This Addendum 2 document contains supplemental technical specifications for the Marshall Street Water Reclamation Facility (WRF) Sand Filter Rehabilitation project in Clearwater, Florida, involving the City of Clearwater Procurement Division and Public Utilities Department. The scope of work encompasses the rehabilitation of twelve existing sand filters and includes removal and replacement of seven Kinetrol pneumatic actuator yokes on 20-inch butterfly valves (Filter Cells 1, 2, 7, 8, 11, and 12); conditional replacement of flange bolts on a 20-inch backwash inlet butterfly valve (Filter Cell 7, contingent on contractor confirmation of malfunction); conditional replacement of two 18-inch backwash pump discharge check valves (only if testing reveals compromised backwash flow rates); replacement of sodium hypochlorite pumps and associated piping; removal and disposal or reuse of filter media; comprehensive cleaning of all filter cells including wire mesh support screens; concrete wall and floor repairs as recommended by the engineer; rehabilitation of filter components per manufacturer specifications; repacking of a 20-inch backwash inlet butterfly valve at Filter Cell 1; and replacement of the main filter control panel touch screen with improved graphics and functionality plus SCADA interface upgrades for total local control. The contract period is 420 calendar days from Notice to Proceed, with bids due October 8, 2026, and prospective bidders must pre-qualify with the City's Engineering Division at least two weeks prior to bid opening.
The specifications detail extensive requirements for piping, fittings, valves, and accessories including ductile iron pipe and fittings conforming to ANSI/AWWA standards; polyvinyl chloride (PVC) pipe and fittings for small pressure applications; stainless steel piping; gate valves, butterfly valves, swing check valves, pneumatic valve actuators, and solenoid valves from specified manufacturers; restrained couplings and flanged adaptors; and flexible expansion joints. Bidders must hold current Florida state and Pinellas County licenses or registrations and provide non-collusion affidavits, W-9 forms, and certifications regarding drug-free workplace programs, scrutinized company status, and anti-human trafficking compliance, with all contractors and subcontractors required to register with and use the E-Verify system. Subcontract work cannot exceed fifty percent of total contract work without Engineer approval. Bid security equal to ten percent of the maximum bid price is required, and the City reserves the right to reject any or all bids and will make a single award to the lowest responsible, responsive bidder. The project is an active wastewater treatment facility where work must be phased to minimize operational impact, maintaining a minimum of ten filter cells in service throughout construction, with the contractor required to submit a sequencing plan for approval and coordinate process changes with the Owner at least forty-eight hours in advance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION IVa – Supplemental Technical Specifications
JPT/lc/specs/01010 Tt #200-41125-26004 01010-1 100926
SECTION 01010
SUMMARY OF PROJECT
PART 1 - GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. This Contract is for the Marshall Street WRF Sand Filter Rehabilitation project as shown on the Drawings and specified herein. The Work consists of furnishing all labor, equipment, and materials for the repair of the structure consisting of, but not limited to, the following:
1. Removal, and reuse or hauling and disposal of filter media.
2. Removal, hauling and disposal of debris.
3. Cleaning of all filter cells including the wire mesh support screens.
4. Repair of concrete walls and floor as recommended by the Engineer.
5. Rehabilitate filter components as recommended by the Filter Equipment Manufacturer (Evoqua).
6. Removal and Replacement of seven (7) severely corroded yokes on existing pneumatic actuators on 20-inch Butterfly Valves (Filter Cells 1, 2, 7, 8, 11, and 12) as shown on the drawings.
7. Removal and Replacement of flange bolts on 20-inch Backwash Inlet Butterfly Valve (Filter Cell 7).
8. Removal and Replacement of 20-inch Backwash Inlet Butterfly Valve (Filter Cell 3, will only be necessary if Contractor confirms the valve is not functioning).
9. Removal and Replacement of two (2) 18-inch backwash pump discharge Check Valves (will only be necessary if Contractor tests and confirms the backwash flow rate is compromised).
10. Replace sodium hypochlorite pumps and associated piping to limits as shown on the drawings.
11. Repack 20-inch Backwash Inlet Butterfly Valve at Filter Cell 1.
12. Replace the touch screen for the main filter control panel with improved graphics and functionality.
13. Upgrade the SCADA interface in the filter control room to facilitate total local control of the filtration system.
SECTION IVa – Supplemental Technical Specifications
JPT/lc/specs/01010 Tt #200-41125-26004 01010-2 100926
1.02 CONTRACTOR’S USE OF PREMISES
A. The Contractor shall assume full responsibility for the protection and safekeeping of products and materials at the job site. If additional storage or work areas are required, they shall be obtained by the Contractor at no additional cost to the Owner. Payment will only be made for that portion of the work, which is fully installed including all materials, labor, and equipment.
1.03 PROJECT SEQUENCE
A. Refer to Section IV - Scope of Work for sequencing requirements.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION
JPT/lc/specs/15050
Tt #200-41125-26004 15050-1 032626
SECTION 15050
PIPING, FITTINGS, VALVES, AND ACCESSORIES
PART 1 - GENERAL
1.01 DESCRIPTION
A. Scope of Work:
1. The Work included in this Section consists of furnishing all labor, equipment, and materials and in performing all operations necessary for the construction, installation or restoration of all utility piping, valves, and appurtenances complete and ready for operation as shown on the Drawings and specified herein.
1.02 QUALITY ASSURANCE
A. Construction Requirements:
1. Install all pipe, fittings, valves, actuators. And appurtenance in accordance with the manufacturer’s instructions.
2. Install all products so as not to scratch, dent, or damage any existing component. Pipe shall be installed in a way that prevents damaging existing pipe. If existing components are damaged due to construction, the Contractor shall be required to repair the pipe according to the Owner’s requirements.
B. The entire product of any plant may be rejected when, in the opinion of the Engineer, the methods of manufacture fail to secure uniform results, or where the materials used are such as to produce inferior pipe or fittings.
1.03 SUBMITTALS
A. Shop Drawings:
1. In general, the following Shop Drawings shall be submitted to the Engineer for approval prior to construction:
a. Mill test certificates or certified test reports on pipe and fittings.
b. Details of restrained and flexible joints.
c. Expansion Joints
d. All valves and actuators.
e. Couplings.
Tt #200-41125-26004 15050-2 032626
2. A separate Shop Drawing submittal will be required for each major item listed above and for each different type of an item within a major item. For example, separate submittals will be required for butterfly, ball, solenoid, and check, valves.
3. Submit to the Engineer within 30 days after execution of the contract a typewritten schedule of valves to be furnished. The valve schedule shall include valve tags organized by process with the valve manufacturer, tag shape, letter code and number, the valve size, type, use, supplier, and the date of delivery to the site.
B. Acceptance of Material:
1. The Contractor shall furnish an Affidavit of Compliance certified by the pipe manufacturer that the pipe, fittings, and specials furnished under this Contract comply with all applicable provisions of current AWWA and ASTM standards and these Specifications. No pipe or fittings will be accepted for use in the Work on this project until the Affidavit has been submitted and approved by the
Engineer.
2. The Owner reserves the right to sample and test any pipe or fitting after delivery and to reject all pipe and fittings represented by any sample which fails to comply with the specified requirements.
C. Operation and Maintenance Manuals: Submit operation and maintenance manuals for applicable components requiring periodic maintenance and/or explanation of operation, at the discretion of the Engineer. Manuals shall be prepared in accordance with City of Clearwater specification requirements regarding operating and maintenance data.
1.04 DELIVERY, STORAGE AND HANDLING
A. Pipe, fittings, valves, and accessories shall be handled in such manner as to ensure a sound undamaged condition during shipping, delivering, and installing.
B. Particular care shall be taken not to injure the pipe coating and linings.
C. Insides of valves and piping shall be kept free of dirt and debris.
D. Payment will only be made for that portion of the work, which is fully installed including all materials, labor, and equipment.
Tt #200-41125-26004 15050-3 032626
PART 2 - PRODUCTS
2.01 DUCTILE IRON PIPE AND FITTINGS
A. Ductile Iron Pipe: Ductile iron pipe shall conform to the requirements of ANSI, A21.51 and AWWA C151, latest revision. The minimum pressure class for underground pipe shall be Class 150. Flanged pipe shall have a minimum thickness class of Class 53. Pipe shall be furnished in laying lengths of 20 feet or less, unless specifically shown otherwise on the Drawings. All pipe and fittings shall be new and unused, no refurbished piping or fittings will be accepted.
1. Ductile Iron Pipe shall be from one of the following manufacturers: American, McWane, or U.S. Pipe.
2. Push-On Joints shall be in strict accordance with AWWA C111 and ANSI A21.11
"Rubber-Gasket joints for Ductile-Iron Pressure Pipe and Fittings", latest revision, Class: 350-psi working pressure rating, and shall be as manufactured by
American (Fastite), U.S. Pipe (Tyton), or McWane (Tyton/Fastite).
a. Push-On Joint Gaskets for Potable Water shall be Styrene Butadiene
Rubber (SBR) ring type provided by the pipe manufacturer and installation shall be in strict accordance with the manufacturer's recommended practice.
B. Coating and Lining:
1. Interior Lining: All ductile iron pipe, fittings, and specials shall have an interior protective coating of cement-mortar or ceramic epoxy in accordance with the pipe schedule on the drawings.
2. Interior Coating for Sewer Pipe: Where pipe and fittings are installed to service sanitary sewer, the interior coating shall be Protecto 401.
3. Exterior Coating for Below Ground Pipe: Where ductile iron pipe and fittings are to be below ground or installed in a casing pipe the exterior coating shall be as specified in Section 09900 and exceed minimum 1.0 mil thick in accordance with
ANSI/AWWA A21.51/C151.
4. Exterior Coating for Exposed Pipe: Ductile iron pipe, fittings, and specials to be installed aboveground shall be furnished with a shop applied primer on the exterior. See Section 09900 for finished coating for all exposed piping.
C. Fittings: Fittings for ductile iron pipe shall be either mechanical joint, restrained joint, or flanged joint as indicated on the Drawings and shall have a minimum working pressure of 250 psi. Fittings shall be ductile iron and shall conform to ANSI/AWWA C110, ANSI/AWWA C111 and ANSI/AWWA C153, latest revisions for flanged and mechanical joint pipe. Fittings shall be coated and lined as indicated on the Drawings and in the manner specified above for ductile iron pipe.
Tt #200-41125-26004 15050-4 032626
D. Flanged Joints: Flanges shall be Class 125 per ANSI B16.1 with any special drilling and tapping as required to insure correct alignment and bolting.
1. Gaskets shall be suitable for a water pressure of 350 psi at a temperature of
180°F. Flanged joint bolts, washers, and nuts shall be manufactured of hot dipped galvanized, Grade B, ASTM A-307 for above ground installation, and 304 stainless steel for below ground installation.
a. Spans less than 10-feet: fullface, 1/8-inch thick neoprene rubber.
b. Spans greater than 10-feet: Toruseal gaskets as manufactured by
American, or Engineer approved equal.
E. Restrained Joints and Fittings: Pipe joints and fittings shall be restrained in accordance with restrained joint detail as shown on the drawings and the requirements of this
Specification. It is intended that, at a minimum, all fittings shall be restrained. In cases where the calculated required length of restrained pipe is not evenly divisible by nominal laying lengths of pipe, the total required length of restrained pipe shall be rounded up to the next closest nominal length that is evenly divisible by the standard laying length.
1. Manufactured Restrained Joints: Joints shall be manufacturer's standard specifically modified push-on type joints with joint restraint provided by ductile iron retainer rings joined together by corrosion-resistant, high strength steel tee head bolts and nuts or with joint restraint provided by a welded-on retainer ring and a split flexible ring assembled behind the retainer ring.
a. Manufactured Restrained Joints for Potable and Reclaimed Water shall be from one of the following manufacturers: EBAA Iron, Romac, Tyler, or MJR.
2. Alternate Restrained Joints: Ductile iron pipe and fittings with mechanical joints may be restrained using a follower gland which includes a restraining mechanism. When actuated during installation, the restraining device shall impart a multiple wedging action against the pipe wall which increases resistance as internal pressure in the pipeline increases.
a. The joint shall maintain flexibility after installation. Glands shall be manufactured of ductile iron conforming to ASTM A536 and restraining devices shall be of heat-treated ductile iron with a minimum hardness of 370 BHN. The gland shall have standard dimension and bolting patterns for mechanical joints conforming to ANSI/AWWA C111 and
C153, latest revisions.
b. The restraining wedges shall have twist-off nuts to insure proper torqueing. The mechanical joint restraint device shall have a minimum
Tt #200-41125-26004 15050-5 032626 working pressure rating of 250 psi with a minimum safety factor of 2 to
1. The restraint devices shall be coated using MEGABOND™.
c. Alternate Restrained Joints shall be MEGALUG as manufactured by
EBBA Iron, Inc. No other follower retainer gland with restraining mechanism will be acceptable.
3. Push-On (Gasket) Restrained Joints: Pipe using push-on (gasket) restrained joints shall be in strict accordance with AWWA C111 and ANSI A21.11 "Rubber-
Gasket joints for Ductile-Iron Pressure Pipe and Fittings", latest revision; and shall be as manufactured by American (Fastite with Fast-Grip Gasket), U.S. Pipe
(Field Lok), or McWane (Sure Stop). Jointing materials shall be provided by the pipe manufacturer and installation shall be in strict accordance with the manufacturer's recommended practice. Pipe restraint shall be provided by the use of colored restraining gaskets. The gaskets shall be ANSI/NSF 61 certified, and the color shall be consistent throughout the entire cross section of the gasket. The color shall not be attained by the surface coating, it shall be inherent with rubber.
4. Restrained joint pipe and fittings shall be ductile iron only and shall comply with applicable portions of this Specification. Manufactured restrained joints shall be capable of deflection during assembly. Deflection shall not exceed 80 percent of the manufacturer's recommendations.
5. Tee head bolts, washers, and nuts for mechanical joints shall be manufactured of Ductile iron meeting ASTM A536, Grade 65-42-10 or Corten steel meeting the requirements of ASTM A242.
2.02 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
A. Small PVC Pressure Piping: Unless otherwise specified, PVC pressure pipe smaller than 4 inches nominal diameter shall be Schedule 80 PVC in accordance with ASTM D1785.
Schedule 80 pipe shall have either solvent welded or threaded joints. PVC pressure pipe shall bear the approved seal of the National Sanitation Foundation (NSF). PVC pipe that is exposed to sunlight shall be manufactured with additives to provide resistance to ultraviolet deterioration.
1. Fittings: Socket type, solvent welded fittings for Schedule 80 PVC pipe shall be in conformance with ASTM D2467. Threaded type fittings for Schedule 80 PVC pipe shall be in conformance with ASTM D2464. All solvent welded or threaded joints shall be watertight.
2. Flanges: Flanges for Schedule 80 PVC pipe shall be rated for a 150-psi working pressure with ANSI B 16.1 dimensions and bolting pattern. Flanges shall be connected to PVC piping with either solvent welded or threaded joints in accordance with ASTM D2467 or ASTM 2464, respectively. Gaskets shall be
Tt #200-41125-26004 15050-6 032626 neoprene, full faced type with a minimum thickness of 1/8-inch. Nuts and bolts shall be hexagonal with machine threads, manufactured of Type 316 stainless steel in accordance with ASTM A320, Class 2. Type 316 stainless steel flat washers, with lock washers, shall be used against PVC flanges. The nuts shall have a hardness that is lower than that of the bolts and washers by a difference of 50 Brinell hardness to prevent galling during installation.
3. Solvent Cement: PVC solvent cement shall be in compliance with ASTM D2564 and in accordance with the pipe manufacturer's recommendations.
4. Thread Lubricant: Lubricant for Schedule 80 threaded joints shall be Teflon tape only.
2.03 STAINLESS STEEL PIPE & FITTINGS
A. Pipe - Pipe smaller than 3 inches shall conform to ASTM A 312, Grade TP 304L. Pipe 3 inches and larger shall conform to ASTM A 312 or A778, Grade TP 304L.
1. Pipe sizes and wall thicknesses shall conform to ANSI B36.19 as follows:
Pipe Size Wall Thickness
1 inch and smaller Schedule 80S
1-1/4 inches through 2 inches Schedule 40S
3 inches through 8 inches Schedule 10S
Larger than 8 inches, through 30 inches Schedule 10S
B. Fittings - Fittings 3 inches and smaller shall be threaded or socket welded, conforming to
ANSI B16.11, 3,000-pound CWP. Material for threaded fittings shall conform to ASTM A
403, Class WP304 or ASTM A 182, Grade F304. Material for socket welded fittings shall conform to ASTM A 403, Class WP304L or ASTM A 182, Grade F304L.
1. Fittings shall be butt-welded or flanged, conforming to ASTM A403, Class WP or
ASTM A774, same material and wall thickness as the pipe, conforming to ANSI
B16.9. Elbows shall be long radius.
2. Fitting material shall be the same as the pipe.
2.04 GATE VALVES
A. Iron Gate Valves:
1. Iron gate valves shall open by turning to the left (counterclockwise), when viewed from the stem. When fully open, gate valves shall have a clear waterway equal to the nominal diameter of the pipe. Operating nut or hand wheel shall have an arrow cast in the metal indicating the direction of opening.
Tt #200-41125-26004 15050-7 032626
Each valve shall have the manufacturer's distinctive marking, pressure rating and year of manufacture cast on the body. Prior to shipment from the factory, each valve shall be tested by applying to it a hydrostatic pressure equal to twice the specified working pressure. Hydrostatic and leakage tests shall be conducted in strict accordance with ANSI/AWWA C500 or ANSI/AWWA C509 and ANSI/AWWA C515, latest revisions, whichever is applicable. Each valve shall be fusion bond epoxy coated.
2. Gate valves with nominal sizes from 2 to 2 1/2 inches shall conform to
ANSI/AWWA C509 and ANSI/AWWA C515, latest revision, and shall be designed for a minimum working pressure of 200 psi. Valves shall be iron body, bronze-mounted, double disc, parallel seat, non-rising stem type with double, Buna-N, O-ring stem seals. Bronze items of construction shall include the stems, seat rings, stem nuts, wedge bushings, and upper and lower wedges. Bronze used for construction of these items shall be low zinc alloy bronze. Valve ends shall be screwed and as specified for steel pipe and fittings. Interior ferrous surfaces of valve, except for finished or bearing surfaces, shall be coated with a fusion bonded or thermo-setting epoxy coating in accordance with AWWA C550, latest revision. Coating shall be holiday-free, NSF approved, with a minimum thickness of 7 mils. Surfaces shall be clean, dry, and free from rust and grease before coating. Exterior surfaces shall be coated as specified hereinafter.
a. Gate valves with nominal sizes from 2 to 2 1/2 inches shall be as manufactured by American-Darling Valve Company, Kennedy Valve
Manufacturing Company, or Dresser Industries, Inc.
3. Gate valves with nominal sizes from 3 to 24 inches shall conform to
ANSI/AWWA C509 and ANSI/AWWA C515, latest revision, and shall be designed for a minimum working pressure of 200 psi. Valves shall be iron body resilient seat type with O-ring stem seals. The valve stem, stem nut, glands, and bushings shall be bronze. Valve disc shall be constructed to assure uniform seating pressure between disc seat ring and body seating surface. Resilient seat of valve shall be formed by a special corrosion and chlorine resistant, synthetic elastomer which is permanently bonded to and completely encapsulates a cast iron valve disc. Valve ends for underground installation shall be mechanical joint as specified for ductile iron pipe and flanged for above-ground valves.
a. Resilient-seated type gate valves with nominal sizes from 3 to 24 inches shall be manufactured by Clow F6100, Mueller A-2360, A-2361, U.S.
Pipe Metroseal 250, Waterous Series 500, American Flow Control Series
2500, M&H 4067, ITT Kennedy: Ken Seal II, and AVK.
4. Valve Joints: All gate valves shall have either mechanical joint, restrained joint, or flanged ends to fit the pipe run in which they are to be used. Gate valves installed on push-on joint pipe shall have mechanical joint ends unless otherwise specified.
Tt #200-41125-26004 15050-8 032626
5. Valve Operators: Unless otherwise shown on the Drawings or specified herein, gate valves shall have non-rising stems. Buried gate valves shall be furnished with a 2-inch square AWWA standard nut operator with a valve box and cover.
Gate valves located aboveground or inside structures shall be furnished with a handwheel operator which shall have an arrow cast in the metal indicating the direction of opening. Gate valves used as isolation valves for reduced pressure back flow preventers shall be of the open screw and yoke (OS&Y) design with a handwheel operator.
6. Interior Valve Coating: Interior of the valve body shall be coated with a fusion bonded or thermo-setting epoxy coating in accordance with AWWA C550, latest revision. Coating shall be NSF approved, with a minimum thickness of 7 mils.
Surfaces shall be clean, dry, and free from rust and grease before coating.
2.05 BUTTERFLY VALVES (STANDARD SERVICE)
A. Butterfly valves for liquid service, 4 inches in size and larger, shall be Class 150-B in conformance with ANSI/AWWA C504, latest revision and designed for a minimum working pressure of 150 psi. Butterfly valves shall be of the tight closing rubber seat type. Valves shall be bubble tight with 150 psi on the upstream side of the valve and 0 psi on the downstream side and shall be satisfactory for applications involving valve operation after long periods of inactivity. Valve discs shall rotate 90 degrees from the fully open position to the fully closed position. Butterfly valves shall be as manufactured by American-Darling Valve Company, M&H, Kennedy Valve Manufacturing Company, Mueller Company, DeZurik, Henry Pratt Company, or an approved equal.
B. Valve bodies shall be constructed of high-strength cast iron conforming to ASTM A126, Class B. Buried valves shall have integrally cast mechanical joint ends as specified for ductile iron pipe and above-ground valves shall have cast iron flanges.
End flanges shall conform in dimensions and drilling to ANSI B16.1, Class 125. Two trunnions for shaft bearings shall be integral with each valve body. Valve body thickness shall be in strict accordance with ANSI/AWWA C504 latest revision for Class 150-B valves.
C. Valve seat ring shall be constructed of Type 304 stainless steel. Seating edges of the seat ring shall be smooth and polished. The seat ring shall be capable of compensating for changes in direction of flow to assure a bubble tight seal in either direction.
D. Valve discs shall be solid (no cores) for 24-inch and smaller valves and shall be either solid or hollow core for valves greater than 24-inch. Discs shall be constructed of ASTM
A536, Grade 65-45-12 ductile iron. Valve disc shall be of the offset design to provide
360-degree uninterrupted seating.
E. Valve shafts may consist of a one-piece unit extending completely through the valve disc bearings and into the operating mechanism or may be of the "stub shaft" type, which comprises two separate shafts inserted into the valve disc hubs. If used, stub shafts shall extend a minimum of 1 1/2 shaft diameters into the valve disc hubs. Valve shafts shall be constructed of ASTM A276, Type 304 stainless steel or a stainless steel with
Tt #200-41125-26004 15050-9 032626 greater overall corrosion and oxidation resistance. The minimum shaft diameter shall conform to ANSI/AWWA C504, latest revision for Class 150B valves. The valve disc shall be attached to the shaft by means of "O" ring sealed taper pins. The valve shaft seal shall consist of "O" rings in a bronze cartridge or self-adjusting nitrile Vee-type ring seals.
F. Valve seats shall be of a corrosion resistant synthetic rubber compound bonded to a high grade stainless steel retaining ring and secured to the valve disc by Type 304 stainless steel set screws or shall be molded in, vulcanized, and bonded to the body.
Seats bonded to the body shall withstand a 75-pound pull tested in accordance with
ASTM D429, Method B. The valve seat shall be adjustable and replaceable in the field without dismantling operator, disc, or shaft.
G. Valve shafts shall be fitted with sleeve-type bearings. Bearings shall be corrosion resistant and self-lubricating (Nylon or Teflon). Bearings shall be designed for a pressure not exceeding the published design load for the bearing material, or 1/5 of the compressive strength of the bearing or shaft material.
H. All butterfly valves shall open left or counterclockwise when viewed from the stem.
Manual valve operators shall be of the worm gear or traveling nut type and shall be fully enclosed. All operators shall have adjustable mechanical stop limiting devices to prevent over travel of disc. Should an adjustment of the disc be required to maintain a bubble tight seal, this adjustment shall be made externally without removing the operator housing cover. The operator shall be designed such that all adjustments can be made under pressure and without the possibility of dirt getting into the operator lubricant. Any adjustments through the lower shaft will not be acceptable. Units furnished for buried service shall be fully gasketed and grease packed. Manual valves located above ground shall be equipped with handwheel or chainwheel operators and shall have a suitable indicator arrow to give valve position from fully open to fully closed. Each buried butterfly valve shall be furnished with a 2-inch square AWWA nut operator with valve box and cover. Operator components shall, at the extreme operator positions, withstand without damage a pull of 200 lbs. for handwheel or chainwheel operators or an input torque of 300 ft.-lbs. for operating nuts.
I. Interior of valve body and valve disc except for valve seat and stainless-steel valve seat ring shall be coated with a fusion bonded or thermosetting epoxy coating in accordance with AWWA C550, latest revision. Coating shall be holiday-free, NSF approved, with a minimum thickness of 16 mils. Surfaces shall be clean, dry, and free from rust and grease before coating.
J. All exterior surfaces of butterfly valves shall be clean, dry, and free from rust and grease before coating. For buried service, the exterior ferrous parts of all valves shall be coated at the factory with epoxy in accordance with AWWA C550. For valves installed aboveground, the exterior ferrous parts of all valves shall be shop primed at the factory with one coat, minimum dry film thickness of 4 mils, of a rust inhibitive, universal epoxy primer. Primer shall be suitable for finish paint specified. Following installation, aboveground valves shall be finish painted in accordance with Section 09900: Painting.
Tt #200-41125-26004 15050-10 032626
K. Prior to shipment from the factory, hydrostatic and leakage tests shall be conducted for each butterfly valve. Hydrostatic and leakage tests shall be conducted in strict accordance with ANSI/AWWA C504, latest revision, and results shall be submitted to the
Engineer.
2.06 PNEUMATIC VALVE ACTUATORS
A. Manufacturer: Kinetrol
B. Pneumatic valve actuators shall be quarter-turn double acting rotary vane actuators specifically sized and designed for the intended applications. Sizing shall be based on a valve working pressure of 10 psi for all valves. It is anticipated that the compressed air system will maintain a pressure of 70 psi. The manufacturer shall field verify conditions during bidding.
2.07 SWING CHECK VALVES
C. Swing check valves 2-inch through 24-inch in size shall conform to AWWA C508, latest revision, and shall be designed for a minimum water working pressure of 150 psi. Check valves shall have cast iron body, swing type design, and ends shall be flanged, Class 125 in accordance with ANSI B16.1. When open, the valve shall have a straight way passage with a minimum flow area equal to the full pipe area. Swing check valves shall be completely bronze fitted with renewable bronze seat ring and a rubber faced disc.
Valve hinge pin shall be stainless steel.
Check valves shall be supplied with an outside lever and weight. The check valve bonnet shall be provided with a tapped boss with plug for future installation of a pressure gauge.
B. Each check valve for the reclaimed water pumps shall be oil cushioned such that it opens smoothly on pump start-up and closes at a controlled rate of speed for the final predetermined portion of its stroke following pump shutdown. A single cushioning device mounted on the external side of the valve shall control the valve closure by way of the interchange of oil to and from an oil reservoir. The use of an air or gas pressurized oil reservoir shall not be permitted. On start-up of the pump, the check valve disc shall open in response to the flow and then afford the minimum resistance to the flow. Upon pump shutdown, the valve's counterweight shall initiate the valve closure at an unrestricted rate until the valve disc reaches the preselected point of closure. The point at which the adjustable closing speed occurs shall be field-adjustable.
The closing speed shall also be adjustable in the field by way of a micrometer type needle valve.
C. Swing check valves shall absolutely prevent the return of water back through the valve when the inlet pressure decreases below the downstream pressure. The check valve shall be constructed such that the disc and body seat ring may be easily removed and replaced without removing the valve from the line. Each valve shall be hydrostatically tested at the factory, at a test pressure of 300 psi.
Tt #200-41125-26004 15050-11 032626
D. Prior to shipment from the factory, the interior ferrous surfaces of the valve, except for finished, non-ferrous, or bearing surfaces, shall be coated with a fusion bonded or thermosetting epoxy coating in accordance with AWWA C550, latest revision. Coating shall be holiday-free, NSF approved, with a minimum thickness of 16 mils. Surfaces shall be clean, dry, and free from rust and grease before coating.
E. All exterior surfaces of swing check valves shall be clean, dry, and free from rust and grease before coating. Exterior ferrous parts of all valves shall be shop primed at the factory with one coat, minimum dry film thickness of 4 mils, of a rust inhibitive, universal primer. Primer shall suitable for finish paint specified. Following installation, valves shall be finish painted in accordance with Section 09900: Painting.
F. Valve Manufacturer: Non-cushioned swing check valves shall be manufactured by
Kennedy, M&H, Mueller, Clow, Empire, American, Golden Anderson, or an approved equal. Oil cushioned lever and weight swing check valves shall be Golden-Anderson
Figure No. 25-DXH, or an equal approved by the Engineer.
2.08 TIE RODS
A. Steel for tie rods shall conform to the requirements of ASTM Designation A242, and rods shall be galvanized in conformance with requirements of ASTM Designation A123.
2.09 SOLENOID VALVES
A. Solenoid valves of sizes 1/4 inch through 2 inches for water and air service shall have forged brass (Alloy C23000) or bronze (ASTM B62) bodies with Teflon main seats.
Internal plunger, core tube, plunger spring, and cage assembly shall be stainless steel
(Types 302, 304, or 305). Solenoid enclosures shall be NEMA 4, except where explosion-proof is noted in the drawings. Valve actuators shall be 120-volt a-c. Seals shall be
Teflon. Valves shall have a maximum operating pressure and a maximum differential pressure of 125 psi. Solenoid valves shall be energized to open. Valves shall be ASCO
"Redhat" Model 8210 or equal.
2.10 RESTRAINED COUPLINGS
A. Joint Restraint to prevent axial separation shall be incorporated into the design of the sleeve or coupling used to connect two plain pipe ends.
B. The restraint mechanism shall consist of a plurality of individually actuated gripping surfaces to maximize restraint capability. Torque limiting twist off nuts shall be used to insure proper actuating of the restraint devices. The restraint devices shall be coated using MEGABOND™.
C. Ductile Iron components shall be of a minimum of 65-45-12 ductile iron meeting the requirements of ASTM A536 of the latest revision and shall be tested in accordance with the stated standard.
Tt #200-41125-26004 15050-12 032626
D. The restrained joining system shall meet the applicable requirements of AWWA C219, ANSI/AWWA C111/A21.11, and ASTM D2000.
E. The restrained joining system shall be the EBAA Iron Series 3800 or approved equal.
2.11 RESTRAINED FLANGED ADAPTORS
A. Restrained flange adapters shall be used in lieu of threaded, or welded, flanged spool pieces. Flange adapters shall be made of ductile iron conforming to ASTM A536 and have flange bolt circles that are compatible with ANSI/AWWA C110/A21.10.
B. Restraint for the flange adapter shall consist of a plurality of individual actuated gripping wedges to maximize restraint capability. Torque limiting actuating screws shall be used to insure proper initial set of gripping wedges. The restraint devices shall be coated using MEGABOND™.
C. The flange adapter shall be capable of deflection during assembly, or permit lengths of pipe to be field cut, to allow a minimum of 0.6” gap between the end of the pipe and the mating flange without affecting the integrity of the seal.
D. The flange adapter shall have a safety factor of 2:1 minimum.
E. The flange adapter shall be the SERIES 2100 MEGAFLANGE adapter, as produced by
EBAA Iron, Inc., or approved equal.
2.12 EXPANSION JOINTS
A. Flexible Expansion Joints
1. Flexible expansion joints shall be of the molded wide double arch design manufactured of neoprene rubber with polyester and steel reinforcement.
Neoprene body shall be supplied with a Hypalon coating. All expansion joints shall have filled arches. Joints shall be flanged, suitable for 150 psi water working pressure, and in accordance with ANSI B16.1 dimensions and bolting patterns. Flanged ends shall be furnished with galvanized, split ductile iron retaining rings.
2. Provide limit restraint rods on all lines as shown on the Drawings.
Tt #200-41125-26004 15050-13 032626
3. Minimum performance for flexible expansion joints shall be as follows:
Size
(Inches)
Axial
Compression
(Inches)
Axial
Elongation
(Inches)
Lateral
Deflection
(Inches)
Angular
Deflection
Degrees
2 7/8 1/2 1 30
4 7/8 1/2 1 30
6 7/8 1/2 1 25
8 1-3/8 3/4 1 25
10 1-3/8 3/4 1 20
12 1-3/8 3/4 1 20
24 1-5/8 7/8 1 20
4. Flexible expansion joints shall be as manufactured by Mercer, Metraflex
Company, EBBA Iron, or an equal approved by the Engineer.
2.13 MISCELLANEOUS ITEMS
A. Other items necessary for the complete installation and not specified herein shall conform to the details and notes shown on the Drawings. All minor items implied, usually included, or required for the construction of a complete operating system shall be installed whether shown on the Drawings or not.
PART 3 - EXECUTION
3.01 INSPECTION
A. All pipe, fittings, valves, and other material shall be subject to inspection and approval by the Engineer after delivery, and no broken, cracked, imperfectly coated, or otherwise damaged or unsatisfactory material shall be used. When a defect or crack is discovered, the injured portion shall not be installed. Cracked pipe shall have the defect cut off at least 12 inches from the break in the sound section of the barrel.
3.02 GENERAL INSTALLATION REQUIREMENTS
A. Excavation, backfill, and compaction shall conform to the provisions of Division 2. Upon satisfactory installation of the pipe bedding material as specified in Division 2, a continuous trough for the pipe barrel and recesses for the pipe bells or couplings shall be excavated by hand digging. When the pipe is laid in the prepared trench, true to line and grade, the pipe barrel shall receive continuous, uniform support and no pressure will be exerted on the pipe joints from the trench bottom.
B. Cover for underground piping shall not be less than that indicated on the Drawings. The minimum cover for pipe shall be 36 inches. In areas where other piping conflicts preclude the maximum cover desired, the piping shall be laid to provide the maximum cover obtainable.
Tt #200-41125-26004 15050-14 032626
C. Pipe, fittings, valves, and accessories shall be installed as shown or indicated on the
Drawings.
D. All connections to existing piping systems shall be made as shown or indicated on the
Drawings after consultation and cooperation with authorities of the Owner. Some such connections may have to be made during off-peak hours (late night or early morning).
E. Pipe Joint Deflection: Whenever it is desirable to deflect pipe joints to avoid obstructions or to maintain required alignment, the amount of the joint deflection shall not exceed 80 percent of the maximum limits allowed by the pipe manufacturer.
F. In preparation for pipe installation, placement (stringing) of pipe should be as close to the trench as practical on the opposite side of the trench from the excavated material.
The bell ends of the pipe should point in the direction of the work progress.
G. Pipe and fittings shall be laid accurately to the lines and grades indicated on Drawings or required. Where grades for the pipeline are not indicated on the Drawings, maintain a uniform depth of cover with respect to finish grade. Care shall be taken to insure a good alignment both horizontally and vertically and to give the pipe a firm bearing along its entire length. Any pipe which has its grade or joint disturbed after laying shall be taken up and relayed.
H. All pipe and fittings shall be cleared of sand, dirt, and debris before laying. All precautions shall be taken to prevent sand, dirt, or other foreign material from entering the pipe during installation. If necessary, a heavy, tightly woven canvas bag of suitable size shall be placed over each end of the pipe before lowering into the trench and left there until the connection is made to the adjacent pipe. Any sand, dirt, or other foreign material that enters the pipe shall be removed from the pipe immediately. Interior of all pipe and fittings shall be kept clean after installation until accepted in the complete
Work.
I. Any time that pipe installation is not in progress, the open ends of pipe shall be closed by a watertight plug or other method approved by the Engineer. Plugs shall remain in pipe ends until all water is removed from the trench. No pipe shall be installed when trench conditions are unsuitable for such work, including standing water, excess mud, or rain.
J. After pipe has been laid, inspected, and found satisfactory, sufficient backfill shall be placed along the pipe barrel to hold the pipe securely in place while conducting the preliminary hydrostatic test. No backfill shall be placed over the joints until the preliminary test is satisfactorily completed, leaving them exposed to view for the detection of visible leaks.
K. Upon satisfactory completion of the hydrostatic test, backfilling of the trench shall be completed.
L. Above ground and Exposed Piping: Piping shall be cut accurately to measurements established at the job site and shall be worked into place without springing or forcing, Tt #200-41125-26004 15050-15 032626 properly clearing all equipment access areas and openings. Changes in sizes shall be made with appropriate reducing fittings. Pipe connections shall be made in accordance with the details shown and manufacturer's recommendations. Open ends of pipelines shall be properly capped or plugged during installation to keep dirt and other foreign material out of the system. Pipe supports and hangers shall be provided where indicated or as required to ensure adequate support of the piping.
L. Existing water services shall remain in service until all new pipe construction and clearances are completed. Contractor shall notify before abandoning existing water mains.
3.03 INSTALLATION OF VALVES
A. Valves of the size and type shown on the Drawings shall be set plumb and installed at the locations indicated on the Drawings. Valves shall be installed in accordance with manufacturer's installation instructions and with the details shown on the Drawings.
B. Valves shall be installed such that they are supported properly in their respective positions, free from distortion and strain. Valves shall be installed such that their weight is not borne by pumps and equipment that are not designed to support the weight of the valve.
C. Valves shall be carefully inspected during installation; they shall be opened wide and then tightly closed and the various nuts and bolts shall be tested for tightness. Special care shall be taken to prevent any foreign matter from becoming lodged in the valve seat. Check and adjust all valves for smooth operation.
D. Install valves with the operating stem in either horizontal or vertical position.
E. Allow sufficient clearance around the valve operator for proper operation.
F. Clean iron flanges by wire brushing before installing flanged valves. Clean carbon steel flange bolts and nuts by wire brushing, lubricate threads with oil or graphite, and tighten nuts uniformly and progressively. Clean threaded joints by wirebrushing or swabbing. Apply Teflon joint compound or Teflon tape to pipe threads before installing threaded valves. Joints shall be watertight.
H. Valves shall be tested hydrostatically, concurrently with the pipeline in which they are installed. Protect or isolate any parts of valves, operators, or control and instrumentation systems whose pressure rating is less than the pressure used for the pressure test(s). If valve joints leak during pressure testing, loosen or remove the nuts and bolts, reseat or replace the gasket, reinstall or retighten the bolts and nuts, and hydrostatically retest the joints.
Tt #200-41125-26004 15050-16 032626
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK
3'-4" X 1'-6"
OVERFLOW DUCT
TO CLEARWELL
EXISTING FILTER
CONTROL PANEL
(TYP 6)
TANK
NO. 12
TANK
NO. 11
TANK
NO. 10
TANK
NO. 9
TANK
NO. 8
TANK
NO. 7
TANK
NO. 1
TANK
NO. 4
TANK
NO. 5
TANK
NO. 6
TANK
NO. 2
TANK
NO. 3
REMOVE AND REPLACE SODIUM
HYPOCHLORITE PUMPS AND
PIPING. SEE SHEET D-101.
1 1 1 3
FILTER BUILDING
LOWER LEVEL PLAN
SCALE: NTS
N
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
SHEET NO.:
CONTRACT NO.:
CITY ENGINEER TARA L. KIVETT, P.E. # 86611
DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED FOR
CONSTRUCTION
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
CITY ENGINEER TARA L. KIVETT, P.E. # 8661110
/1
2/
:5 0:
P
M
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-4
-2
M S
W R
F
FI
LT
ER
R
EH
AB
\P
R O
JE
C
T
FI
LE
S\
C
AD
\S H
EE
TF
IL
ES
\D -1
.D
W G
SW
AR
TZ
EN
TR
U
BE
R , B
R
AN
D O
N
CITY OF CLEARWATER, FLORIDA
PUBLIC UTILITIES
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
CALL 811
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
OF
RECORD DRAWINGS D-100
25-0008-UT
200-41125-26004
N/A
12/30/2025
BID SET
201 EAST PINE STREET, SUITE
1000 ORLANDO, FLORIDA 32801
PHONE: (407) 839-3955
ENGINEERING BUSINESS NO. 2429
www.tetratech.com
OF
FILTER REHABILITATION
LOWER PLAN
N/A
BLS
JPT BK
N/A
N/A
NOTES:
1. REMOVE AND REPLACE EXISTING ACTUATORS WITH KINETROL 157-100M DA PNEUMATIC
ACTUATORS ON EXISTING 20" BUTTERFLY VALVES ON FILTER CELLS 1, 2, 7, 8, 11, AND 12.
2. REPACK 20" BUTTERFLY VALVE, ON FILTER CELL 1.
3. REMOVE AND REPLACE FLANGE BOLTS ON BUTTERFLY VALVE ON FILTER CELL 7.
4. CONTRACTOR TO REMOVE EXISTING ACTUATOR AND MANUALLY OPEN 20" BUTTERFLY
VALVE ON FILTER CELL 3 TO DETERMINE IF THE VALVE IS FUNCTIONING. IF THE VALVE IS
FROZEN, REMOVAL/REPLACEMENT OF VALVE WILL BE REQUIRED.
5. CONTRACTOR TO CHECK BACKWASH PUMP CHECK VALVES POSITIONING TO SEE IF THEY
CAN BE FULLY OPENED. RE-VERIFY BACKWASH RATE. BACKWASH RATE SHALL BE 4,320
GPM PER FILTER CELL. IF BACKWASH FLOW RATE CONTINUES TO BE COMPROMISED,
IDENTIFICATION AND REMOVAL/REPLACEMENT OF DEFECTIVE DISCHARGE VALVES WILL
BE REQUIRED.
6. ALL FILTER WALLS AND EQUIPMENT SHALL BE COMPLETELY CLEANED IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS AND MADE SUITABLE FOR A VISUAL EVALUATION.
7. CONTRACTOR SHALL WASH/PREPARE EXISTING MEDIA FOR REUSE IN COMBINATION WITH
NEW MATERIAL TO RESTORE A MEDIA DEPTH OF 10 INCHES. SHOULD THE EXISTING MEDIA
BE UNUSABLE, CONTRACTOR TO PROVIDE NEW MEDIA.
8. FILTER MANUFACTURER TO INSPECT ALL FILTER CELL UNDERDRAINS ONCE CLEANED OUT
TO DETERMINE IF ANY GRATING, SEAL STRIPS, CHANNELS, FASTENERS, MESH SCREENS,
I-BEAMS, LONG ANGLES, SHORT ANGLES OR CLIP ANGLES NEED TO BE REPAIRED OR
REPLACED. FILTER MANUFACTURER TO PROVIDE A LIST OF THE NECESSARY REPAIRS TO
THE CITY AND CONTRACTOR AFTER INSPECTION. NO REPAIRS SHALL BE MADE UNTIL
APPROVED BY THE CITY AND ENGINEER.
ADDENDUM 2 LC 10/09/26
REMOVE AND REPLACE
STAINLESS STEEL 5/8 HEX NUTS AND FLAT WASHERS
INCLUDED AS PART OF HOLD DOWN ASSEMBLIES
12 REQ'D PER FILTER
REMOVE AND REPLACE
2" x 1 1/2" x 1/4" 304 STAINLESS STEEL PERIMETER HOLD
DOWN ANGLE, LONG LEG VERTICAL
12 REQ'D PER FILTER
REMOVE AND REPLACE
STAINLESS STEEL WIRE MESH T
316 40 x 40 x 0.010 WIRE
6 REQ'D PER FILTER
REMOVE AND REPLACE
CORE SEALING STRIP 1/8" x 1" GLUED
BACK GASKET. IN FILTER CELLS NO. 1,
3, 5, AND 8.
24 FT REQ'D PER FILTER.
REMOVE AND REPLACE
STAINLESS STEEL HOLD DOWN ASSEMBLIES
EACH ASSEMBLY CONSISTS OF:
(ONE) SQ. HEAD CUP POINT SET SCREW
(TWO) HEX NUTS
(TWO) FLAT WASHERS
72 REQ'D PER FILTER
REGROUT AROUND EACH HOLD DOWN ASSEMBLY
AFTER NEW ASSEMBLY HAS BEEN INSTALLED
AIR VENT TUBE AND TEE (EXISTING)
GROUT AROUND TEE IS TO BE AIR TIGHT,
REGROUT AS REQUIRED (TYP.)
UNDERDRAIN FRAMES
AIR VENT TUBE AND TEE (EXISTING)
GROUT AROUND TEE IS TO BE AIR TIGHT,
REGROUT AS REQUIRED (TYP.)
5/8" S.S. SQ. HD. SET SCREW x 4" LG. W/TWO
EACH S.S. FLAT WASHER AND HEX NUT 36
REQ'D PER FILTER
UNDERDRAIN CORES.
18 REQ'D PER FILTER
REMOVE AND REPLACE
3/16" x 3" MEDIUM COMPRESSION CLOSED
CELL NEOPRENE GASKET IN FILTER CELLS
NO. 1, 3, 5, AND 8. NOTE: OVERLAP GASKETS
AT EACH END.
84 FT REQ'D PER FILTER
CLEAN FIBERGLASS GRATINGS
18 REQ'D PER FILTER
REMOVE AND REPLACE
2" x 1 1/2" x 1/4" 304 STAINLESS STEEL
PERIMETER HOLD DOWN ANGLE WITH
HOLD DOWN CLIPS EACH END
12 REQ'D PER FILTER
REMOVE AND REPLACE
S4 7.7# 304 STAINLESS STEEL
HOLD DOWN BEAM IN FILTER
CELLS 3, 5 AND 7 (24 TOTAL)
SURVEYED BY:
APPROVED BY:
REVIEWED BY:
PROJECT ENGINEER
DRAWN BY:
DATE
DATE
REVISION BY DATE
SHEET NO.:
CONTRACT NO.:
CITY ENGINEER TARA L. KIVETT, P.E. # 86611
DATE DRAWN:
DESIGNED BY:
SURVEYED BY:
APPROVED FOR
CONSTRUCTION
HORIZ.
DRAWN BY:
VERT.
SCALE:DWG NAME: FIELD BOOK:
CHECKED BY:
DATE
JOB NO.:
CITY ENGINEER TARA L. KIVETT, P.E. # 8661110
/9
/2
:1 4:
A
M
C :\U
SE
R
S\
JE
R
EM
Y.
ST
AN
O
\D C
\A C
C D
O C
S\
TE
TR
A
TE
C
H
IN
C \2
-4
-2
M
S W
R F
FI
LT
ER
R
EH
AB
\P R
O
JE
C T
FI
LE
S\ C
AD
\S
H
EE
TF
IL
ES
\D
-5
.D W
G
ST
AN
O , J
ER
EM
Y
CITY OF CLEARWATER, FLORIDA
PUBLIC UTILITIES
100 S. MYRTLE AVE.
CLEARWATER, FL 33756
CALL 811
INVESTIGATE BEFORE YOU EXCAVATE
SUNSHINE STATE
ONE CALL
OF FLORIDA
www.callsunshine.com
(800) 432-4770
MIN. 48 HOURS
BEFORE YOU EXCAVATE
OF
RECORD DRAWINGS D-501
25-0008-UT
200-41125-26004
N/A
12/30/2025
BID SET
201 EAST PINE STREET, SUITE
1000 ORLANDO, FLORIDA 32801
PHONE: (407) 839-3955
ENGINEERING BUSINESS NO. 2429
www.tetratech.com
NOTES:
1. UNDERDRAIN DETAIL SHOWN IS NOT INTENDED TO IDENTIFY THE FILTER
COMPONENTS WHICH ARE REQUIRED TO BE REPLACED. DETAIL IS PROVIDED AS A
REFERENCE FOR THE CONTRACTOR TO ILLUSTRATE THE COMPLETE ASSEMBLY OF
ONE (1) FILTER SUBCELL.
2. QUANTITIES SHOWN ARE FOR COMPLETE INSTALLATION OF ONE (1) FILTER
SUBCELL. TOTAL ESTIMATED QUANTITIES OF FILTER EQUIPMENT AND
COMPONENTS ARE LISTED IN THE BID FORM. FILTER MANUFACTURER TO INSPECT
ALL FILTER CELL UNDERDRAINS ONCE CLEANED OUT TO DETERMINE IF ANY
GRATING, SEAL STRIPS, CHANNELS, FASTENERS, MESH SCREENS, I-BEAMS, LONG
ANGLES, SHORT ANGLES OR CLIP ANGLES NEED TO BE REPAIRED OR REPLACED.
FILTER MANUFACTURER TO PROVIDE THE NECESSARY REPAIRS TO THE CITY AND
CONTRACTOR AFTER INSPECTION.
3. CITY TO CONFIRM WHAT REPAIRS OR REPLACEMENTS ARE TO BE MADE PRIOR TO
STARTING ANY WORK ON THE FILTER UNDERDRAINS OR ORDERING ANY
EQUIPMENT.
4. ALL STAINLESS-STEEL HARDWARE, FASTENERS, AND ANCHORS SHALL BE
ASSEMBLED WITH ANTI-SEIZED COMPOUND SPECIFICALLY FORMULATED FOR USE
WITH STAINLESS STEEL IN SIMILAR CONDITIONS AND APPLICATIONS.
5. FOR ALL ITEMS TO BE REPLACED, REMOVE AND DISPOSE OF EXISTING
6. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS IN THE FIELD.
7. ADHESIVE ANCHORS ARE NOT SHOWN AND SHALL BE SUPPLIED AND INSTALLED BY
THE CONTRACTOR.
8. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF EXISTING MESH CLAMPS (HOLD
DOWN CLIP ANGLES) AND REPLACEMENT BY WELDING NEW MESH CLAMPS IN
PLACE. CONTRACTOR WILL ALSO BE RESPONSIBLE FOR TOUCH UP PAINTING
AFTER INSTALLATION.
OF
FILTER UNDERDRAIN
DETAIL
N/A
JTS
BLK JPT
N/A
N.T.S.
ADDENDUM 2 LC 10/09/26
| 01010 |
| 15050 |
| D-100-D-100 |
| Sheets and Views |
| D-100 |
| D-501 |
| Sheets and Views |
| D-501 |
File details come from the government source that posted it. Updated .