Addendum 2.pdf
PDF 193 KB Posted
- Solicitation number
- RFQ 171 190000000413 3
- Issued by
- Benzie County, Michigan
About this file
This is a Construction Bid Addendum issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the MDOC Lakeland Correctional Facility Deaerator Replacement project (File Number 472/18414.SMD). The addendum was issued on May 17, 2019, with a bid opening date of May 22, 2019. The professional responsible for the project is Matrix Consulting Engineers, Inc., with Scott DeKorte serving as Project Director. The addendum includes three key items: a prebid meeting sign-in sheet, specification clarification regarding Superior Boiler Works, Inc. as an approved deaerator manufacturer pending performance verification, and a material specification requiring chemical feed piping to be Schedule 80 CPVC. All bidders are required to acknowledge this addendum in their bid submission, with failure to do so potentially resulting in bid rejection.
The addendum does not contain pricing information, set-aside provisions, incumbent contractor details, or specific funding sources. The document serves solely as a clarification and modification instrument to the original bidding documents, incorporating interpretations necessary for proper bid submission. Addenda will be distributed through www.michigan.gov/SIGMAVSS and become part of the final contract documents. The addendum was approved by Project Director Scott DeKorte and prepared by Brent Huhn of Matrix Consulting Engineers, Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings 18414_Part2.pdf | ||
| Addendum 1.pdf | ||
| Specifications 18414 (S).pdf | ||
| LEIN Request 18414.pdf | ||
| Advertisement 18414.pdf | ||
| Specs (MTC Report pgs 110 - 148).pdf | ||
| Drawings 18414_Part1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
5/17/2019
PROJECT NAME
MDOC Lakeland Correctional Facility – Deaerator Replacement
FILE NUMBER
472/18414.SMD
PROFESSIONAL
Matrix Consulting Engineers, Inc.
PROJECT DIRECTOR
Scott DeKorte
BID OPENING DATE:
5/22/2019
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Prebid meeting sign in sheet (attached)
2. Specification Section 235316 – Deaerator: Superior Boiler Works, Inc is an approved
Deaerator manufacturer pending meeting the performance and specifications.
3. Chemical feed piping to be Schedule 80 CPVC.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Brent Huhn, Matrix Consulting Engineers DATE: 5/17/2019
APPROVED BY:
PROJECT DIRECTOR: Scott DeKorte DATE: 5/17/2019