guarantee is made as to the exact quantities needed. Bidders are not allowed to alter the bid proposal sheet, and all line items must be quoted. The total bid amount will be the sum of the line items. The maximum allowance for parts, materials, and supplies is set at 10% of the subtotal amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Plumbing_Solicitation_Package_07A5822.pdf | ||
| Addendum_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS-65
SACRAMENTO, CA 95816
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
September 10, 2024
Addendum No. 2 Invitation for Bid (IFB) #07A5822
Plumbing, Los Angeles and Ventura Counties
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 2 is being issued for the above-reference IFB. Bids for this work shall be with the full understanding of this Addendum.
The following changes have been made:
1. The bid submittal due date has been extended and is now September 19, 2024. Please refer to the revised IFB Timeline below:
2. IFB, Attachment 1 Bid Proposal has been revised – see attached. The revised version must be submitted with bid submittal or bid will be rejected.
All other terms and conditions set forth in the IFB remain in full force and effect.
Sincerely, Bonnie Rodriguez Contract Analyst
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Agreement Number 07A5822
BID PROPOSAL Attachment 1 - Revised ADM-1412 (REV. 01/2024) Page 1 of 1
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit of Measure Item Description
Unit Price (Price Per Unit of Measure)
Total (Estimated Quantity
X Unit Price)
1 3400 Hours
Hourly rate for all labor, tools, equipment, travel, and incidentals necessary to provide as-needed, non-routine plumbing services to Caltrans-owned properties, per Exhibit A, Scope of Work.
2 3400 Hours
Hourly rate for all labor, tools, equipment, travel, and incidentals necessary to provide as-needed, non-routine plumbing services to Caltrans-owned properties, per Exhibit A, Scope of Work, for each additional worker.
3 1100 Hours
Hourly rate for all labor, tools, equipment, travel, and incidentals necessary to provide as-needed, routine plumbing services to Caltrans-owned properties, per Exhibit A, Scope of Work.
4 1100 Hours
Hourly rate for all labor, tools, equipment, travel, and incidentals necessary to provide as-needed, routine plumbing services to Caltrans-owned properties, per Exhibit A, Scope of Work, for each additional worker.
Subtotal $
Maximum allowable expenditure for all parts, materials, and supplies, per Exhibit A, Scope of Work, Item 12. Actual costs will be reimbursed based on submitted original receipts, without allowances for markup. THIS AMOUNT SHALL BE 10% OF THE SUBTOTAL AMOUNT (0.10 x subtotal).
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity needed.
2) In case of a discrepancy between the unit price and the total set forth for a unit-based item, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal